This Solicitation opportunity from National Aeronautics And Space Administration was posted on May 6, 2026. The submission period has ended. Browse the details below for market research, or find similar active opportunities.
AFP FOR LEASE OF LAND AND BUILDING Located at LC-48 (NASA-KSC)
Contract Overview
Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.
Active Opportunities Like This One
AI Contract Overview
NASA is soliciting proposals for a long-term lease of Launch Complex 48 (LC-48) at Kennedy Space Center, Florida, a 127.66-acre multi-user launch site designed to support the emerging small launch vehicle industry. The lease, structured as an Enhanced Use Lease under NASA’s Other Transactions Authority, will be granted for up to 50 years, including renewal periods, in an “as is, where is” condition, with the existing pad on the north side already in place. Proposals must demonstrate a comprehensive business and technical approach, including operation of the site as a multi-user facility, with priority given to concepts enabling concurrent activities across both developed and undeveloped portions of the site. Evaluation of proposals will be based equally on business approach, technical feasibility, fair market value rent, and financial capability, with higher proposed rents preferred and no single factor carrying more weight than others, allowing for trade-offs across non-price elements. All proposers must comply with stringent security protocols, including NASA badging, background checks, foreign national access controls, and adherence to HSPD-12 and NASA’s Identity and Access Management systems; armed security is prohibited unless arranged through a separate reimbursable agreement. The successful applicant must coordinate closely with NASA and the U.S. Space Force to ensure compatibility with active launch operations at nearby complexes and must assume full responsibility for environmental compliance, hazardous material management, safety standards per NASA-STD-8719.11, and all remediation obligations that persist beyond lease termination. Proposals must be submitted as a single searchable, unlocked PDF not exceeding 45 pages, organized into four required sections, with a deadline of April 10, 2026, at 5:00 PM ET. Financial viability must be substantiated through audited financials, capital investment plans, and risk mitigation mechanisms such as insurance or bonds. The site is accessible only through the secured KSC perimeter, and lessees may be eligible for reimbursable access to specialized infrastructure and services unique to the spaceport. Payment for rent will be processed via electronic funds transfer to NASA’s Shared Services Center using accounting line code 8004904, and all proposed improvements must adhere to NASA’s facility modification procedures and environmental review requirements, including submission of as-built drawings and an Exit Environmental Baseline Survey per ASTM standards.
General Info
Agency
NAICS
Place of Performance
Orlando, FL, 32899, USASet-Aside
Timeline
Submission Closed
Organization & Contact Information
Full Description
NASA has terminated this AFP per section 3 of the AFP, "NASA reserves the right, at any time, without notice, at its sole and absolute discretion to extend any deadline set forth in this AFP or reject all proposals and terminate the AFP process, in whole or in part."
This Announcement for Proposals (AFP) solicits proposals for lease of available Federal property at NASA John F. Kennedy Space Center (KSC or Center) consisting of underutilized, non-excess property at Launch Complex 48 (LC-48) for a site operator (defined below) to operate the entire multi-user site with responsibility for coordination of all activities on LC-48 with NASA and U. S. Space Force operations at KSC and CCSFS.
LC-48 is situated between Launch Complexes 39A and 41. LC-48 is a multi-user launch complex built to encourage and support growth of the emerging small class launch vehicle industry and capable of housing multiple users performing concurrent activities. It may also be able to accommodate landings based on vehicle- and mission-specific parameters provided as part of launch and re-entry licensing and safety assessments. The total proposed area available to be leased is approximately 127.66 acres. The site will be available at selection in “as is”, “where is” condition for up to 50 years, including all renewal periods.
LC-48 is ready for development and is mostly vacant, with an existing pad located on the north side. The site is accessible only through KSC’s secured perimeter. Accordingly, NASA procedures and policies regarding badging, background investigation requirements, foreign national access, and unescorted access to controlled areas apply. Pad users may have the opportunity to obtain on a reimbursable basis certain specialized KSC services and resources for operating the launch site not reasonably available from the private sector which are unique to the nation’s premier spaceport.
Q&A Due by February 6, 2026
AFP Responses Due by April 10, 2026 by 5PM
More opportunities from National Aeronautics And Space Administration → NASA Kennedy Space Center
Same awarding agency
Find Active Opportunities Like This
Get AI-powered intelligence on the opportunities still open
Every page of the solicitation package shredded into a compliance breakdown
AI-powered matching based on your capabilities and past performance
Competitor and incumbent history on the requirement
Automated alerts on amendments, Q&A deadlines, and award
Join 650+ contractors already using CLEATUS
