Anniston Army Depot (ANAD) Power Generation and Microgrid Project in Anniston, Alabama

Closed
W912QR25R0021Federal

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

Active Opportunities Like This One

NAICS: 237130
New
SLED
115kV Transmission Line 1266 Rebuild Stanton North Substation to Dead-End Structure 79
Solicitation # 26-012
Nebraska Public Power District is soliciting sealed bids for Contract No. 26-012 to rebuild approximately 4.05 miles of the 115kV transmission line 1266, extending from the Stanton North substation to Dead-End Structure 79. The scope of work requires the contractor to provide all labor, supervision, equipment, and miscellaneous materials to replace all structures, conductors, shield wires, and hardware. Key technical deliverables include the installation of 28 wood H-Frame tangent structures and one tubular steel monopole dead-end on a drilled pier, upgrading the conductor to 954 kcmil 45/7 ASCR Rail, and installing 0.551 diameter fiber optic ground wire and EHS steel shield wire. The project also involves tree clearing, site preparation, and the removal of existing structures and conductors. Bids are due by 2:00 p.m. CST on December 2, 2026, and must be submitted as sealed hard copies to the Procurement Department in Columbus, Nebraska. The award will be based on the lowest cost and best bid, with evaluation factors including technical conformance, schedule capability, financial standing, and past performance history. Prospective bidders are encouraged to attend an optional pre-bid teleconference and site visit on November 23, 2026. Required submission documents include a signed proposal page, a completed price quotation table, a W-9 form, and bid security in the form of a certified check, irrevocable letter of credit, or bid bond. The successful contractor must provide a performance bond and maintain workers compensation and commercial general liability insurance.
Nebraska Public Power District

POSTED

about 14 hours ago

DEADLINE

in about 1 month
NAICS: 237130
New
SLED
Traffic Signal Synchronization Project Along Hamner Ave And Archibald Ave
Solicitation # 26-119CIP
The City of Eastvale, California, is soliciting bids for the Traffic Signal Synchronization Project Along Hamner Avenue and Archibald Avenue under solicitation number 26-119CIP. The project involves the installation of traffic signal controllers, field ethernet switches, fiber optic trunk and breakout cables, and conflict monitor units, as well as the implementation of hybrid detection systems. The scope includes significant infrastructure work such as installing PVC conduits, pull boxes, and performing pavement restoration. All work must be completed within 50 working days from the commencement date and must adhere to the standards of the County of Riverside, Caltrans, and the Americans with Disabilities Act. The contract will be awarded to the apparent low bidder based on the total bid price, including the base bid and specific alternates. To be eligible, the prime contractor must hold a current California Class A General Engineering Contractor license. Required submission documents include a signed bid form, bid security, a statement of qualifications, and a non-collusion declaration, all submitted via the PlanetBids portal. The selected contractor will be required to provide construction performance, labor and material payment, and warranty bonds. Payment will be administered on a lump sum basis according to an approved schedule of values, with final payment contingent upon the submission of project record drawings and the execution of a release of claims.
City of Eastvale

POSTED

2 days ago

DEADLINE

in 14 days
NAICS: 237130
New
Federal
CSSC Utility Feed Transformer Replacement
Solicitation # W912P627SSA001
The U.S. Army Corps of Engineers, Chicago District, is conducting market research via Sources Sought Notice W912P627SSA001 to identify qualified small business contractors for the turnkey removal and replacement of two utility feed transformers at the Chicago Sanitary and Ship Canal Fish Dispersal Barrier facility in Lockport, Illinois. The project involves the removal and disposal of two existing 4,000/5,000 kVA transformers and the installation, testing, and commissioning of two new operational replacements. The contractor will be responsible for all labor, materials, equipment, rigging, and supervision, while existing concrete pads, cabling, and switchgear will be reused. The estimated magnitude of construction is between 500,000 and 1,000,000 dollars, with an estimated project schedule of 365 calendar days. Interested firms must demonstrate technical capabilities in medium-voltage electrical work, including pre-energization electrical acceptance testing in accordance with NETA ATS and IEEE C57 standards. Key requirements include the ability to supply biobased dielectric insulating fluid and steel enclosures with recovered materials, as well as strict adherence to USACE EM 385-1-1 and NFPA 70E safety standards. Applicants must provide their small business status under NAICS code 237130, proof of bonding capacity, and up to three relevant project examples from the last five years. Responses, which should not include price quotes, are due by November 5, 2026, and must be submitted using the provided response template.
W072 Endist Chicago

POSTED

2 days ago

DEADLINE

in 7 days

AI Contract Overview

Show more

The contract involves the design and construction of a comprehensive microgrid system at the Anniston Army Depot (ANAD) in Alabama to enhance energy resiliency through an on-site automated energy control and storage management system. The microgrid will integrate new and existing energy assets, including 10MW of new natural gas generation, solar photovoltaic arrays, and medium voltage switchgear connected across multiple substations, enabling full islanding capability to maintain critical operations during grid outages for at least 14 days. The project expands on prior microgrid installations by linking assets at Nichols, Demil, and Eulaton substations, incorporating advanced controls, automated switching, and load shedding to prioritize mission-critical loads and sustain depot operations independent of the external utility grid. The system will comply with applicable cybersecurity criteria and distribution operator requirements, ensuring secure and resilient power delivery. This effort is a Design-Bid-Build construction contract estimated between $25 million and $100 million, set aside for Service-Disabled Veteran-Owned Small Businesses (SDVOSB). It will be awarded on a best value tradeoff basis, potentially without discussions, as per government discretion. Construction includes installing natural gas generators with protective enclosures, SCADA control systems, upgraded communication infrastructure, and necessary support facilities such as water lines and relocated storage sheds. The solicitation is expected to be released around February 2025 and will be electronically available via the SAM.gov portal. Contractors must maintain active SAM registration to be eligible, and the NAICS code for this procurement is 237130, which covers power and communication line construction. The project aims to significantly enhance energy independence and resilience for critical depot functions.

General Info

Design and construct a 10MW microgrid at ANAD with energy resiliency, cybersecurity, and SDVOSB set-aside.

NAICS

237130 - Power and Communication Line and Related Structures Construction

Place of Performance

KY

Set-Aside

NONE

Documents

3

Amendment 0006 to Solicitation W912QR25R0021

PDF, High priority: read this firstamendment
High

Installation Wide Microgrid and Backup Power Design P2#: 500463 - Special Provisions

PDF, High priority: read this firstamendment
High

Natural Gas Plan - Amdt 6 (500463)

PDF, High priority: read this firstspecifications
High

AI Contract Breakdown

Uniform Contract Format

Contract not broken down yet

CLEATUS splits the solicitation into Uniform Contract Format (UCF) sections: scope, pricing, deliverables, and evaluation criteria.

Timeline

2 updates
PhaseClosed
Posted

Presolicitation

Notice updated

The notice description changed.

Notice updated

The notice description changed.

Response Deadline

Deadline has passed

Type Changed

Presolicitation → Solicitation

Submission Closed

Find active opportunities like this

Get full access to discover similar active contracts, track opportunities, and build proposals with AI assistance.

Organization & Contact Information

Show more
AgencyDepartment Of Defense → W072 Endist Louisville
Contacts1 person available
OfficeLOUISVILLE, KY, 40202-2230, USA
Office AddressLOUISVILLE, KY, 40202-2230, USA

Full Description

Show more

*******************************THIS ACTION HAS BEEN CANCELLED.  PLEASE ANTICIPATE A NEW SOLICITATION W912QR26RA033 FOR THE 'ANNISTON ARMY DEPOT (ANAD) POWER GENERATION AND MICROGRID PROJECT' TO BE POSTED IN THE NEAR FUTURE.**************************


--------------------------------------**NOTICE OF CANCELLATION**-------------------------------------


Amendment 0006 Posted 22 July 2025. The proposal due date has been updated from 25 July 2025 to 08 August 2025. PLANS SHEETS and SPECIFICATION SECTIONS have been replaced in their entirety. The government does not anticipate any additional extensions to the proposal due date.


-----------------------------------------------AMENDMENT 0006--------------------------------------


Amendment 0005 Posted 16 July 2025. The proposal due date has been updated from 18 July 2025 to 25 July 2025. The PLANS SHEETS have been replaced in their entirety.


-----------------------------------------------AMENDMENT 0005--------------------------------------


Amendment 0004 Posted 17 June 2025. The use of Project Labor Agreements (PLA) for Federal Construction Projects are applicable to this acquisition. The proposal due date has been extended to 18 July 2025. The attendees roster from the Site Visit on 03 June 2025 has been posted.


-------------------------AMENDMENT 0004------------------------------


Amendment 0003 Posted 27 May 2025. The organized site visit has been rescheduled from 05 June 2025 at 8:30 a.m. Central Time to 03 June 2025 at 8:30 a.m. Central Time.


------------------AMENDMENT 0003-----------------------------


Amendment 0002 Posted 27 May 2025.


------------------AMENDMENT 0002------------------------------


Amendment 0001 Posted 15 May 2025.


------------------AMENDMENT 0001------------------------------


The intent of this solicitation is to select one contractor for the construction of a microgrid system at Anniston Army Depot (ANAD), Anniston, AL. The requirement will be competed as a Service-Disabled Veteran-Owned Small Business (SDVOSB) set-aside. The basis of award is the Best Value Trade-Off process. The Government will evaluate the proposals in accordance with the criteria described herein. The Contracting Officer will award a firm fixed price contract to the responsible Offeror whom the Source Selection Authority (SSA) determines conforms to the solicitation, is fair and reasonable, and offers the best overall value to the Government, all factors considered. The microgrid system at ANAD will have full islanding capability energy resiliency by providing an onsite, automated energy control / generation storage management system. The microgrid will integrate the new and existing generation assets with the Nichols, Demil, and Eulaton 46kV / 12.47kV substations to enable islanding for all critical loads. During a grid outage, the automated switching and microgrid controls will enable direct routing of electricity generated by the onsite assets to mission critical loads and loadshedding of large blocks of non-critical loads. The microgrid will be designed in accordance Unified Facility Criteria 4-010-06 Cybersecurity of Facility Related Control Systems, or policy current at time of design, as well as with emerging distribution system operator requirements. The target ceiling for contract award is $46,000,000.00. The Government may not be able to award a contract in excess of this ceiling. Offerors are under no obligation to approach this ceiling. A presolicitation notice for the Anniston Army Depot (ANAD) Power Generation and Microgrid Project, Anniston, AL contract opportunity was previously posted on SAM.gov (https://sam.gov/opp/1d501ac6857e46ecb768fd204f9eae16/view). All proposals shall be submitted according to Eastern Standard Time (EST).

More opportunities from Department Of Defense → W072 Endist Louisville

Same awarding agency

NAICS: 237110
New
Federal
Design-Bid-Build - Rough River Lake Axtel Wastewater Treatment Plant (WWTP)
Solicitation # W912QR27BA003
Solicitation W912QR27BA003 is a Design-Bid-Build project for the demolition and construction of the Axtel Wastewater Treatment Plant (WWTP) at Rough River Lake in McDaniels, Kentucky. The scope of work requires the contractor to remove the existing WWTP and fencing and install a new Aerobic Treatment Unit (ATU) and Drip Field System. This unrestricted procurement is estimated to have a construction magnitude between 1 million and 5 million dollars, with the award based on the lowest evaluated price. A 10 percent price evaluation preference will be applied to eligible HUBZone small business concerns. The contract is a Firm-Fixed-Price agreement under NAICS code 237110, with a total project duration of 400 calendar days from the Notice to Proceed. Performance is scheduled from December 18, 2026, to January 22, 2028, with a requirement to commence work within 10 calendar days of the notice. Key requirements include the submission of a Construction Quality Control (CQC) plan within 30 days of the notice to proceed, adherence to Davis-Bacon Act wage rates, and the provision of a Site Safety Health Officer. Liquidated damages for delays are set at 500 dollars per calendar day. Proposals must be submitted electronically via the PIEE Solicitation Module by the December 3, 2026, deadline.
Water and Sewer Line and Related Structures Construction

POSTED

2 days ago

DEADLINE

in about 1 month
View Details
NAICS: 237110
New
Federal
Request for Information/Market Intelligence Notice: Use of Progressive Design Build (PDB) with Other Transaction Authority (OTA) - Fort Hunter-Liggett Water System Improvements
Solicitation # W912QR-PDB-FHLWATER
The U.S. Army Corps of Engineers, Louisville District, is seeking market intelligence through a Request for Information for the restoration and modernization of potable water and wastewater collection systems at Fort Hunter Liggett. With an estimated acquisition magnitude of 70 to 80 million dollars, the project scope includes the design and construction of a new tank farm with at least 2 million gallons of storage, a new transmission main, upgrades to water supply wells, modernized SCADA infrastructure, and the rehabilitation of sanitary sewer lines and treatment plant lagoons. All work must adhere to NSPC, UFC, and NFPA criteria to address aging infrastructure and operational deficiencies. The government is evaluating a Progressive Design Build strategy utilizing an Other Transaction Agreement under 10 U.S.C. section 2808a. This proposed approach would involve a qualifications-based selection process consisting of a statement of qualifications and pitch meetings. The award would be structured in two phases: an initial design and pre-construction phase followed by a construction phase based on an agreed-upon Guaranteed Maximum Price. Interested parties under NAICS code 237110 must submit their company profiles, collaborative delivery experience, and technical feedback via the designated online survey form by November 3, 2026.
Water and Sewer Line and Related Structures Construction

POSTED

3 days ago

DEADLINE

in 5 days
View Details

Earlier notices in this NAICS code

Posted before this notice, open and closed

Find Active Opportunities Like This

Get AI-powered intelligence on the opportunities still open

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 750+ contractors already using CLEATUS