This Solicitation opportunity from Colorado was posted on February 28, 2025. The submission period has ended. Browse the details below for market research, or find similar active opportunities.
HighAI Summary for AHEC-25710-B: Temporary Boilers and Boiler Repairs: Advertisement for Bids (Design/Bid/Build) issued by the State of Colorado for the Auraria Higher Education Center (AHEC). The project involves the replacement of two Patterson-Kelley MACH C4000 boiler heat exchangers at the Auraria Library, with an estimated cost of $250,000. The document outlines the scope of work, minimum bidder requirements (including experience and bonding capacity), a mandatory pre-bid meeting on March 4, 2025, and a bid submission deadline of March 13, 2025.
DOCX
DOCX, High priority: read this firstsow
HighAI Summary for AL-Boiler HXs - Scope of Work: Scope of Work for the replacement of two Patterson-Kelley MACH C4000 boiler heat exchangers (BLR-1 and BLR-2) in room P200J of the Auraria Library. The document details disassembly, demolition, installation, field quality control for bypass valve operation, and special site conditions regarding access, parking, and waste disposal coordinated with AHEC Facilities.
PDF
PDF, High priority: read this first1 page · specifications
HighAI Summary for Auraria Library - Current Plan (05/05/2020): Technical plan document for the Auraria Library located at 1155 10th St, Denver, CO. The document includes a detailed list of room identifiers and corresponding square footage (SF) measurements. Original issue date 06/13/2019, revised 05/05/2020.
PDF
PDF, High priority: read this firstspecifications
HighAI Summary for Auraria Library Renovation - HWS Boiler Plant Sequence of Operations: Technical specifications and sequence of operations for the Heating Water Supply (HWS) boiler plant at the Auraria Library Renovation. The document details the operational logic for heating water pumps (HWP-1 and HWP-2), minimum system flow valves, boiler operation (B-1, B-2, B-3), isolation valves, and building heating water supply temperature reset logic.
PDF
PDF, High priority: read this firstspecifications
HighAI Summary for Auraria Library State II Bid Drawings - Inline Pump Assembly: Technical bid drawings and specifications for an inline pump assembly greater than 2-1/2 inches for the Auraria Library State II project, prepared by the electrical engineer.
PDF
PDF, High priority: read this first1 page · specifications
HighAI Summary for M5.02 Auraria Library State II - Heating Water Control Schematic: Technical drawing and sequence of operations for the boiler plant control system at the Auraria Library Renovation State Phase II. The document details the operational logic for heating water pumps (HWP-1, HWP-2), boiler operation (B-1, B-2, B-3), isolation valves, and temperature reset logic based on outdoor air temperature and zone demand. It includes a control schematic and identifies the engineering firms involved.
DOCX
DOCX, High priority: read this firstbid-bond
HighAI Summary for Project 1004103 - Appendix B1 Bid Bond: A standard bid bond form for the State of Colorado Office of the State Architect, Project No. 1004103 (Temporary Boilers and Boiler Repairs) at the Auraria Higher Education Center. It requires a guaranty of 5% of the total bid price and mandates that the bond be accompanied by a Power of Attorney to avoid being deemed non-responsive.
DOCX
DOCX, High priority: read this firstspecifications
HighAI Summary for Project 1004103 - Direct Labor Burden Calculation: A State of Colorado Office of the State Architect form for the Auraria Higher Education Center (Project 1004103: Temporary Boilers and Boiler Repairs). This document requires contractors and major subcontractors to list the percentage of total labor overhead (taxes, pensions, insurance, etc.) to be used for calculating future Change Order Proposals.
DOCX
DOCX, High priority: read this firstcontract-document
HighAI Summary for Project 1004103 - Temporary Boilers and Boiler Repairs Agreement: A Design/Bid/Build (D/B/B) Contractor's Agreement (State Form SC-6.21) between the State of Colorado, acting through the Auraria Higher Education Center, and a contractor for the 'Temporary Boilers and Boiler Repairs' project (Project #1004103). The document outlines performance requirements, time of completion, and contract sum, and includes signature blocks for the Contractor, the State Architect, and the Center's CFO.
DOCX
DOCX, High priority: read this firstrfb
HighAI Summary for Project 1004103 - Temporary Boilers and Boiler Repairs Bid Form: Bid form for the State of Colorado Office of the State Architect for Project 1004103 (Temporary Boilers and Boiler Repairs) at the Auraria Higher Education Center. The document includes sections for base bid pricing, completion timelines, certifications regarding Colorado labor (80% requirement), SDVOSB status, and bid guarantee requirements. It references a solicitation date of 2/27/2025.
DOCX
DOCX, High priority: read this firstitb
HighAI Summary for Project 1004103 - Temporary Boilers and Boiler Repairs - Information for Bidders: This document provides critical bidding instructions for the State of Colorado's Office of the State Architect regarding Project 1004103 (Temporary Boilers and Boiler Repairs) at the Auraria Higher Education Center. It outlines requirements for the bid form, bid security (5% for bids over $50,000), tax exclusions, and the 'or equal' substitution process. Additionally, it details the method of award based on the lowest responsible bidder, including the handling of additive and deductible alternates and compliance with Colorado state laws regarding prevailing wages and embodied carbon emissions.
DOCX
DOCX, High priority: read this firstcontract-document
HighAI Summary for State Form SC-6.23: General Conditions of the Contractor’s Design/Bid/Build Agreement: This document outlines the General Conditions for a Design/Bid/Build (D/B/B) Agreement for the State of Colorado, Office of the State Architect, State Buildings Program. It establishes the legal and operational framework for construction contracts, covering definitions, execution, insurance requirements, payment processes, change orders, dispute resolution, and termination procedures.