Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, October 28 at 2:00 PM ET

Register Free →

This Solicitation opportunity from Department Of Commerce was posted on December 23, 2025. The submission period has ended. Browse the details below for market research, or find similar active opportunities.

Amendment 2-Solicitation - CUP - Two-Phase Design-Build Acquisition for Modernization and Expansion of Central Utility Plant

Closed
1333ND26RNB190001Federal

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

Active Opportunities Like This One

NAICS: 236220
New
Federal
REQUEST FOR INFORMATION (RFI) / MARKET RESEARCH NOTICE RELATED TO SEVERAL UPCOMING PROJECTS at WRIGHT-PATTERSON AFB, OHIO
Solicitation # W912QR26_RFI_CONSOLIDATEDPROJECTS_WPAFB
The U.S. Army Corps of Engineers, supporting the U.S. Air Force, is conducting market research via a Request for Information to identify qualified industry partners for seven construction and renovation projects at Wright-Patterson Air Force Base, Ohio. These projects range in scope from the renovation of sensitive Special Access Program spaces and the construction of a 90,000 square foot research laboratory to the modernization of compressor facility systems, the decentralization of heating plants, and the repair of military dormitories. The estimated acquisition magnitudes for these individual efforts vary significantly, with the largest project valued at approximately 160 million dollars. The government intends to utilize Other Transaction Agreements and a Progressive Design-Build delivery method, which splits the work into a collaborative design and pre-construction phase followed by a construction phase based on a Guaranteed Maximum Price. Interested firms must provide detailed company profiles, evidence of cybersecurity compliance through CMMC and SPRS, and experience with complex MEP infrastructure and secure facility standards. Responses are due by November 2, 2026, and should be submitted to the primary point of contact in PDF format.
W072 Endist Louisville

POSTED

about 2 hours ago

DEADLINE

in 12 days
NAICS: 236220
New
Construction of the Recharge Master Plan Update Basin Improvements Project Montclair Basin Improvements
Solicitation # construction-recharge-master-plan-update-basin-improvements-project-montclair-basin-improvements-2
The Construction of the Recharge Master Plan Update Basin Improvements Project Montclair Basin Improvements is a solicitation issued by RT Contractor Corp for the Inland Empire Utilities Agency. This project, located in California with a specific focus on the Riverside and Los Angeles project areas, is designated as a set-aside for Disadvantaged Business Enterprises (DBE) under the Department of Transportation. The solicitation was posted on October 21, 2026, with a response deadline of November 4, 2026. A critical component of this contract is strict adherence to six Good Faith Effort (GFE) requirements designed to secure project financing and expand upon State Water Resources Control Board standards. Bidders must provide proof of publicity, including online postings for 30 consecutive days and a one-day print newspaper advertisement, as well as evidence of utilizing the Small Business Administration and Minority Business Development Agency. These specific documents must be submitted with the bid package to avoid being deemed non-responsive. Additionally, documentation of DBE outreach may be submitted up to three business days after the bid closing date. Failure to comply with these GFE mandates will result in the disqualification of the proposal.
RT CONTRACTOR CORP

POSTED

about 8 hours ago

DEADLINE

in 13 days
NAICS: 236220
New
P084 NEXT GENERATION TORPEDO INTEGRATION LAB & P1016 Consolidated RDT&E Systems Facility – Newport, RI
Solicitation # p084-next-generation-torpedo-integration-lab-p1016-consolidated-rdte-systems-facility-newport-ri
J&J Contractors, Inc. is soliciting bids for the construction of the Next Generation Torpedo Integration Lab and the P1016 Consolidated RDT&E Systems Facility in Newport, Rhode Island. The project involves the creation of a 12,920 square foot multi-story steel frame laboratory and office facility featuring a shallow foundation, metal standing seam roof, and masonry and metal panel exterior walls. Additionally, Option 1 includes a separate 17,978 square foot laboratory facility with similar structural specifications and the demolition of Building 1272T, a 548 square meter engineering facility. The scope of work encompasses comprehensive site improvements, including landscaping, parking, exterior lighting, telecommunications, and underground stormwater retention systems. Pricing is requested across a wide range of trades, including demolition, abatement, concrete, masonry, structural steel, mechanical, electrical, plumbing, and fire protection. This is an SBA set-aside solicitation for small businesses and other designated disadvantaged business categories. All work must adhere to Davis Bacon Wage Rates and is exempt from sales tax. Interested parties must contact the primary point of contact to receive the formal bid invitation and documents via Building Connected before the response deadline of November 30, 2026.
J&J CONTRACTORS, INC.

POSTED

about 8 hours ago

DEADLINE

in about 1 month
NAICS: 236220
New
CITY OF GREENFIELD WASTEWATER TREATMENT PLANT UPGRADE PROJECT
Solicitation # city-greenfield-wastewater-treatment-plant-upgrade-project
The City of Greenfield Wastewater Treatment Plant Upgrade Project involves the construction of a new 2.0 million gallons per day wastewater treatment plant located at 41901 Walnut Avenue in Greenfield, California. The project scope is divided into four distinct phases: site preparation including soil stabilization and facility relocation; construction of the plant featuring a packaged Membrane Bioreactor, headworks, UV disinfection, SCADA systems, and various support buildings; decommissioning and demolition of existing facilities; and finish facilities including the Walnut Avenue extension and a second sludge handling unit. The total duration for the project is 915 calendar days, with a critical requirement to maintain existing plant services and regulatory compliance throughout the first two phases. Managed by C. Overaa & Co., the solicitation is open to various small and disadvantaged business enterprises, including DBE, SDVOSB, and WOSB. A significant local hiring goal requires that 50 percent of the total construction workforce be residents of Monterey, San Benito, or Santa Cruz counties. Subcontractors must utilize the Textura electronic invoicing system and agree to the Overaa standard agreement without modification. Bids are due by November 10, 2026, following a mandatory pre-bid meeting held on October 5, 2026. Performance and labor bonds for 100 percent of the subcontract price may be required, and all subcontractors must provide a waiver of subrogation endorsement for workers compensation insurance.
C. Overaa & Co.

POSTED

about 8 hours ago

DEADLINE

in 19 days

AI Contract Overview

Show more

The contract is a Two-Phase Design-Build Indefinite Delivery, Indefinite Quantity Single Award Task Order Contract (SATOC) issued by the Department of Commerce's National Institute of Standards and Technology (NIST) for the modernization and expansion of the Central Utility Plant (CUP) located on the NIST Gaithersburg, Maryland campus. The solicitation number is 1333ND26RNB190001, with a base ordering period of five years and option periods potentially extending the total contract duration up to 10 years and six months. The contract involves multiple task orders for design, construction, repair, and upgrades encompassing a broad scope of work related to mechanical, electrical, plumbing, utility infrastructure, structural components, fire suppression, life safety, communications, control, and security systems within the CUP complex. The work will be phased and closely coordinated with ongoing NIST operations, requiring detailed design submittals, quality assurance, safety plans, and adherence to a comprehensive set of technical specifications and regulatory standards, including codes from OSHA, NFPA, ASHRAE, ASTM, and various federal and state requirements. The procurement is conducted in two phases: Phase I, a Request for Qualifications (RFQ), includes a pass/fail evaluation for bonding capacity and assessment of offerors' design-build approach and technical qualifications, while Phase II, the Request for Proposals (RFP), evaluates the technical solution, project team, small business participation, project labor agreement compliance, and price. The Government uses a best value trade-off process that weighs technical and non-price factors more heavily than price. Key contract requirements include strict security processing for personnel due to the nature of the facility, designation and approval of key personnel, comprehensive quality control and inspection criteria, and compliance with organizational conflict of interest provisions. Deliverables include staged design documents, construction execution in compliance with detailed technical and safety guidelines, and coordinated inspection and acceptance by the Government. Proposal submission is electronic, with explicit format and content instructions, and all amendments and updates will be posted exclusively on SAM.gov. The contract also outlines detailed invoicing procedures favoring electronic submissions and identifies designated contracting officer’s representatives for technical oversight.

General Info

NIST awarded a 10.5-year design-build contract for CUP modernization with phased tasks, strict compliance.

NAICS

236220 - Commercial and Institutional Building Construction

Place of Performance

Gaithersburg, MD, USA

Set-Aside

NONE

Documents

18

1333ND26RNB190001 CUP Modernization Solicitation

PDF, High priority: read this first150 pages · ifb
High

Amendment 1 to Solicitation 1333ND26RNB190001 for CUP Modernization SATOC

PDF, High priority: read this first63 pages · amendment
High

Amendment 2 to Solicitation 1333ND26RNB190001

PDF, High priority: read this first2 pages · amendment
High

Attachment I NIST Building 302 Existing Compressed Air System

PDF, High priority: read this first1 page · sow
High

Certificate of Occupancy Binder Contents Template CFMO PR 2023.01

PDF, High priority: read this first9 pages · procedure-template
High

Guidelines for OFPM Contractors and A/E Firms at NIST

PDF, High priority: read this first25 pages · guidelines
High

Guidelines for OFPM Contractors and A/E Firms at NIST - Sep 9, 2025

PDF, High priority: read this first25 pages · guidelines
High

NIST Central Utility Plant Facility Program of Requirements Appendices June 2024

PDF, High priority: read this first633 pages · program-of-requirements
High

NIST Central Utility Plant Facility Program of Requirements June 2024

PDF, High priority: read this first352 pages · program-of-requirements
High

NIST CUP Modernization Design-Build Summary Section 011000

PDF, High priority: read this first24 pages · sow
High

NIST Design After Award Section 010120

PDF, High priority: read this first46 pages · sow
High

NIST Design After Award Section 010120

PDF, High priority: read this first46 pages · sow
High

NIST PR 2401.01 Facility Access and Electronic Access Control Directive

PDF, High priority: read this first19 pages · directive
High

NIST Schematic Design for Site Underground Utilities Replacement June 2024

PDF, High priority: read this first315 pages · sow
High

RFI Q&A for CUP Phase I Modernization Project

PDF, High priority: read this first7 pages · q-and-a
High

Schematic Design for Site Underground Utilities Replacement June 2024

PDF, High priority: read this first203 pages · schematic-design
High

1333ND26RNB0001 CUP Modernization Sign In Sheet

PDF, Low priorityother
Low

NIST Facility Access and Electronic Access Control Directive PR 24 01.01

PDF, Low priority19 pages · directive
Low

AI Contract Breakdown

Uniform Contract Format

Sign up to view the full breakdown with detailed analysis of each section.

Timeline

2 updates
PhaseClosed
Posted

Solicitation

Notice updated

Response deadline changed from Dec 30, 2025 to Jan 8, 2026. The notice title changed. The notice description changed.

Notice updated

Response deadline changed from Jan 8, 2026 to Jan 28, 2026. The notice title changed. The notice description changed.

Response Deadline

Deadline has passed

Submission Closed

Find active opportunities like this

Start your free trial to discover similar active contracts, track opportunities, and build proposals with AI assistance.

Organization & Contact Information

Show more
AgencyDepartment Of Commerce Nist
Contacts2 people available
OfficeGAITHERSBURG, MD, 20899, USA
Organization / AgencyDepartment Of Commerce Nist
Office AddressGAITHERSBURG, MD, 20899, USA
Contacts
Brandon Butler
Teresa Harris

Full Description

Show more

The purpose of this amendment (2) is to:


1. Extend the due date for Phase 1 RFQ to 1:00 PM ET on January 28, 2026. 


Please see the following attachment for amendment 2 for details.


1. 1333ND26RNB190001 Amendment 2


All other terms and conditions remain unchanged. 


************************************************************************


Amendment 1


The purpose of this amendment is to:


  1. Extend the due date for Phase I RFQ to 1:00 PM ET on January 8, 2026.
  2. Update previous Draft Solicitation Notice Language. See updated notice below the list of attachments.
  3. Provide answers to questions asked in response to this solicitation. See attached RFI Q&A -CUP Phase I.
  4. Revise the following solicitation sections: Section L, and Section M.
  5. Revise the following documents and attachments: IDIQ Statement of Work (SOW), Task Order Statement of Work (SOW), Attachment A, F1, and G.
  6. Incorporate new Attachment I.
  7. Incorporate Site Visit Sign-in Sheet pdf.

Please see the following attachments for details.


All changes are highlighted in yellow. 


Amendment 1 Attachments


1. 1333ND26RNB190001 Amendment 1 (includes revised IDIQ SOW, Task Order SOW, Section L, and Section M)


2. RFI Q&A - CUP Phase I


3. Site Visit Sign=in Sheet


4. Revised Technical Attachments A, F1, G


5. Attachment I (new)


************************************************************************


Original Solicitation Attachments


1. 1333ND26RNB190001 - CUP Modernization Solicitation (includes attachments for solicitation)


2. Statement of Work Technical Attachments A-H


*************************************************************************


NOTICE: This document is no longer a Draft Solicitation Notice solely to provide industry with advance awareness of the Government’s anticipated requirements. It is now a formal solicitation provided for Phase I of this Two-Phase Design-Build Indefinite Delivery, Indefinite Quantity Single Award Task Order Contract (SATOC).


Pursuant to this amendment, the Phase I submission deadline has been extended.


Any additional amendments or updates to the Phase I solicitation will be posted exclusively on SAM.gov. All changes will be clearly identified, with modified sections highlighted or otherwise marked to distinguish them from previous versions.


Industry is strongly encouraged to monitor SAM.gov regularly for any subsequent amendments.

More opportunities from Department Of Commerce Nist

Same awarding agency

NAICS: 236210
New
Federal
Building 215 Clean Room HEPA Filter Replacement
Solicitation # RFI-195000-26-00181
The National Institute of Standards and Technology is conducting market research through a Request for Information for the Building 215 Advanced Measurement Laboratory cleanroom repair and HEPA filter replacement project in Gaithersburg, Maryland. This initiative follows a previous solicitation that failed to produce an acceptable offer, prompting NIST to reassess its acquisition strategy and seek industry feedback on constructability, cost, and schedule feasibility. The project scope involves the modernization of an 1,800 square meter facility, including the replacement of approximately 1,200 HEPA filters, 70 VAV terminal units, and 54 airflow monitoring devices, as well as the installation of 32 exhaust air control valves and associated ductwork repairs, testing, and recertification. A critical component of the project is the proposed phasing plan, which aims to minimize research disruptions by utilizing 19 construction phases, including 18 critical cleanroom outage phases. Each critical outage is currently envisioned as a nine-day window starting Friday evening and requiring 24/7 operations to achieve ready-for-re-occupancy by the following Monday morning. NIST is specifically requesting rough-order-of-magnitude cost estimates and industry input on whether this aggressive outage schedule is realistic or if it creates prohibitive risks and costs. Responses, including company experience and recommendations for improving competition and project execution, are due by October 14, 2026.
Industrial Building Construction

POSTED

2 days ago

DEADLINE

in 12 days
View Details

Find Active Opportunities Like This

Get AI-powered intelligence on the opportunities still open

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 750+ contractors already using CLEATUS