Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, December 9 at 2:00 PM ET

Register Free →

Arundell Barranca Detention Basin Cleanout

Forecast
2025100009955State & Local

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

AI Contract Overview

Show more

The Ventura County Watershed Protection District is seeking to perform a cleanout of the 5.9-acre Arundell Barranca Detention Basin in Ventura, California. The project involves the removal of approximately 70,000 cubic yards of accumulated sediment and debris, much of which was captured during the 2023 and 2024 storm seasons. Work is scheduled to take place between September and December 2025, with an anticipated duration of 65 working days. Access to the site will be provided via Sexton Canyon Road and County-owned Right-of-Way, and all excavated debris must be disposed of at a site approved by the County of Ventura Integrated Waste Management Division. The operation requires a variety of heavy equipment, including wheel loaders, bulldozers, excavators, dump trucks, water trucks, and street sweepers. To ensure environmental compliance, the project will adhere to the May 2008 Final Program Environmental Impact Report and specific Best Management Practices for water diversion. Biological surveys will be conducted before and during the project to protect sensitive resources, and the removal of mature trees is strictly prohibited. The project is categorized as exempt under Class 1 Existing Facilities as it constitutes routine maintenance without expansion. Administrative oversight is led by Jeff Palmer, Assistant Director of the Watershed Protection District.

General Info

Clean out 70,000 cubic yards of sediment from Arundell Barranca Basin, Sep–Dec 2025, per environmental protections.

Agency

California → Ventura County Watershed Protection District

Place of Performance

Sexton Canyon Road and Lake Canyon Road, Ventura, CA

Set-Aside

NONE

Documents

0

No documents available

Documents will appear here when they are available.

AI Contract Breakdown

Uniform Contract Format

Sign up to view the full breakdown with detailed analysis of each section.

Timeline

PhaseForecast
Posted

forecast

Prepare for this forecast

Research the agency, track this forecast, and prepare your capture plan before the solicitation opens.

Organization & Contact Information

Show more
AgencyCalifornia → Ventura County Watershed Protection District
Contacts1 person available
OfficeN/A
Organization / Agency
California → Ventura County Watershed Protection District
Office AddressN/A

Full Description

Show more
Watershed Protection is proposing to remove 70,000 cubic yards of accumulated sediment and debris in the existing 5.9-acre Arundell Barranca Detention Basin. Sediment and debris removed last occurred in 2017. Much of the sediment was captured during the 2023 and 2024 storm seasons. Access to the work area will be from Sexton Canyon Road and County-owned Right-of-Way. Work is scheduled between September and December 2025 after bird nesting season. Nonetheless, biological surveys will be performed prior to and periodically during work to identify and avoid sensitive biological resources. No mature trees will be removed during work. A final Program Environmental Impact Report (EIR) on Environmental Protection Measures for the Ongoing Routine Operations and Maintenance Program was prepared in May 2008 (SCH No. 2002091107). All applicable Best Management Practices described in the EIR and subsequent regulatory permits will be used for the proposed project. Debris excavated from this existing facility will be disposed of at a site approved by the County of Ventura Integrated Waste Management Division.

Similar Contracts

Same NAICS industry code

NAICS: 237990
New
International
RFI-TOM-LOG26_01_Mise en place de répertoire de prestataires en BTP dans la Région de Tombouctou Cheick Abdoul Kader THERA - [email hidden]
Solicitation # RFI-TOM-LOG26_01
The International Organization for Migration (IOM) has issued Request for Information RFI-TOM-LOG26_01 to establish a directory of qualified Building and Public Works (BTP) service providers in the Tombouctou and Taoudenit regions of Mali. This prequalification process aims to identify capable suppliers for future competitive bidding across three primary categories: building construction and rehabilitation, drinking water supply system construction and rehabilitation, and the construction and rehabilitation of roads and annexed works such as bridges and culverts. As this is a pre-solicitation phase, pricing is not requested at this stage. Eligible bidders must be physically present in Tombouctou with their own facilities and must not be on the United Nations ineligibility list. Technical requirements include a minimum of five years of continuous activity in the BTP sector and the completion of at least two similar projects in Mali between October 2020 and October 2026. Financial capacity is evaluated based on cumulative revenue for 2023 through 2025, with providers categorized into three tiers based on thresholds of 60 million and 200 million XOF. Required documentation includes commercial registration, taxpayer cards, CNPS registration, and certified financial statements. Submissions must be delivered to the IOM Sub-Office in Tombouctou by November 24, 2026.
IOM

POSTED

about 20 hours ago

DEADLINE

N/A
View Details
NAICS: 237990
New
SLED
Tri Village Park Pier Construction (Choctaw Beach Fishing Pier)
Solicitation # 27-01
Walton County is soliciting bids for the construction of the Tri Village Park Pier, also known as the Choctaw Beach Fishing Pier, as part of a redevelopment project of a former fire station site on Choctawhatchee Bay. The scope of work requires the contractor to provide all labor, materials, and equipment to construct an ADA-accessible fishing pier and kayak launch in strict accordance with the April 29, 2026, construction plans. Other park improvements, such as parking, grading, and demolition, are excluded from this solicitation as they will be handled by County forces. The project must begin within ten business days of the Notice to Proceed, with substantial completion required within 120 calendar days and final completion within 30 days of the issuance of a punch list. The contract will be awarded to the responsible and responsive bidder who submits the lowest lump sum bid, with preference given to businesses maintaining a drug-free workplace program in the event of a tie. Bidders must submit their proposals via the e-Procurement Portal by December 10, 2026, and must include a notarized bid form, a declaration of subcontractors and suppliers, and a completed public entity crimes statement. The successful contractor is required to provide performance and payment bonds equal to the contract price and must adhere to Florida Prompt Payment Act standards and FDOT specifications for layout. The contractor maintains sole responsibility for construction methods, employee safety, and the protection of property throughout the project duration.
Engineering

POSTED

about 23 hours ago

DEADLINE

in 29 days
View Details

Earlier notices in this NAICS code

Posted before this notice, open and closed

Prepare for this forecast

Research this forecast and prepare for the solicitation

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 750+ contractors already using CLEATUS