Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, October 28 at 2:00 PM ET

Register Free →

Agriculture and Irrigation - Request for Proposal - Driedmeat Lake Outlet Structure and Fishway Repair Assessment

Active
AB-2026-06742International

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

AI Contract Overview

Show more

The Agriculture and Irrigation agency is seeking proposals for the Driedmeat Lake Outlet Structure and Fishway Repair Assessment in Alberta. The primary goal of this project is to evaluate the structural integrity and overall condition of the concrete apron and fishway to determine necessary repairs, rehabilitation, or full replacement. Key focus areas include assessing concrete deterioration, checking for voids beneath the apron, and identifying structural deficiencies in the steel components of the fish ladder. The investigation is intended to take place during late fall to take advantage of low-flow conditions and maximize access to critical structural elements. Because some water will continue to flow through the fish ladder due to existing deterioration, the selected consultant must provide a viable method for inspection under these specific conditions. Interested parties must submit their responses by October 27, 2026.

General Info

Assessment of Driedmeat Lake Outlet and Fishway repairs in Alberta due October 27, 2026.

Place of Performance

AB, CAN

Set-Aside

NONE

Documents

0

No documents available

Documents will appear here when they are available.

AI Contract Breakdown

Uniform Contract Format

No documents to break down

The breakdown needs solicitation documents. None were found from this contract's source.

Timeline

PhaseSolicitation
Posted

Solicitation

Response Deadline

Submission deadline

Response Deadline

Ready to pursue this opportunity?

Start your free trial to track this contract, build proposals with AI assistance, and manage your pipeline.

Organization & Contact Information

Show more
AgencyAgriculture and Irrigation
Contacts1 person available
OfficeN/A
Organization / AgencyAgriculture and Irrigation
Office AddressN/A
Contacts
Parooj RajbhandariWater Projects Mgmt Engineer

Full Description

Show more
The primary objective of this study is to assess the overall condition and structural integrity of the apron and fishway and provide recommendations for repair, rehabilitation, or replacement as required. The assessment will include a detailed evaluation of the deteriorated concrete apron, including the extent of concrete deterioration, the effectiveness of ongoing repairs, and the potential presence of voids beneath the structure that may affect its performance and stability. The condition of the fish ladder, with particular attention to the deteriorated steel components, will also need to be evaluated to identify structural deficiencies, maintenance requirements and repair options. The investigation should ideally be carried out in late fall under low-flow conditions, where there is no water flowing over the weir to maximize access to critical structural elements and facilitate a comprehensive inspection. There will be some water flowing through the fish ladder even when the gate is closed due to the deterioration mentioned above. The consultant should plan for a method to inspect the inspect the fish ladder under these conditions.

Similar Contracts

Same NAICS industry code

NAICS: 541330
New
SLED
QBS/PS/DOT/2610-1270098 PATH Lakewood
Solicitation # PE-66062-NONST-2027-000000503
The City of Atlanta, in partnership with the PATH Foundation, is soliciting a qualified consultant for the design of a paved shared use path connecting the Southside Beltline Trail to the Southtowne Trail at South Bend Park. The project is structured in two phases, with the current focus on Phase I, which extends from the Southside Trail to Pryor Road at Meldon Avenue. The selected consultant will be responsible for reviewing and validating the 2021 concept report, preparing preliminary and final design plans, and developing the necessary NEPA documentation. The scope also includes extensive stakeholder engagement, including a Public Information Open House and multiple stakeholder meetings, to ensure the design accounts for public feedback and the needs of users with disabilities. This is a master contract delivered via task orders with a base period of three years and a one-year renewal option. The project timeline begins with a Notice to Proceed in Q3 2026, with final construction plans expected to be ready for bidding by Q1 2030. All design work must comply with GDOT Engineering Design Guide and Project Planning Guide standards, as well as the GDOT Plan Development Process and FHWA Grant Agreements. Evaluation of consultants will be based on their experience designing off-system paved trails in Atlanta and Georgia, their ability to manage budgets, their collaboration with the PATH foundation, and their capacity to produce high-quality technical plans. Key personnel required for the project include a Project Manager and leads for Roadway Design, Environmental/NEPA, and Stakeholder Engagement.
City of Atlanta

POSTED

about 12 hours ago

DEADLINE

in 16 days
View Details
NAICS: 541330
New
SLED
TxDOT Aviation Division- Notice to Consultants
Solicitation # RFQ26ALCMRCE00015
The Texas Department of Transportation Aviation Division is soliciting qualifications from professional firms to develop an Airport Layout Plan (ALP) with Narrative for the Commerce Municipal Airport. The scope of work is divided into three primary phases: a kick-off phase focused on strategic planning and public outreach, Phase I covering aviation demand forecasts and planning standards, Phase II addressing land use alternatives and facility requirements, and Phase III involving the final development plan, Capital Improvement Plan (CIP), and an 18B Obstruction Survey. All work must comply with the latest FAA Master Plan Advisory Circular and specific TxDOT Standard Operating Procedures. Interested firms must submit a Qualifications Statement of no more than nine pages via the TxDOT Aviation eGrants system by November 10, 2026, at 2:00 PM CST. Selection will be based on a 100-point scale evaluating capability and qualifications, recent experience with comparable airport plans, performance reliability, and the proposed technical approach and schedule. Mandatory submission requirements include a written certification regarding the National Defense Authorization Act and the Department of Commerce's foreign adversaries list. The selected firm will subsequently enter a fee proposal and negotiation phase to establish the final contract value.
Texas Department of Transportation

POSTED

about 13 hours ago

DEADLINE

in 27 days
View Details

More opportunities from Agriculture and Irrigation

Same awarding agency

NAICS: 237110
International
Agriculture and Irrigation - Request for Proposal - Irrigation Repair and Replacement
Solicitation # AB-2026-06638
This project involves the reorganization and optimization of irrigation systems across the Brooks and Bow Island areas to increase irrigated acreage and support agricultural research in Southern Alberta. A single contractor will be responsible for a two-phase turnkey operation. Phase one requires the relocation of two seven-tower linear pivots from the County of Forty Mile to six separate fields in the County of Newell, including the installation of generators, panels, and guidance systems. Phase two focuses on the Bow Island site, involving the removal of old mainlines and electrical services, and the installation of a new mainline, power systems, VFD, and a remote-operated center pivot with a minimum capacity of 1000 GPM. All work must be completed between the 2026 harvest and the 2027 seeding season to ensure full irrigation capacity for the 2027 field season. The project requires coordination between multiple stakeholders, including the Counties of Newell and Forty Mile, the Ministry of Infrastructure, and various irrigation districts. Interested parties must contact the Contracting Manager by October 12, 2026, to schedule a site visit for October 13, 2026. Proposals are due by November 6, 2026, under solicitation number AB-2026-06638.
Water and Sewer Line and Related Structures Construction

POSTED

13 days ago

DEADLINE

in 23 days
View Details

Ready to Pursue This Opportunity?

Get AI-powered intelligence on this solicitation and the ones like it

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 750+ contractors already using CLEATUS