Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, September 2 at 2:00 PM EDT

Register Free →

APPROVAL OF KUBO GROUP (KUBO)’S EXCEPTIONAL METHD FOR ANALYZING THE DESIGN OF A HEATED GREENHOUSE IN SANTA MARIA, CALIFORNIA

Active
State & Local

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

AI Contract Overview

Show more

The California Energy Commission has approved an Exceptional Method submitted by KUBO for a conditioned greenhouse project located in Santa Maria, California. This approval allows the use of a specialized analysis method because the project design could not be adequately modeled using standard public domain computer programs required by the 2025 Energy Code. Following a public comment period and a technical review by CEC staff, it was determined that KUBO's method accurately demonstrates compliance with mandatory requirements for nonopaque envelopes. The analysis confirmed that the design actually results in a modest reduction of the energy budget compared to standard requirements. The formal approval was finalized during the CEC Business Meeting on August 17, 2026.

General Info

CEC approved KUBO's specialized energy analysis method for a Santa Maria greenhouse project.

Agency

California → Energy Commission

NAICS

541715 - Research and Development in the Physical, Engineering, and Life Sciences (except Nanotechnology and Biotechnology)View NAICS

Place of Performance

Santa Maria, CA, 93458

Set-Aside

NONE

Documents

(1)

260827-CEQA-NOE-KUBO

PDF

AI Contract Breakdown

Uniform Contract Format

What is UCF?

Uniform Contract Format (UCF) uses AI to break down any contract into standardized sections—scope, pricing, deliverables, and evaluation criteria.

Timeline

Posted

forecast

Ready to pursue this opportunity?

Start your free trial to track this contract, build proposals with AI assistance, and manage your pipeline.

Organization & Contact Information

Show more
AgencyCalifornia → Energy Commission
Contacts1 person available
OfficeN/A
Organization / Agency
California → Energy Commission
Office AddressN/A
Contacts
Gypsy AchongBuilding Standards Branch Manager

Full Description

Show more
The California Energy Commission (CEC) adopts and regularly updates regulations for new construction, additions, and alterations to residential and nonresidential buildings, which are contained in California Code of Regulations, Parts 1 and 6 (the California Energy Code). These regulations go through an extensive public process and are adopted at a CEC business meeting before going into effect. Part 1 of the Energy Code includes administrative regulations for implementation. In certain circumstances, interested parties or the CEC may identify Exceptional Methods that meet the minimum requirements of the Energy Code, but that require additional regulatory action to ensure compliance and consistency with the Energy Code. In these situations, section 10-109(e) of the 2025 Energy Code states that, “The Commission may approve an exceptional method that analyzes a design, material, or device that cannot be adequately modeled using the public domain computer programs. Applications for approval of exceptional methods shall include all information needed to verify the method's accuracy.” On June 24, 2026, KUBO submitted an application for CEC approval of KUBO’s Exceptional Method for the specified project design that demonstrates compliance with mandatory requirements for nonopaque envelopes in conditioned greenhouses as provided by the 2025 Energy Code. The application included documentation that analyzed the performance of a conditioned greenhouse project in Santa Maria, demonstrating that the design meets or exceeds the equivalent requirements of Section 120.6(h). The application was available for public comment through July 24, 2026. No comments were received. CEC staff reviewed the application submitted on June 24, 2026, including supporting analysis, and all written comments submitted. CEC staff’s analysis confirmed that: 1. KUBO’s conditioned greenhouse design for the specified project in Santa Maria, CA cannot be adequately modeled by any of the public domain computer programs used to demonstrate compliance with the 2025 Energy Code, 2. The proposed Exceptional Method adequately models the performance of KUBO’s design for the specified conditioned greenhouse in Santa Maria, California,, and 3. The proposed Exceptional Method for analyzing KUBO’s design, as applied to the Santa Maria project described in the application, accurately demonstrates a modest reduction of the energy budget compared to the mandatory requirements for nonopaque envelopes in conditioned greenhouses in the 2025 Energy Code. CEC staff and the Executive Director recommended that the CEC approve KUBO’s proposed Exceptional Method that analyzes the design of a conditioned greenhouse project in Santa Maria, California, consistent with Section 10-109(e). KUBO’s Exceptional Method was approved at the CEC’s August 17, 2026 Business Meeting.

Similar Contracts

Same NAICS industry code

NAICS: 541715
New
Federal
Synthetic Training Environment (STE) Virtual Software (VSW)
Solicitation # STE-VSW-26-0006
The Army Contracting Command Aberdeen Proving Grounds Orlando Division, on behalf of the Capability Program Executive Simulation, Training, Test and Threat, is issuing a Call for Solutions for the Synthetic Training Environment Virtual Software project. This initiative seeks a modernized virtual software ecosystem to achieve four primary operational outcomes: a doctrinal gate to live fire via certifiable Table II training, a true combined arms environment integrating direct and indirect fires, full mission command concurrency, and an open system architecture with published SDKs and APIs. The total combined value of all awarded lots is approximately 250 million dollars. The scope is divided into five capability lots: a foundational software platform, specialized applications, hardware-in-the-loop integration and test, a training management and after-action review data layer, and independent enterprise integration support. The acquisition process follows a phased selection based on technical merit, schedule achievability, and relevant experience within the last three years. Technical evaluations prioritize the speed to initial operating capability and the use of modular, service-oriented architectures. A blind assessment is conducted for technical concepts to ensure impartiality, and a head-to-head demonstration is used to select the winner for the foundational software platform based on performance, stability, and latency. The timeline includes a final call for solutions posting on September 10, 2026, with solutions due by September 21, 2026, and anticipated awards for the various lots by November 6, 2026. To maintain objectivity, a strict organizational conflict of interest firewall is established for the enterprise integration support vendor, prohibiting them from participating in the other software-related lots.
W6QK Acc-Apg-Orlando

POSTED

1 day ago

DEADLINE

in 23 days
View Details
NAICS: 541715
New
Federal
Army Advanced Manufacturing (AdvM) Commercial Solutions Opening (CSO)
Solicitation # W9124P26SC001
The Army Advanced Manufacturing (AdvM) Commercial Solutions Opening (CSO), identified by solicitation number W9124P26SC001, is an ongoing, open solicitation managed by the Army Contracting Command – Redstone Arsenal to identify and acquire innovative commercial technologies that enhance manufacturing, maintenance, and sustainment capabilities across the Army’s Organic Industrial Base and at the tactical edge. This initiative leverages flexible acquisition authorities including 10 U.S.C. § 3458, § 4022, DFARS RFO 212.70, and the Employee Stock Ownership Pilot Program to support rapid prototyping and fielding of advanced manufacturing solutions in areas such as additive manufacturing, digital twins, Industrial Internet of Things, cybersecurity integration, and process qualification. Proposals are submitted through a two-phase process: Phase 1 requires a one-page Quad Chart and a five-page White Paper formatted in 12-point Times New Roman, single-spaced, with one-inch margins, submitted via email to the designated mailbox. While the CSO remains continuously open, specific Calls for Solutions will have defined deadlines, and only commercially available solutions meeting the defined Areas of Interest are considered. The Government retains the right to issue amendments, which will be highlighted in yellow for transparency, and does not guarantee that any Request for Information will lead to a follow-on opportunity. Award decisions are based on a best-value trade-off process, evaluating technical merit and relevance first, followed by innovation and uniqueness, company viability—including corporate experience, personnel qualifications, and data rights identification—and price and affordability. Non-cost factors collectively carry significantly more weight than cost, making this a non-LPTA process. All awards will be made as Firm-Fixed-Price contracts under DFARS RFO 212.7002(b), with potential award instruments including IDIQ contracts, Other Transaction Agreements, or direct purchase orders. Offerors must be registered in SAM.gov and hold an active Unique Entity ID, but no socioeconomic set-asides or size status certifications are mandated. Submission costs are not reimbursable, and proposals must comply with DFARS data rights clauses, particularly regarding intellectual property and technical data disclosure. Performance will be centered at Redstone Arsenal, Alabama, with operational delivery targeted to the OIB and tactical locations. No packaging, marking, or inspection standards are specified beyond the requirement that proposed solutions must demonstrate validated prototypes, qualified manufacturing processes, or commercialized technologies aligned with Army modernization priorities. The Government conducts all evaluation
W6QK Acc-Rsa

POSTED

1 day ago

DEADLINE

N/A
View Details
NAICS: 541715
New
Federal
ACC-DTA Ground Maneuver Commercial Solutions Opening (CSO)
Solicitation # W912CH-26-S-0001
The ACC-DTA Ground Maneuver Commercial Solutions Opening (CSO), identified by solicitation number W912CH-26-S-0001, is a streamlined acquisition authority authorized under DFARS Subpart 212-70, designed to rapidly procures innovative commercial technologies to enhance ground vehicle systems and support Army modernization priorities. This CSO enables the Department of the Army to award fixed-price contracts, including fixed-price incentive fee arrangements, primarily under FAR Part 12 for commercial items or through alternative authorities such as 10 U.S.C. 4022 and 31 U.S.C. 6305 for cooperative agreements or transactional agreements. The initiative targets commercially available technologies—whether already on the market or emerging from commercial or strategic investment—that can be rapidly integrated into Army operations through concept demonstrations, pilot projects, agile development, or incremental enhancements. The solicitation remains open until January 9, 2029, with the government retaining the right to extend it and to add new Areas of Interest (AoIs) at any time throughout its duration, each potentially having its own submission deadline. Proposals must be submitted directly via email to designated points of contact and are evaluated in two phases: a solution brief phase and a presentation phase. Pass/fail gates require offerors to possess a valid Unique Entity ID (UEI), be registered in the System for Award Management (SAM), and enroll in the Wide Area Work Flow invoicing system; failure to meet any of these renders a proposal ineligible. Evaluation criteria focus on responsiveness to the AoI, technical merit, innovation, affordability, IP restrictions, and the reasonableness of proposed timing and cost estimates. All submissions must be unclassified and may not be marked confidential; any Controlled Unclassified Information (CUI) must be handled in compliance with 32 CFR Part 2002. Offerors must also comply with the Procurement Integrity Act, be free from suspension or debarment, and for certain AoIs like the TIGER Hackathon, must affirm adherence to the Trade Agreements Act and Buy American Act while explicitly denying reliance on adversarial foreign nations for critical components. Technical proposals must include detailed workflows, staffing plans, deliverables with timelines, and full technical disclosures, while price proposals must provide labor categories, hours, rates, and material costs sufficient for government analysis. Contract awards will be contingent on favorable evaluation and available funding, with no pre-determined contract ceiling specified.
W6QK Acc- Dta

POSTED

1 day ago

DEADLINE

in over 2 years
View Details
NAICS: 541715
New
Federal
QBI Topic Independent Verification and Validation (IV&V)
Solicitation # DARPA-PA-26-02-01
The Defense Advanced Research Projects Agency (DARPA) is soliciting proposals under the Quantum Benchmarking Initiative (QBI) through a specific topic called QBIT, focused on providing Independent Verification and Validation (IV&V) support. This solicitation, identified as DARPA-PA-26-02-01, invites entities with innovative infrastructure, equipment, and expertise to assist DARPA’s QBI program, which aims to rigorously evaluate emerging quantum computing technologies for industrial relevance and accelerated advancement. The effort involves spanning the entire quantum computing stack—from use-case definition and systems engineering to prototype testing and validation—emphasizing fault-tolerant systems and the establishment of credible, reproducible performance assessments. Proposals are first required to submit a five-page abstract following detailed formatting and content guidelines, emphasizing technical expertise, facilities, personnel qualifications, budget, and references, with abstracts due by September 1, 2026. Selected abstract submitters will be invited to submit full proposals by October 15, 2026. Awards will be made through Other Transaction (OT) agreements for research, enabling flexibility outside traditional FAR contract clauses. The evaluation criteria prioritize technical feasibility and execution, scientific validation, and budget realism, using a trade-off approach allowing technical merit to justify costs. Proposers must demonstrate compliance with Controlled Unclassified Information (CUI) handling per DoD Instruction 5200.48 and NIST SP 800-171 standards and are expected to deliver outcomes and data with unlimited rights. Special considerations include managing organizational conflicts of interest, publication restrictions requiring DARPA approval, and export control compliance, with performance anticipated primarily at proposer facilities with advanced quantum test environments. This initiative is designed to enhance the QBI program’s testing and evaluation capacity by engaging diverse organizations capable of delivering independent, rigorous verification essential for advancing quantum computing technologies at pace with DARPA’s high-risk, high-reward research mission.
Defense Advanced Research Projects Agcy

POSTED

1 day ago

DEADLINE

in 4 months
View Details