Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, October 14 at 2:00 PM ET

Register Free →

Asphalt Concrete Grinding and Overlay

Active
State & Local

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

General Info

Place of Performance

Fresno, CA, 93721, USA

Set-Aside

NONE

Documents

This scope was carved out of 12700699.

The full solicitation package (3 documents), including the RFP, is on the prime solicitation, not on this scope.

View the prime solicitation

City Of Fresno Pave More Now – Bid Package B-3

AI Contract Breakdown

Uniform Contract Format

No documents to break down

The breakdown needs solicitation documents. None were found from this contract's source.

Timeline

Posted

subcontract

Response Deadline

Submission deadline

Response Deadline

Ready to pursue this opportunity?

Start your free trial to track this contract, build proposals with AI assistance, and manage your pipeline.

Organization & Contact Information

Show more
AgencyCalifornia → City of Fresno
ContactsNo contacts available
OfficeN/A
Organization / AgencyCalifornia → City of Fresno
Office AddressN/A
ContactsNo contact information available

Full Description

Show more
Performs asphalt concrete grinding and installation of Hot Mix Asphalt (HMA) overlay for prime contractors on City of Fresno pavement rehabilitation projects. Grinds asphalt to a minimum depth of 0.20’, installs HMA overlay to a minimum depth of 0.25’, and performs full-depth reconstruction of failed pavement sections. Requires asphalt milling machines and paving equipment. Delivers a finished, graded asphalt pavement surface.

Similar Contracts

Same NAICS industry code

NAICS: 237310
New
Joliet Job Corps-Request for Quote Parking Lot and Road Repairs
Solicitation # joliet-job-corps-request-quote-parking-lot-road-repairs
Management & Training Corporation is seeking bids for a subcontracting opportunity to perform road and parking lot repairs at the Joliet Job Corps Center in Illinois. This fixed-price, single lump sum contract has an estimated value between $100,000 and $250,000. The scope of work includes the replacement of 62,500 square feet of asphalt across five key areas, including the guard shack, dorm parking lot, west side of dorms, kitchen/BCT, and dumpster/maintenance areas. Additionally, the contractor must repair five storm sewer drain structures and patch five potholes. All work must be completed within 90 consecutive business days following a written Notice to Proceed, with liquidated damages of $1,000 per day for incomplete or unsatisfactory work. Bids are due by October 21, 2026, at 3:00 PM CT and will be awarded based on overall best value. Mandatory requirements for a responsive bid include a physical site visit, a detailed cost breakout on company letterhead, and the submission of the MTC Bid for Lump Sum Contract form and Supplier Packet. For bids exceeding $25,000, a bid bond guarantee of 20% is required, and the awarded contractor must provide performance and payment bonds from a surety company with at least an A- rating. The project is subject to Construction Wage Rate Requirements, necessitating compliance with prevailing wages and the submission of certified payroll reports. Final payment is contingent upon a successful final inspection and the submission of a Notice of Final Completion, a Certificate of Release of Liens, and other closing documentation.
Joliet Job Corps

POSTED

about 5 hours ago

DEADLINE

in 9 days
View Details
NAICS: 237310
New
SLED
2027 Roadway Maintenance
Solicitation # 4630006
Hennepin County is soliciting bids for the 2027 Roadway Maintenance project, identified as solicitation number 4630006. The scope of work involves bituminous mill and overlay, signing, and striping for sections of County Road 116 and 159 within the cities of Corcoran, Medina, and Rogers. All work must adhere to the 2025 MnDOT Standard Specifications for Construction and project-specific plans. Notably, work on County Road 116 cannot commence before May 30, 2027, to accommodate separate ADA pedestrian access ramp updates. Bids must be submitted electronically via the ProcureWare portal by 2:00 p.m. on November 3, 2026. Required documentation includes the Proposal Form, Non-Collusion Declaration, and Responsible Contractor Verification and Certification of Compliance. A bid bond equal to 5 percent of the bid total is required. The successful bidder must provide payment and performance bonds equal to the full contract amount within seven calendar days of the Notice of Intent to Award. The project mandates compliance with Minnesota prevailing wage statutes and requires the submission of a Utilization Plan for Small Business Enterprise participation. Contractors are responsible for strict quality control and safety measures, including the use of ANSI Class 2 or 3 high-visibility apparel. Environmental compliance is emphasized through detailed requirements for soil and sediment sampling, as well as adherence to MPCA guidance for petroleum remediation, asbestos, and stormwater sediment management. Final inspection and acceptance will be conducted by Hennepin County.
Hennepin County

POSTED

3 days ago

DEADLINE

in 22 days
View Details
NAICS: 237310
New
International
Salmo Parks New Sidewalk Project
Solicitation # 234859
The Village of Salmo in British Columbia is soliciting proposals for the Salmo Parks New Sidewalk Project to improve accessibility for children with mobility challenges. The project involves the installation of new sidewalks at two locations: KP Park at 215 Sayward Avenue and Lion's Park at 1017 Glendale Avenue. At KP Park, the contractor will extend the existing sidewalk from the washroom building to a circular concrete racetrack and a new Activity Board playground feature, covering approximately 350 square meters with a width of 6 feet at the front of the washroom. At Lion's Park, the project requires a 6-foot wide by 60-foot long sidewalk, totaling approximately 38 square meters, featuring a 90-degree turn and an 11-inch incline to provide access from the parking lot to playground equipment. The successful bidder is responsible for all site preparation and cleanup, ensuring that all sidewalks maintain a low profile for ease of use. A mandatory site visit with the Chief Administrative Officer, Derek Kwiatkowski, is required for all interested parties. Proposals must be submitted by October 30, 2026, at 2:00pm PST. All project work and final site cleanup must be completed no later than Friday, June 4, 2027, at 12:00pm. Inquiries regarding this solicitation should be directed to the Chief Administrative Officer via email at cao@salmo.ca.
Village of Salmo

POSTED

3 days ago

DEADLINE

in 18 days
View Details

More opportunities from California → City of Fresno

Same awarding agency

NAICS: 237310
New
SLED
City Of Fresno Pave More Now – Bid Package S-1.1
Solicitation # 12700712
The City of Fresno is soliciting bids for the Pave More Now Bid Package S-1.1, a public works project focused on concrete improvements at the McKinley-Blackstone-Olive-Van Ness Block. The scope of work includes the reconstruction of concrete curb ramps and repairs to driveways, valley gutters, sidewalks, and curbs and gutters. The project has a construction allocation of 1,500,000 dollars and must be completed within 80 working days from the Notice to Proceed. Failure to meet this timeline will result in liquidated damages of 1,000 dollars per calendar day. All work must adhere to the City of Fresno Department of Public Works Standard Specifications and various California building and safety codes, with a specific requirement to maintain ADA-compliant pedestrian routes during construction. The contract will be awarded to the lowest responsive and responsible bidder, with a five percent local preference available to businesses within a 25-mile radius of Fresno City Hall or within Fresno County that meet specific self-performance and local value thresholds. Bidders must submit a comprehensive proposal via the Planet Bids portal, including a bid deposit of up to 10 percent of the total net bid amount. Awarded contractors are required to provide 100 percent performance and payment bonds and comply with prevailing wage laws and anti-discrimination regulations. Administrative requirements include electronic invoicing and the maintenance of records according to Generally Accepted Accounting Principles. Final acceptance of the work is contingent upon a written execution by the City following a final inspection and the submission of all required warranties and manuals.
Highway, Street, and Bridge Construction

POSTED

3 days ago

DEADLINE

in 22 days
View Details
NAICS: 237310
New
SLED
City Of Fresno Pave More Now – Bid Package B-3
Solicitation # 12700699
The City of Fresno is soliciting bids for the Pave More Now Bid Package B-3, a pavement rehabilitation project across five locations: Cedar Avenue, First Street, the Shields-Van Ness-Brown-Palm Block, the Santa Ana-Fourth-Gettysburg-First Block, and the Sierra-Fourth-Escalon-First Block. The scope of work includes asphalt concrete grinding and overlay, full depth reconstruction in isolated areas, reconstruction of curb ramps, and repairs to sidewalks, curbs, and gutters. Additional requirements involve replacing roadway striping and advance stop bars, replacing traffic signal loops at affected intersections, and adjusting water valves and manhole lids to match proposed pavement grades. The construction allocation for this project is 6,450,000.00 dollars, and the contractor must complete all work within 120 working days from the Notice to Proceed. The contract will be awarded to the lowest responsive and responsible bidder, with a local preference given to businesses that self-perform at least 30 percent of the contract with Fresno County residents and ensure 50 percent of the contract value is performed by local entities. Bidders must provide a bid deposit of 10 percent of the total net bid amount and, upon award, must file 100 percent performance and payment bonds. Compliance with the California Labor Code, ADA accessibility standards, and the City of Fresno Community Workforce Agreement is mandatory. The contractor is also required to implement a Fugitive Dust Control Plan and adhere to NPDES storm water discharge permits. A one-year warranty period is required for all work following final acceptance by the City.
Highway, Street, and Bridge Construction

POSTED

3 days ago

DEADLINE

in 22 days
View Details

Ready to Pursue This Opportunity?

Get AI-powered intelligence on this solicitation and the ones like it

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 750+ contractors already using CLEATUS