Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, November 11 at 2:00 PM ET

Register Free →

Aggregate Supply

Active
State & Local

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

Documents

This scope was carved out of 26-215.

The full solicitation package (5 documents), including the RFP, is on the prime solicitation, not on this scope.

View the prime solicitation

East Highlands Sanitary Sewer Replacement Phase II

AI Contract Breakdown

Uniform Contract Format

No documents to break down

The breakdown needs solicitation documents. None were found from this contract's source.

Timeline

Posted

subcontract

Response Deadline

Submission deadline

Response Deadline

Ready to pursue this opportunity?

Get full access to track this contract, build proposals with AI assistance, and manage your pipeline.

Organization & Contact Information

Show more
AgencyIllinois → Public Utilities (Water) | DPU-W
ContactsNo contacts available
OfficeN/A
Office AddressN/A
ContactsNo contact information available

Full Description

Show more
Supplies and hauls granular backfill material for prime contractors on City of Naperville public utility projects. Delivers approximately 200 CU.YD of granular backfill to the project site. Delivers specified aggregate material.

Similar Contracts

Same NAICS industry code

NAICS: 484220
New
Finished Compost Transportation Services
Solicitation # RFP-VC-26-007
The Inland Empire Regional Composting Authority is soliciting proposals under RFP-VC-26-007 for finished compost transportation services from its facility in Rancho Cucamonga, California. The selected contractor will provide the necessary drivers and vehicles, including straight-trucks and various tractor-trailer configurations, to transport approximately 15% to 25% of the facility's monthly production of 20,000 cubic yards. Delivery destinations range from a 20-mile radius up to 350 miles away, with potential requirements for onsite shuttling. The anticipated project start date is February 1, 2027, with an initial five-year term and options for one-year extensions. Proposals must be submitted electronically via PlanetBids by November 12, 2026, and must include a fully burdened fee schedule with fixed pricing for the initial term and a proposed fuel surcharge equation. Evaluation will be based on price and payment terms, the nature of any exceptions taken to the RFP, organizational experience and performance history, and the proposed work plan. This is a prevailing wage contract subject to Section 1770 of the California Labor Code, requiring contractors to be registered with the Department of Industrial Relations and to provide certified payroll with invoices. Contractual requirements include payment and performance bonds equal to the contract price and strict compliance with CAL OSHA, Federal OSHA, and CDFA regulations. The contractor is subject to random bi-monthly joint inspections and may be required to submit monthly vehicle self-inspection reports. Invoices are submitted monthly to the Authority's Accounts Payable Department and are paid within 30 days, though the Authority offers expedited payment options in exchange for a percentage discount. The contract is governed by the laws of the State of California in the County of San Bernardino.
Inland Empire Utilities Agency

POSTED

about 3 hours ago

DEADLINE

in 13 days
View Details

More opportunities from Illinois → Public Utilities (Water) | DPU-W

Same awarding agency

New
SLED
South Operation Center (SOC) Digester Demolition
Solicitation # 26-114
Solicitation 26-114 is an Invitation For Bid issued by the City of Naperville for the South Operation Center (SOC) Digester Demolition. The project involves the demolition and removal of an abandoned digester located at 1800 S. Washington Street, including the filling of the excavation, site restoration, ancillary landscaping, and the installation of security fencing. The scope also requires the identification, handling, and legal off-site disposal of special waste, such as contaminated soil and construction debris, with specific requirements for the packaging and transportation of asbestos-containing materials. The contract will be awarded to the lowest responsible bidder based on criteria including technical capacity, integrity, past performance, and financial resources. The work must be completed by December 31, 2027, with construction operations limited to Monday through Friday from 7:00 a.m. to 4:00 p.m. A contingency allowance of $25,000 is provided for unforeseen work, while failure to achieve final completion is subject to liquidated damages of $250 per calendar day. The contractor is required to provide performance and payment bonds equal to the contract price and must comply with the State of Illinois Prevailing Wage Act and 2010 ADA Standards. Bids must be submitted electronically by December 11, 2026, and include a bid deposit equal to 10% of the total bid. All work must adhere to standards set by IDOT, the City of Naperville, ISPE, FHWA, AASHTO, ANSI, NEMA, and CFR 29 Part 1910.

POSTED

about 12 hours ago

DEADLINE

in about 1 month
View Details
New
SLED
East Highlands Sanitary Sewer Replacement Phase II
Solicitation # 26-215
The East Highlands Sanitary Sewer Replacement Phase II project, solicitation number 26-215, is a public works contract issued by the City of Naperville's Public Utilities (Water) department. The scope of work involves filling and abandoning existing sanitary sewers and manholes and installing approximately 4,400 linear feet of 8-inch and 1,000 linear feet of 10-inch new sanitary sewers, along with manholes and 6-inch services. Work will be performed across several locations, including E Hillside Rd, Sunset Dr, Thornwood Dr, Pine Ct, Santa Maria Dr, Willow Rd, and Diane Ln. The project also encompasses roadway and driveway patching, curb and gutter replacement, traffic control, landscape restoration, and television inspection of installed sewers. All construction must adhere to the latest IDOT Standard and Supplemental Specifications, and sidewalk work must comply with current ADA guidelines. The contract will be awarded to the lowest responsible bidder based on price, experience, performance history, and financial resources. Bidders must provide a bid deposit equal to 10% of the total bid and, upon acceptance, furnish performance and payment bonds equal to the contract price. The project is subject to the Illinois Prevailing Wage Act, requiring certified payroll filings. Performance begins upon the issuance of a Notice to Proceed, and failure to meet the final completion date results in liquidated damages of 1,000 dollars per calendar day. Payment is processed via monthly applications for payment, with final payment contingent upon the approval of record drawings by the Engineer. The contract is subject to the approval of sufficient appropriations by the City Council.

POSTED

about 12 hours ago

DEADLINE

in about 1 month
View Details
NAICS: 237110
New
SLED
Cress Creek Water Main Improvements
Solicitation # 26-176
The Cress Creek Water Main Improvements project, solicitation 26-176, involves the replacement of approximately 9,600 feet of aging cast iron water mains installed in the 1960s and 1970s. The work is located within the Cress Creek Subdivision of Naperville, Illinois, specifically along Summit Hills Lane, Heatherton Drive, Thunderbird Lane, Briargate Drive, and Royal Bombay Court. The project requires upsizing existing 6 to 10 inch pipes to 8 and 12 inch ductile iron pipes in accordance with City Standards. The performance period begins upon execution, with a substantial completion date of October 31, 2027, and a final completion date of June 30, 2028. The contract will be awarded to the responsible bidder submitting the lowest responsive bid for either the Total Base Bid or Total Alternate A Base Bid. Bidders must be pre-qualified by the Illinois Department of Transportation in drainage and provide several documents at the bid opening, including a 10 percent bid deposit, an IDOT BC 57 Affidavit of Availability, and a Certificate of Insurance. The project is classified as a public work under the Illinois Prevailing Wage Act, requiring compliance with prevailing wage rates and certified payroll filing. Contract administration includes net 30 payment terms via electronic transfer and a four-year audit and records retention period. The City maintains the right to cancel the contract for non-performance, providing a 14-day cure period. Technical requirements include adherence to IDOT standards for concrete, ADA compliance for sidewalk curb ramps, and the submission of a Contractor Safety Orientation Checklist within 30 days of the award. The contractor is responsible for all quality control testing and the preservation of site benchmarks.
Water and Sewer Line and Related Structures Construction

POSTED

1 day ago

DEADLINE

in 19 days
View Details

Ready to Pursue This Opportunity?

Get AI-powered intelligence on this solicitation and the ones like it

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 750+ contractors already using CLEATUS