Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, December 9 at 2:00 PM ET

Register Free →

This Solicitation opportunity from District of Columbia was posted on December 20, 2023. The submission period has ended. Browse the details below for market research, or find similar active opportunities.

Asset Prevention and Preventative Maintenance of Tunnels

Closed
DCKA-2023-R-0037State & Local

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

Active Opportunities Like This One

AI Contract Overview

Show more

The District of Columbia's Department of Transportation is seeking a contractor through an Incentive Contract to manage, operate, maintain, and rehabilitate specific tunnel assets within the city. The contractor is responsible for ensuring all tunnel assets meet or exceed established performance standards, specifically maintaining a "Good/4" level of service, within three months of mobilization and throughout the contract duration. Failure to meet these standards can result in financial penalties, withholding payments, or contract termination, while exceeding standards may earn incentive fees. The contractor will oversee daily operations, including staffing the tunnel control room, monitoring asset conditions, documenting maintenance activities via the Tunnel Maintenance Management System, and ensuring safety for travelers and first responders. Additionally, the contractor must promptly notify the District of major rehabilitation needs outside their scope and maintain adequate stock of replacement parts considering the age of the tunnels. The scope also includes rehabilitating tunnels as specified, performing repairs through authorized force account work, and providing staff training on new technologies. All personnel are expected to adhere to industry standards, comply with relevant codes and regulations, and work collaboratively with the District to ensure the safety, functionality, and longevity of the tunnel infrastructure.

Documents

0

No documents available

No documents were posted with this contract.

AI Contract Breakdown

Uniform Contract Format

No documents to break down

The breakdown needs solicitation documents. None were found from this contract's source.

This one is closed. Find the next one like it.

Open contracts like this one, right now:

  • Fire Alarm Monitoring ServicesOpen now, due in 17 days
  • Air Travel Ticketing and Booking Services (Islamabad-Bangkok)Open now
See open contracts like this

Ask CLEATUS

I've read this contract. Ask me anything.

Timeline

PhaseClosed
Posted

Solicitation

Response Deadline

Deadline has passed

Submission Closed

Find active opportunities like this

Get full access to discover similar active contracts, track opportunities, and build proposals with AI assistance.

Organization & Contact Information

Show more
AgencyDistrict of Columbia → D.C. Department of Transportation
ContactsNo contacts available
OfficeN/A
Office AddressN/A
ContactsNo contact information available

Full Description

Show more
The District of Columbia, Office of Contracting and Procurement (OCP), on behalf of the Department of Transportation (DDOT), intends to enter into an Incentive Contract (the Contract) to obtain asset management and preservation services to operate, maintain and rehabilitate specific tunnel assets, as shown in paragraphs C.2.12, within the District of Columbia. It is the requirement of the Contract to have all of the covered assets (and the system where a performance measure relates to the overall system) in all of the tunnels meet or exceed the Performance Standard for each performance measure three months after the completion of mobilization. The Contractor shall then maintain all assets in a condition that does not fall below the Performance Standard for each performance measure for the remaining contract period. Failure to do so can result in the application of a disincentive fee (see Section H.16), withholding of retainage (see Section G.9.1), reductions in payments to the Contractor (see Section G.9.1), withholding of the final invoice payment (see Section G.9.1), or termination in whole or in part of the Contract through default (e.g., Termination for Default) (see Attachment J.1). If maintenance results in conditions that exceed the Performance Standard, an incentive fee will be applied in accordance with Section H.16. All of the covered assets associated with all of the tunnels need to meet or exceed the Performance Standard for each performance measure which for the first 3 months will be responsibility of the previous Contractor. At the conclusion of the first 3 months the new Contractor shall meet or exceed the performance standards for each performance measure and all aspects of the Contract throughout the remaining period of the Contract. Through this Incentive Contract, The Contractor shall assume the responsibility for operating, preserving, managing, maintaining, and rehabilitating tunnel assets for all of the Districts tunnels. The activities required under this Contract include but not limited to:  Operating tunnel systems and staffing the Tunnel Control Room; and  Repairing, rehabilitating, and maintaining the tunnel assets to ensure that they do not fall below the minimally acceptable performance standard, which is the Good/4 Level of Service score, as defined in Appendices A-1, A-2, and A-3 of this contract, within the covered system; and  Daily monitoring of the condition of tunnel assets within the covered system; and  Daily use of the Districts Tunnel Maintenance Management System (TMMS) for documentation of all maintenance, repair and upgrades; and Maintaining safe conditions throughout the tunnel for the traveling public, and assisting first responders during an accident, fire or other event in and around the tunnel.  Ensuring that the District is notified immediately of major rehabilitation or reconstruction needs (such as pavement or tunnel structural rehabilitation or reconstruction) for which the Contractor is not responsible under the Contract, or elements not in contract but representing a hazard to the traveling public or workers.  Maintaining adequate stock of maintenance items. Offerors shall consider the age of the tunnels and systems; some replacement items are difficult to find and may require long lead times to procure.  Rehabilitating tunnels as defined in the CLIN 0006 upgrades.  Performing requested work through Force Account (CLIN 0009) at the direction of the CO, to perform repairs or replacement of structures or equipment.  Obtaining staff training as needed to stay abreast of new technologies. The Contractors personnel shall work with the District and shall be held accountable to the same standards of behavior (as a minimum), confidentiality, and workmanship as industry standard practice. All work performed by Contractor personnel must be in accordance with all specifications, codes, rules, gui

Find Active Opportunities Like This

Get AI-powered intelligence on the opportunities still open

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 750+ contractors already using CLEATUS