Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, August 5 at 2:00 PM EDT

Register Free →

Auxiliary Spillway Construction (Concrete Structures)

Active
State & Local

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

General Info

Agency

Kentucky → Dept- Environmental ProtectionView Agency

NAICS

238110 - Poured Concrete Foundation and Structure ContractorsView NAICS

Place of Performance

Other, KY, US

Set-Aside

NONE

Documents

(0)

No documents available

AI Contract Breakdown

Uniform Contract Format

No contract breakdown available.

Cannot generate Contract Breakdown because no documents were found from this contract's source.

Timeline

Posted

subcontract

Response Deadline

Submission deadline

Response Deadline

Ready to pursue this opportunity?

Start your free trial to track this contract, build proposals with AI assistance, and manage your pipeline.

Organization & Contact Information

Show more
AgencyKentucky → Dept- Environmental Protection
ContactsNo contacts available
OfficeN/A
Organization / Agency
Kentucky → Dept- Environmental Protection
View Agency Profile
Office AddressN/A
ContactsNo contact information available

Full Description

Show more
Construction of a reinforced concrete auxiliary spillway including precast culverts, stepped chute, and stilling basin.

Similar Contracts

Same NAICS industry code

NAICS: 238110
New
SLED
Biffy Facility ImprovementsThe project involves the construction of a new non-combustible, explosion-proof structure designed to house critical equipment with full compliance to NFPA 820 and FDA sanitation standards. The facility will include interior and exterior lighting, ventilation, space heating for freeze protection, fire extinguishers, accessible doors, and surveillance cameras to ensure safety and operational integrity. A redundant pump system with a backup pump and biffy tank will be installed to guarantee continuous operation during failures, along with backflow prevention measures. An emergency eyewash and shower station with tempered water will be provided for worker safety. The electrical and mechanical systems will be upgraded to meet modern standards, including enhancements to channel drains and wet well cleaning infrastructure to improve efficiency and maintenance access. All work must adhere to stringent safety and hygiene protocols, with the structure built to prevent explosions and resist combustion, ensuring suitability for hazardous environments. The project is managed by the Port of Seattle’s Aviation Project Management Group, with primary contact Jay Kim and project manager Rishiraj Savita overseeing implementation. The solicitation is listed as a forecast with a NAICS code of 238110, indicating construction of building projects, and no set-aside designation has been specified. The location of performance is tied to the Port of Seattle’s facilities, though specific address details are not disclosed. The anticipated timeline aligns with the posted date of July 2026, and interested parties should reach out via the provided contact information for further details.
Aviation Project Management Group

POSTED

about 7 hours ago

DEADLINE

N/A
View Details
NAICS: 238110
New
SLED
Wyndon Avenue Stormwater RepairsSealed proposals are solicited by the Township of Lower Merion for the Wyndon Avenue Culvert Repairs project, identified by Contract Number 26-26-4652, with submissions required electronically through the PennBid platform by 11 a.m. on Thursday, August 27, 2026. The project involves replacing an existing brick culvert with a new culvert pipe and encompasses a full range of site work including sawcutting and selective demolition, erosion and sediment control, traffic management, stormwater improvement construction, and full pavement and site restoration. A pre-bid conference is scheduled for July 28, 2026, at the job site on Wyndon Avenue between Kennedy Lane and N Merion Avenue, with a rain date of July 30, 2026, if needed. Bidders must submit a Bid Guaranty and are required to provide a Performance Bond and Labor and Materials Bond each equal to 100% of the contract value, as well as a Maintenance Bond amounting to 25%. All work must comply with specifications developed by Pennoni Associates, Inc., and questions must be submitted via PennBid’s messaging system no later than close of business on August 14, 2026. The award is anticipated for September 23, 2026, with a Notice to Proceed targeted for late October 2026. Contractors must adhere to strict labor and compliance standards, including payment of no less than the minimum salaries and wages as specified and strict adherence to equal employment opportunity requirements under 41 CFR Part 60-4-8, prohibiting discrimination based on race, color, religion, sex, national origin, age, disability, or sexual orientation and gender identity. All subcontractors must maintain commercial general liability, business auto liability, workers’ compensation, and professional liability insurance, with the Township of Lower Merion named as an additional insured on all policies except workers’ compensation. Certificates must reference the bid number and title. The bidder must be financially responsible, possess the necessary skill and integrity, and submit required certifications including a Non-Collusion Affidavit, Employment Verification Form, Statement of Bidder’s Qualifications, and, if applicable, an MBE/WBE State Certificate. The project is subject to the Prevailing Wage Act and ADA compliance, and the Township reserves the right to reject any or all bids. Payment will be processed through the Paymerang
Montgomery County

POSTED

1 day ago

DEADLINE

in about 1 month
View Details

More opportunities from Kentucky → Dept- Environmental Protection

Same awarding agency

NAICS: 237990
New
SLED
RFB-785-2600000643-5 | RFB-275-26 Willisburg Lake Dam Rehabilitation ProjectThe RFB-785-2600000643-5 solicitation for the Willisburg Lake Dam Rehabilitation Project in Washington County, Kentucky, seeks competitive bids for comprehensive civil construction and environmental remediation work under the NAICS code 237990. The project encompasses the design and construction of a reinforced concrete auxiliary spillway with two precast culverts, a stepped chute, and a stilling basin, alongside a floodwall with cutoff wall along KY-555, rockfill placement on dam slopes, a stability berm, and replacement of the low-level drawdown valve. Additional scope includes selective demolition of outdated infrastructure such as storm sewers, raw water lines, and piezometers; repair of seepage and cracking in the principal spillway culvert; abandonment of Springfield’s existing water intake; installation of new intake lines within the culvert; erosion and sediment control; traffic management; water control; site security; and full restoration. All work must comply with Kentucky Division of Water standards and referenced specifications, including ASTM E154 for waterproofing with minimum 60-pound puncture resistance, and explicitly prohibit piling within the dam embankment. Bids must be submitted electronically via the Kentucky Vendor Self Service portal by August 31, 2026, at 1:30 PM Eastern Time, with no hard-copy or email submissions accepted. Offerors are required to register in the VSS system and submit an Official Bid Document containing pricing details as a single PDF alongside any required bid bond. The solicitation does not include federal FAR clauses, socioeconomic set-asides, UEI or CAGE code requirements, or formal evaluation factors such as weighted scoring or trade-off analysis. Contract award is implied to be based on lowest responsive bid, with minimal emphasis on technical proposal evaluation beyond basic compliance. No contract value estimate is disclosed, and pricing is to be submitted solely in the bid document with $0.00 entered in the online system. The procurement is not subject to Buy American or domestic preference laws. Key contacts include Susan Ward of the Division of Engineering and Contract Administration as the primary point of contact and Glen Alexander of the Division of Water as the technical liaison, with Stantec Consulting serving as the third-party consultant. Performance is expected entirely at the Willisburg Lake Dam site with no specified duration, delivery terms, or invoicing method outlined.
Other Heavy and Civil Engineering Construction

POSTED

3 days ago

DEADLINE

in about 1 month
View Details