Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, October 28 at 2:00 PM ET

Register Free →

This Sources Sought opportunity from Department Of Defense was posted on March 3, 2022. The submission period has ended. Browse the details below for market research, or find similar active opportunities.

Aircraft Carrier and Submarine Maintenance & Material Planning and Forecasting Analysis

Closed
N00024-22-R-4310Federal

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

Active Opportunities Like This One

NAICS: 541618
New
International
The Provision of Equipping Consultancy Services
Solicitation # C476248
Frimley Health NHS Foundation Trust is procuring equipping consultancy services for the New Frimley Park Hospital programme under solicitation C476248. The contract primarily covers RIBA Stage 2 (Concept Design) and RIBA Stage 3 (Spatial Coordination), with a potential option to extend into RIBA Stage 4. The estimated contract value is 166,019 GBP excluding VAT. The selected provider will be responsible for developing the Equipping Strategy and Equipment Governance Framework in alignment with New Hospital Programme and Hospital 2.0 guidance, managing the Master Equipment Schedule, and leading stakeholder engagement across clinical, operational, and digital teams. Key deliverables include equipment categorisation, Room Data Sheet validation, BIM alignment, and the development of a procurement strategy and risk register. An optional asset audit of existing equipment may also be requested. The procurement is being conducted as an open procedure under the Procurement Act 2023, with a tender submission deadline of November 16, 2026. Evaluation is based on a quality-to-cost ratio of 80% and 20%, respectively, while conditions of participation are assessed on a pass/fail basis. The provider is expected to deliver evidence-led outputs that integrate with the wider design, cost, and programme workstreams, emphasizing sustainability, value for money, and clinical engagement. All submissions and communications must be managed through the designated electronic tendering portal.
Frimley Health NHS Foundation Trust

POSTED

about 3 hours ago

DEADLINE

in 27 days
NAICS: 541618
New
International
Needs Assessment and Planning Study for Karen Magnussen and Ron Andrews Community Recreation Centres
Solicitation # RFP-064-26
The District of North Vancouver is seeking proposals from qualified multi-disciplinary consultant teams under solicitation RFP-064-26 to conduct a service and space needs assessment and an options and feasibility study for the Karen Magnussen and Ron Andrews Community Recreation Centres. The primary objective is to establish an evidence-based foundation for future council decisions regarding the delivery of recreation and community services in the Lynn Valley and Seymour service areas. The scope includes evaluating whether existing facilities can support these services or if renewal, upgrades, expansion, replacement, relocation, or consolidation is required, while also determining the priority, timing, and affordability of potential investments. The procurement process is based on best overall value and follows a two-stage evaluation: a review of mandatory submission requirements, including the Proponent Information Form and Financial Proposal, followed by a technical and financial rating. The successful proponent will be required to provide a comprehensive project team with proven experience in decision-ready options analysis for public sector recreation projects. Deliverables include public and user group engagement, detailed analysis of operational impacts, and a final set of recommendations. The contract requires Commercial General Liability and Professional Liability insurance, with monthly invoicing submitted as PDFs to the District. Proposals must be submitted electronically via the District's Bidding System by the specified deadline.
District of North Vancouver

POSTED

1 day ago

DEADLINE

in about 1 month
NAICS: 541618
New
International
Local Government Data Sharing Playbook: Multi-Agency Sharing in Children’s Social Care
Solicitation # LG-05276
The Improvement and Development Agency for Local Government (IDeA), acting for the Local Government Association (LGA), is soliciting proposals for the creation of a specialized module for its data sharing playbook. This project focuses on designing, managing, and maintaining multi-agency data sharing within public sector Children’s Social Care. The successful bidder will be required to produce research reports, a practical playbook module containing guidance on risks and mitigations, and evidence-based case studies. All work must be grounded in the statutory and governance context of English local government and adhere to strict data protection and digital accessibility standards. The project must be completed by March 31, 2027. The contract has a maximum budget of 50,000 GBP exclusive of VAT, with payments structured across three milestones: 25% upon delivery of the delivery plan, 25% upon completion of the second phase, and 50% upon final delivery of all resources. Award decisions will be based on the highest overall score, weighted across quality and price. Quality evaluation focuses heavily on relevant skills and experience (40%), delivery methodology (20%), and the ability to meet the timescale (20%), with additional weight given to output practicality and innovation. Bidders must submit their proposals by November 9, 2026, including a detailed financial breakdown, a signed contractual undertaking, and evidence of their equality, diversity, and inclusion policies.
Improvement and Development Agency for Local Government (IDeA)

POSTED

1 day ago

DEADLINE

in 20 days
NAICS: 541618
New
SLED
Connect SoCal 2050 (Financial Plan) Technical Assistance Services
Solicitation # 27-024
The Southern California Association of Governments (SCAG) is soliciting proposals under solicitation number 27-024 for technical assistance services to support the development of Connect SoCal 2050. The primary objective is to provide technical support for the assessment of transportation projects, programs, and strategies, with a specific focus on financial and economic modeling. Key responsibilities include updating the Regional Transportation Plan (RTP) financial model, evaluating revenue sources, and analyzing the impact of vehicle electrification on fuel tax revenues. The project emphasizes a fix-it-first approach to prioritize the preservation of the existing multimodal transportation system and aims to reduce greenhouse gas emissions and vehicle miles traveled. Deliverables include a work program, progress reports, the Connect SoCal 2050 Congestion Management Technical Report, and updated financial tools utilizing the Cal-B/C benefit cost model. The contract is structured as a lump sum with progress payments, with an estimated period of performance ending on June 30, 2029. Proposals must be submitted via PlanetBids by November 12, 2026, consisting of a technical proposal in PDF format and a cost proposal in an Excel workbook. Award decisions will be based on best value or the most qualified firm, with cost serving as a significant factor. Eligible consultants must possess a valid business license and an adequate financial management system compliant with 48 CFR and 2 CFR standards. Required documentation for all prime and sub-consultants includes certifications for debarment and suspension, conflict of interest forms, and acknowledgments of the California Public Records Act. The successful proposer will be required to sign SCAG's standard contract template and provide a certificate of insurance prior to the final award.
Contracts Department of Southern California Association of Governments

POSTED

2 days ago

DEADLINE

in 23 days

General Info

NAICS

541618 - Other Management Consulting Services

Place of Performance

DC, USA

Set-Aside

NONE

Documents

0

No documents available

Documents will appear here when they are available.

AI Contract Breakdown

Uniform Contract Format

No documents to break down

The breakdown needs solicitation documents. None were found from this contract's source.

Timeline

PhaseClosed
Posted

Sources Sought

Response Deadline

Deadline has passed

Submission Closed

Find active opportunities like this

Start your free trial to discover similar active contracts, track opportunities, and build proposals with AI assistance.

Organization & Contact Information

Show more
AgencyDepartment Of Defense → Navsea Hq
Contacts2 people available
OfficeWASHINGTON NAVY YARD, DC, 20376-5000, USA
Office AddressWASHINGTON NAVY YARD, DC, 20376-5000, USA

Full Description

Show more
Sources Sought Announcement Submarine Class Maintenance Planning analysis in support of sustainment and life cycle maintenance. Material Forecasting analysis in support of Aircraft Carrier maintenance. Agency: Department of the Navy Office: SUBMEPP, field activity of Naval Sea Systems Command (NAVSEA) Location: Building 86, Portsmouth Naval Shipyard, Kittery Maine INTRODUCTION: This is a sources sought announcement in accordance with FAR 15.201. SUBMEPP, a field activity of the Naval Sea Systems Command (NAVSEA) is conducting market research to determine industry capability and interest in the development of an Intelligent Class Maintenance Plan (iCMP) that integrates the Submarine Maintenance Planning and Engineering Analysis process, producing, but not limited to, Submarine CMP System Health assessment (e.g. Health dashboards) and analyses. The development of assessing system health via dashboards and analyses, supports SUBMEPP moving towards a data analytics enabled organization that aligns with strategic initiatives associated with digital transformation. Additionally, SUBMEPP is looking for analysis of unplanned submarine nuclear work based on existing unplanned submarine non-nuclear work analysis. Additionally, in partnership with NAVSEA CVN PST, SUBMEPP is conducting market research to determine industry capability and interest in the development of an analytical Material Forecast for Aircraft Carriers based on the existing Material Forecast model for submarines and analysis of unplanned Carrier work based on existing unplanned submarine work analysis. The Government is seeking responses from sources that can provide these analyses within one year of award of a contract. INSTRUCTIONS TO INTERESTED PARTIES: Interested companies should submit, on company letterhead, a notice of interest including the company name, Commercial and Government Entity (CAGE) code, mailing address, place of performance, and an appropriate point of contact information. Responses must also identify if the company is a large or small business. All information in responses shall be unclassified. The response format shall be data files emailed White papers shall be limited to twelve pages with two additional pages for technical drawings. Acknowledgment of receipt of white papers will be made, but the white papers will not be returned. Email Response Instruction: Email Subject: ICDC Sources Sought Response SUBMEPP Sent Email To: CAPT Ryan Perry (Contracting Officer); ryan.m.perr@navy.mil Ethan Breitenbach (Contract Specialist); Ethan.g.breitenbach.civ@us.navy.mil WORK REQUIREMENTS This announcement is seeking a contractor to work directly with the Navy to conduct business process assessments, data mapping and curation, using the CRISP-DM methodology or equivalent, that can be executed in a government owned data environment. This includes, leveraging data science tools (such as Python, Tableau, or Microsoft Power BI), and creating new data models, testing data models , generating analyses/model outputs and publishing associated results. This may include, creating secure and portable data models for government integration into the iForecast or other SUBMEPP Applications, testing data models (such as for model performance, stability, and sensitivity) adhering to SUBMEPP coding and data modelling standards, creating models in congruence with previous iForecast data models, publishing outputs from data models/analyses as required by SUBMEPP, and leveraging comprehensive data science tools. The contractor must have experience in Navy material forecasting and have experience working with Navy material data. Requirements for the Contractor are as follows: For Navy CVN Maintenance Material Forecasting: Provide knowledge and expertise of the Navy Maintenance Planning and Execution Processes and the Navy Supply Chain. Perform Business Analysis and develop data logic to support expansion of material forecasting to Navy CVN maintenance Develop a robust data model for forecasting the Navy CVN material needs. The model shall be able to be easily integrated with the iForecast Application and existing NAVSUP and DLA supply transaction processes. Have firsthand knowledge of the Navy's material data systems and experience drawing data from some systems Deliver iForecast Material Forecasting for CVNs within 12 months of task award. For All Contract Tasks: The vendor shall have familiarity with Navy Class Maintenance Planning, Navy execution work planning, Navy shipyard work execution, Navy material procurement processes and experience working with associated data systems Provide Data Engineering and Data Science support and data model development, with MS SQL Server and Data Science tools (i.e., Python) expertise. Provide sustainability planning by comprehensive documentation of all business processes, data environment/model logic, and work procedures/instructions. Generate outputs and publish results of developed analyses and data models as required by SUBMEPP Provide Staff that is cleared for Privileged Access into Navy IT systems and is Cyber Security Workforce (CSWF) compliance to allow access to data to start work within the system upon contract execution. This sources sought is intended to identify potential companies that can provide state of the art data analysis methodologies that integrate in with maintenance planning processes as part of a comprehensive process re-engineering and innovation approach to maintenance and material planning. White papers should address the submitter's technical expertise and the technical approach of fulfilling each of the requirements below. CVN Maintenance Material Forecasting Aircraft Carrier (CVN) Maintenance and Material Planning (Intermediate and Depot Levels). Research, assess, evaluate, and document all maintenance planning, execution, and supply chain business processes within the CVN Maintenance domain. Develop and formalize an approach to link business process workflows to authoritative data sources to produce forecasts of future material requirements. Data collection and model architecture development and definition (CVN Classes): Develop, document and execute a process to collect data from authoritative sources. Architect requirements for the integration of collected data into the SUBMEPP Data Analytics environment. Data model development, testing, and outputs (CVN Classes): Develop forecasting data modelling within the current data analytics environment for CVN material requirements while maintaining SUBMEPP coding and data analytics standards and ensuring future compatibility with the production iForecast Application. Develop and execute plans for model optimization, testing, and output generation of new model functionality in the SUBMEPP Data Analytics Environment. Data Model Performance (CVN Classes): Material forecasting model performance will be optimized to balance the effectiveness and utilization of the forecast. Effectiveness is the ratio of material in scope for forecasting used for actual Navy maintenance to the material predicted by the forecast model. Utilization is the ratio of material in the forecast to in scope material for forecasting used for actual Navy maintenance. The model shall perform better than the existing CVN material forecasting processes. Stakeholder Management and Communications (CVN Classes): Provide support for communicating project status, resource requirements, and overall product documentation. Stakeholders for this effort range from working level team members within stakeholder organizations to senior leaders within the enterprise domain. Materials must be produced to support engagements at all levels. Sustainment Planning (CVN Classes): Design and document future processes and resource requirements to support sustainment, enhancement, and expansion of the functionality developed for maintenance material forecasting for CVN Class Aircraft Carriers. Develop roadmaps to ensure that programmatic growth and IT infrastructure remain in alignment; this shall include required workloads, skills, and abilities of personnel and IT tools that will augment future development. SUBMEPP Intelligent Class Maintenance Planning (iCMP) Submarine Class Maintenance Planning and Maintenance Planning and Engineering Analysis (MPEA): Perform complete Value Stream Analysis of Submarine Class Maintenance Planning processes including the Maintenance Planning and Engineering Analysis process. Identify workflows, decision points, data sources used, and inputs from, or outputs to, other processes (i.e., Work Packaging, Cost Engineering, Post Availability Autopsies), etc. This analysis would support the incorporation of several factors including but not limited to component failure rates, corrective maintenance, maintenance performed early, unplanned maintenance as contributors to an overall health assessment of a submarine maintenance plan. In conjunction with process owners and subject matter experts, develop action plans to implement selected improvements and support SUBMEPP in execution of developed action plans. Any process changes should not impact technical rigor essential for achieving safe and reliable submarine operations. Data collection and model architecture development and definition. Develop and document a process to collect relevant data from similar or new authoritative sources, execute the data collection process, and architect requirements for the integration of data into the SUBMEPP Data Analytics environment. Data Model development, testing, and outputs. Working with the Government Program Manager and Government Subject Matter Experts, design, optimize, test, execute and publish outputs of data models/analysis. Outputs include but are not limited to dashboards (e.g., SWLIN specific dashboards, heat maps), data visualizations, spreadsheets and to be made as required by SUBMEPP, to provide information to internal or external stakeholders. Identify innovation approaches to Submarine CMP and MPEA Business Processes. Assess business processes associated with CMP and MPEA. Prepare and facilitate workshop(s) with stakeholders. This shall include the development of workshop agendas, documentation, etc. Collect, review, and understand all applicable business process documentation associated with CMP and MPEA process. Stakeholder Management and Communications: Provide support for communicating project status, resource requirements, and overall product documentation. Stakeholders for this effort range from working level team members within stakeholder organizations to senior leaders within the enterprise domain. Materials must be produced to support engagements at all levels. Submarine Nuclear Unplanned Work Analyses Development of Unplanned Work Analysis for Submarine Nuclear work requirements: Expand upon the VA Class EDSRA Unplanned Work Analysis (aka iForecast Work) and develop a similar analysis for Nuclear work requirements that provide analytical outputs to identify critical or high risk work items in availabilities that may be contributing to schedule execution performance, namely, delays to availability completion due to unplanned work, unavailable/non-provisioned material, and insufficient resource planning. This analysis identifies components which are both high risk and high probability that can be considered for future and ongoing availabilities. Business Process Assessment: Research, assess, evaluate, and document applicable business processes associated with creating an unplanned work analysis for submarine Nuclear systems. Data collection and model architecture development and definition. Develop and document a process to collect relevant data from similar or new authoritative sources, and architect requirements for the integration of data into the applicable Data Analytics environment. Work with stakeholders to determine common understanding of criticality factors. Data Model development, testing, and output. Working with the Project Lead for the business area and Subject Matter Experts, design and publish analysis in the form of a dashboard using data visualization software along with other visualizations as required to provide information to relevant stakeholders. Develop data modelling while maintaining SUBMEPP coding and data analytics standards and ensuring future compatibility with the production iForecast Application. Develop and execute plans for model optimization, testing, and output generation of new model functionality in the SUBMEPP Data Analytics Environment Stakeholder Management and Communications (CVN Classes): Provide support for communicating project status, resource requirements, and overall product documentation. Stakeholders for this effort range from working level team members within stakeholder organizations to senior leaders within the enterprise domain. Materials must be produced to support engagements at all levels. CVN Unplanned Work and Availability Execution Analyses Development of Unplanned Work Analysis for Unplanned Work for Aircraft Carriers: Expand upon the VA Class EDSRA Unplanned Work Analysis (aka iForecast Work) and develop a similar analysis for Aircraft Carrier requirements that provide analytical outputs to identify critical or high risk work items in availabilities that may be contributing to schedule execution performance, namely, delays to availability completion due to unplanned work, unavailable/non-provisioned material, and insufficient resource planning. This analysis identifies components which are both high risk and high probability that can be considered for future and ongoing availabilities. Business Process Assessment: Research, assess, evaluate, and document applicable business processes associated with creating a unplanned work analysis for submarine Nuclear systems and Aircraft Carrier unplanned work. Develop and formalize an approach to link business process to new and existing authoritative data sources to produce a dashboard. Data collection and model architecture development and definition. Develop and document a process to collect relevant data from similar or new authoritative sources, and architect requirements for the integration of data into the applicable Data Analytics environment. Work with stakeholders to determine common understanding of criticality factors. Data Model development, testing, and output. Working with the Project Lead for the business area and Subject Matter Experts, design and publish analysis in the form of a dashboard using data visualization software along with other visualizations as required to provide information to relevant stakeholders. Develop data modelling while maintaining SUBMEPP coding and data analytics standards and ensuring future compatibility with the production iForecast Application. Develop and execute plans for model optimization, testing, and output generation of new model functionality in the SUBMEPP Data Analytics Environment Stakeholder Management and Communications (CVN Classes): Provide support for communicating project status, resource requirements, and overall product documentation. Stakeholders for this effort range from working level team members within stakeholder organizations to senior leaders within the enterprise domain. Materials must be produced to support engagements at all levels. Applicable to All Tasks At time of award and throughout contract duration, contractor personnel must meet and maintain the Cybersecurity Workforce qualification requirements in accordance with DoDD 8140.01, DoD 8570.01-M, SECNAV 5329.2, and their supporting issuances. Personnel requiring privileged access to accomplish tasks will have their Cybersecurity Workforce (CSWF) baseline certification prior to working on said tasks. Additional CSWF Operating System/ Computing Environment (OS/CE) requirements will be accomplished with in 180 calendar days from assignment to SUBMEPP's CSWF program. DISCLAIMER This is a Sources Sought/Request for Information (RFI) notice only. This RFI is for informational planning purposes and is not to be construed as a commitment by the Government for any actual procurement of materials, machinery, or services. This notice does not constitute a solicitation or a promise of a solicitation in the future. This RFI does not commit the Government to contract for any supply or service. Respondents are advised that the Government will not pay for any information or administrative costs incurred in response to this RFI. All costs associated with responding to this RFI are solely at the responding parties expense. It is desirable that data be received with unlimited rights to the Government. Nevertheless, we recognize that proprietary data may be included with the information provided. If so, clearly mark such proprietary information and clearly separate it from the unrestricted information as an addendum. Respondents are solely responsible for properly marking and clearly identifying any proprietary information or trade secrets contained within their response. The Government will not be liable for, or suffer any consequential damages for any proprietary information not properly marked and clearly identified. Proprietary information received in response to this RFI will be safeguarded and handled in accordance with applicable Government regulations. Responses to this notice are not offers and will not be accepted by the Government to form a binding contract or agreement. The Government will not be obligated to pursue any particular acquisition alternative because of this RFI. Responses to the RFI will not be returned. Not responding to this RFI does not preclude participation in any future solicitation, if one is issued. Specific responses to the approaches will not disqualify or have an impact on participation and evaluation on future solicitations.

More opportunities from Department Of Defense → Navsea Hq

Same awarding agency

NAICS: 334511
New
Federal
AN/BYG-1 Applications Re-Architecture
Solicitation # N0002426R6222
Solicitation N0002426R6222, issued by the Naval Sea Systems Command (Navsea HQ), seeks a contractor for the AN/BYG-1 Applications Re-Architecture. This effort involves the re-architecting of applications associated with the AN/BYG-1 system. The solicitation was posted on October 7, 2026, with a response deadline of November 5, 2026. The primary point of contact for the effort is Michael Ravnitzky, with Matthew C. Hedrick serving as the Contracting Officer. Due to the sensitive nature of the work, strict security and data handling requirements are in place. Offerors must possess a SECRET security clearance and provide a verified DD Form 2345 Military Critical Technical Data Agreement and a signed Terms of Use Agreement to access Government Furnished Information, source code, and technical documents. All data must be handled in accordance with NISPOM standards, and the transmission of information to foreign nationals or outside the United States is prohibited without a valid export license. Furthermore, the use of public cloud repositories or external AI tools for processing technical data is strictly forbidden. Contractors are required to destroy all provided data within 180 days of the RFP closing and maintain destruction records for five years.
Search, Detection, Navigation, Guidance, Aeronautical, and Nautical System and Instrument Manufacturing

POSTED

1 day ago

DEADLINE

in 16 days
View Details
NAICS: 334511
New
Federal
Navy Electronic Chart Display and Information System (ECDIS) Hardware and Software Production
Solicitation # N00025-26-R-5246
The U.S. Navy, through the Portfolio Acquisition Executive Mission Systems and PEO IWS 6.0, is soliciting proposals for the development, production, integration, testing, fielding, and lifecycle sustainment of the Electronic Chart Display and Information System (ECDIS) hardware and software. This effort supports navigation requirements for both surface and subsurface platforms, specifically focusing on the manufacture and assembly of AN/SYN-1 and Scalable Integrated Bridge System (S-IBS) hardware, alongside the maintenance and modification of software using Government Furnished Information. The anticipated contract structure consists of one base year and four one-year option periods beginning in FY27, with an award expected in Q4 FY27. The procurement will be awarded to the offeror representing the best value to the government based on a tradeoff process. Evaluation factors include technical approach, management approach, past performance, and total evaluated cost/price, with technical and management factors weighted more heavily than price. Mandatory requirements for offerors include Secret facility and personnel clearances and compliance with ANSI/ASQ/ISO9001:2015 quality standards. Proposals must be submitted electronically via the Procurement Integrated Enterprise Environment portal by January 13, 2027, and must include detailed pricing using a stepladder structure for hardware and level-of-effort tasks for software support.
Search, Detection, Navigation, Guidance, Aeronautical, and Nautical System and Instrument Manufacturing

POSTED

1 day ago

DEADLINE

in 3 months
View Details
NAICS: 336611
New
Federal
USS MAKIN ISLAND (LHD 8) FY28 Docking Selected Restricted Availability (DSRA) Request for Proposal(s)
Solicitation # N0002426R4421
The Naval Sea Systems Command (NAVSEA) is soliciting proposals for the USS MAKIN ISLAND (LHD 8) Fiscal Year 2028 Docking Selected Restricted Availability (DSRA). This Signature Availability is a comprehensive effort combining maintenance, modernization, and repair, requiring a contractor with substantial West Coast facilities, including a capable pier for the LHD ship class. The project is expected to begin in November 2027 and reach completion by October 30, 2029. Due to the complexity and magnitude of the requirements, the procurement is not set aside for small businesses. The government intends to make a single Firm Fixed-Price award in or before March 2027 based on a best-value trade-off source selection process. The scope of work encompasses extensive tasks including structural welding, cabling, piping, electrical and ventilation work, and overhauls of the propulsion and electric plants. Key deliverables include an integrated production schedule and participation in initial schedule model and work package execution reviews. Evaluation will prioritize non-price factors, specifically technical eligibility, physical resource capacity, manpower, and past performance, which are considered significantly more important than price. Proposals must be submitted via the PIEE Solicitation Module by November 9, 2026, divided into a Price Volume and a Technical Volume. The contract includes specific provisions for growth work, with estimated requirements of 211,989 direct labor hours and over 9.5 million dollars in materials, alongside a maximum incentive available of 15 million dollars.
Ship Building and Repairing

POSTED

5 days ago

DEADLINE

in 20 days
View Details
NAICS: 333415
Federal
Shipboard Air Conditioning Plant System Sustainment Plan (SSP)
Solicitation # N0002427R4452
Navsea HQ is conducting market research under solicitation N0002427R4452 to identify capable sources for the Shipboard Air Conditioning Plant System Sustainment Plan (SSP). This initiative aims to standardize and scale the sustainment of centrifugal, reciprocating, and rotary air conditioning plants for U.S. Navy surface ships worldwide. The government is evaluating various acquisition strategies, including a single-award Indefinite Delivery, Indefinite Quantity (IDIQ) contract or multiple-source arrangements, to improve materiel condition and operational availability across diverse ship classes and geographic locations. The contemplated scope of work encompasses six primary capability areas: executing Major AC Plant Pit Stops and overseeing Minor Pit Stops, both of which must be completed within a mandatory six-week window; providing embedded AC&R technical expertise at Shore Intermediate Maintenance Activities (SIMAs) for Sailor training and oversight; supplying OEM AC plant materiel and repair parts; managing a global warehouse and rotable pool for Overhaul Parts Packages (OPPs); providing configuration-specific engineering, technical data, and integrated product support; and delivering global unplanned and emergent field services. Interested respondents must submit a response by October 28, 2026, including a completed Capability Certification Matrix and supporting evidence of their ability to perform these requirements organically or through teaming arrangements.
Air-Conditioning and Warm Air Heating Equipment and Commercial and Industrial Refrigeration Equipment Manufacturing

POSTED

7 days ago

DEADLINE

in 8 days
View Details

Find Active Opportunities Like This

Get AI-powered intelligence on the opportunities still open

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 750+ contractors already using CLEATUS