Asphalt & Concrete Paving Restoration

Active
State & Local

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

AI Contract Overview

Show more

This subcontract for Asphalt and Concrete Paving Restoration involves the removal and replacement of surfaces for prime contractors working on civil infrastructure projects for the City of Peachtree City in Georgia. The scope of work covers 825 linear feet of the project area, requiring the restoration of asphalt cart paths and concrete surfaces, as well as the restriping of crosswalks. The project requires the use of specialized machinery, including asphalt pavers, rollers, and striping equipment, to deliver fully restored surfaces. Interested parties should note that the response deadline for this opportunity is November 17, 2026.

General Info

Asphalt and concrete paving restoration for Peachtree City, Georgia, due November 17, 2026.

Documents

This scope was carved out of 27-103BSW.

The full solicitation package (1 document), including the RFP, is on the prime solicitation, not on this scope.

View the prime solicitation

Tuxedo Lane Drainage Improvement Project

AI Contract Breakdown

Uniform Contract Format

No documents to break down

The breakdown needs solicitation documents. None were found from this contract's source.

Timeline

Posted

subcontract

Response Deadline

Submission deadline

Response Deadline

Ready to pursue this opportunity?

Start your free trial to track this contract, build proposals with AI assistance, and manage your pipeline.

Organization & Contact Information

Show more
AgencyGeorgia → City of Peachtree City
ContactsNo contacts available
OfficeN/A
Office AddressN/A
ContactsNo contact information available

Full Description

Show more
Performs removal and replacement of asphalt and concrete surfaces for prime contractors on City of Peachtree City civil infrastructure projects. Replaces concrete and asphalt along 825 LF of project area and performs restriping of crosswalks. Utilizes asphalt pavers, rollers, and striping equipment. Delivers restored asphalt cart paths and concrete surfaces with new striping.

Similar Contracts

Same NAICS industry code

NAICS: 237310
New
SLED
Water, Street & Drainage Improvements - W Phillipsburg Phase 2
Solicitation # PE-77648-NONST-2027-000000031
The Tift County Board of Commissioners is soliciting competitive cost sealed bids for the Water, Street and Drainage Improvements project for the West Phillipsburg Community Phase 2 in Georgia. The scope of work includes the construction of approximately 3,600 linear feet of twenty-foot-wide urban roadway featuring curb, gutter, base, and asphalt, along with the installation of storm drainage pipes and boxes. Additionally, the project requires the replacement of approximately 1,230 linear feet of 2-inch PVC water main, including the transfer of existing water services and the installation of fire hydrants. The project will be awarded as a single contract, with a timeline of 180 consecutive calendar days to reach substantial completion and 194 consecutive calendar days for final contract close-out. To be eligible, bidders must be pre-qualified Georgia Department of Transportation Contractors, and all watermain construction must be performed by a Licensed Utility Contractor. Mandatory submission requirements include a Bidder's Affidavit of Compliance with O.C.G.A section 13-10-91 regarding E-Verify, a bid bond or certified cashier's check for at least ten percent of the bid amount, and the contractor's license number clearly displayed on the bid envelope. The successful bidder must provide performance and payment bonds for one hundred percent of the contract amount from a Georgia-licensed surety company. Bids are due by 11:00 AM on November 17, 2026, to the Tift County Board of Commissioners in Tifton, Georgia.
Tift County Board of Commissioners

POSTED

about 11 hours ago

DEADLINE

in about 1 month
View Details
NAICS: 237310
New
Joliet Job Corps-Request for Quote Parking Lot and Road Repairs
Solicitation # joliet-job-corps-request-quote-parking-lot-road-repairs
Management & Training Corporation (MTC), operating the Joliet Job Corps Center for the U.S. Department of Labor, is seeking bids for a fixed-price, single lump sum subcontract for road and parking lot repairs in Illinois. The project scope includes the full-depth removal and replacement of approximately 62,500 square feet of asphalt pavement across five specific areas, the repair of five storm sewer drain structures, and the patching of five potholes. All work must be completed within 90 consecutive business days following a written Notice to Proceed, with all removed materials disposed of at an approved offsite facility. The estimated contract value ranges from $100,000 to $250,000. Bids are due by October 21, 2026, and will be awarded based on overall best value. Mandatory submission requirements include a physical site visit, a signed attendance roster, the MTC Bid for Lump Sum Contract form, a completed MTC Supplier Packet, and a detailed cost breakout on company letterhead. Because the project exceeds $25,000, bidders must provide a bid bond guarantee equal to 20% of the base bid, and the awarded contractor must provide performance and payment bonds from a surety company with at least an A- rating. The project is subject to Construction Wage Rate Requirements, necessitating compliance with prevailing wages and the submission of certified payroll reports. Payment is based on percentage of completion using AIA G702 and G703 forms, with a 10% retainage held until substantial completion.
Joliet Job Corps

POSTED

about 11 hours ago

DEADLINE

in 5 days
View Details
NAICS: 237310
New
SLED
RFP27-001 Cochran Mill Park Bridge Repair/Replacement
Solicitation # 27-001
The City of Chattahoochee Hills, Georgia, is soliciting sealed bids under RFP 27-001 for the repair and potential replacement of the Cochran Mill Park Trail Bridge located at 6875 Cochran Mill Road. The project scope involves a four-phase process including mobilization, demolition, steel preparation and coating, reconstruction of railings, and final cleanup. Key deliverables include the implementation of environmental containment measures using plastic sheeting to capture debris and the provision of a detailed work plan with specific cure times for primers and finish coats. The contract will be awarded to the highest scoring offeror based on a points system evaluating cost and pricing, technical qualifications and past experience, and the proposed project approach and schedule. Proposals must be submitted by 1:00 PM EST on November 19, 2026, and must include one original and two copies delivered to the Finance Department. Required documentation includes a signed cover sheet, a detailed line-item price breakdown, a disclosure form regarding campaign contributions and family relations, and resumes for all key personnel. The successful contractor must maintain primary insurance coverage and comply with various federal and state non-discrimination laws. The initial contract term is defined as the Notice to Proceed plus six months, and the City retains the right to cancel the contract based on poor performance assessments or through specific termination clauses for cause or convenience.
City of Chattahoochee Hills

POSTED

about 12 hours ago

DEADLINE

in about 1 month
View Details

More opportunities from Georgia → City of Peachtree City

Same awarding agency

NAICS: 237110
New
SLED
Tuxedo Lane Drainage Improvement Project
Solicitation # 27-103BSW
The Tuxedo Lane and Smokerise Trace Drainage Improvement Project, solicitation number 27-103BSW, is a construction contract issued by the City of Peachtree City, Georgia. The scope of work involves the removal of select components of an existing 30-inch diameter corrugated metal pipe stormwater system and the installation of a new system featuring 825 linear feet of 30-inch diameter reinforced concrete pipe, one drop inlet, and five junction boxes. Additional requirements include the removal and replacement of an asphalt cart path, trench patching, modification of existing structures, and the restriping of crosswalks. The project also encompasses site clearing, grubbing, and the protection of existing vegetation and fences within the construction area. The contract is awarded to a responsive bidder based on unit price bids, with a specific allowance of 20,000 dollars for owner-directed changes. Bidders must provide a construction contractor's qualification statement, a non-collusion affidavit, a security and immigration compliance affidavit, and a drug-free workplace certification. Awarded contractors are required to provide a performance bond for 100 percent of the project cost and a payment bond for 110 percent. Compliance with Georgia Code 34-4-3 regarding prevailing wages is mandatory. Project administration is managed by the Peachtree City Project Manager, who oversees quality control, inspections, and the review of monthly applications for payment.
Water and Sewer Line and Related Structures Construction

POSTED

1 day ago

DEADLINE

in about 1 month
View Details

Ready to Pursue This Opportunity?

Get AI-powered intelligence on this solicitation and the ones like it

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 750+ contractors already using CLEATUS