Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, June 24 at 2:00 PM EDT

Register Free →

This Sources Sought opportunity from Department Of Transportation was posted on May 19, 2026. The submission period has ended. Browse the details below for market research, or find similar active opportunities.

AZ BL COLO 7528(1) Burro Creek Road

Closed
6982AF26SS0012Federal

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

Active Opportunities Like This One

AI Contract Overview

Show more

This contract opportunity seeks qualified prime contractors who are small businesses, including HUBZone, woman-owned, 8(a), and service-disabled veteran-owned small business concerns, interested in submitting bids for a resurfacing, restoration, and rehabilitation project on Burro Creek Road in Mohave County, Arizona. The project covers approximately 1.3 miles of roadway from the bridge over Burro Creek to the cattle guard near US Highway 93, aiming to improve access to recreational areas, enhance drainage and sediment control, reduce maintenance costs, and address safety concerns. Key construction activities include full depth reclamation and asphalt paving, drainage improvements such as cross culvert installation and ditch reconditioning, earthwork and slope stabilization, and the installation of safety and traffic control measures. Interested contractors must demonstrate their intent to bid by June 4, 2026, and provide details about their socioeconomic status, bonding capacity for a project up to $5 million, and relevant experience with similar projects on national forest, park, or other sensitive lands. The contract is structured into a base Schedule A for the main roadway rehabilitation and an Option X for additional bridge and sedimentation repair work. The project involves significant quantities of materials and work items, including thousands of tons of asphalt and aggregate, pipe culverts, ditch reconditioning, and boulder placement. The anticipated advertisement date is October 2026, with construction starting in January 2027 and completion expected by October 2027. The estimated contract value is between $2 million and $5 million.

General Info

Small business contractors sought for $2-5M roadway resurfacing, drainage, and safety project in Arizona.

Agency

Department Of Transportation → 6982AF Central Federal Lands Divisi

NAICS

237310 - Highway, Street, and Bridge Construction View NAICS

Place of Performance

Kingman, AZ, 86401, USA

Set-Aside

SBA

Documents

(0)

No documents available

AI Contract Breakdown

Uniform Contract Format

No contract breakdown available.

Cannot generate Contract Breakdown because no documents were found from this contract's source.

Timeline

PhaseClosed
Posted

Sources Sought

Response Deadline

Deadline has passed

Submission Closed

Find active opportunities like this

Start your free trial to discover similar active contracts, track opportunities, and build proposals with AI assistance.

Organization & Contact Information

Show more
AgencyDepartment Of Transportation → 6982AF Central Federal Lands Divisi
Contacts2 people available
OfficeLAKEWOOD, CO, 80228, USA
Organization / Agency
Department Of Transportation → 6982AF Central Federal Lands Divisi
Office AddressLAKEWOOD, CO, 80228, USA
Contacts
Eric Grosskreuz

Full Description

Show more

THIS IS NOT A REQUEST FOR BID – PLANS AND SPECIFICATIONS ARE NOT AVAILABLE.


THIS NOTICE IS BEING ISSUED TO DETERMINE IF THERE IS SUFFICIENT  INTEREST FROM QUALIFIED PRIME CONTRACTORS who are small businesses, HUBZone small businesses, woman owned small business concerns, 8(a) small businesses, or service disabled veteran-owned small businesses and who intend to submit a bid for this solicitation to allow for a set-aside in one of these programs must submit the following by e-mail to cflacquisitions@dot.gov (Attn:  Eric Grosskreuz) for receipt by close of business (2 p.m. local Denver time) on June 4, 2026: 


(1) A positive statement of your intention to submit a bid for this solicitation as a Prime Contractor;


(2) A list of all confirmed socioeconomic categories (i.e., 8(a), small disadvantaged business, HUBZone small business, service-disabled veteran-owned small business, EDWOSB, or WOSB status) that apply to your business;


(3) A letter from a bonding agent stating your firm’s capability to bond for a single project of $5 million, and your firm’s aggregate bonding capacity; and


(4) Provide a list of road construction projects of equal or greater value and similar scope to that described herein and in which you performed (as the prime contractor) work in a national forest, national park, Bureau of Land Management lands, national monument and/or natural resource sensitive areas.  Experience in full depth reclamation or pulverization, asphalt paving and roadway culvert installation is required. State whether your firm was the prime contractor or subcontractor on the project. 


 DO NOT SEND INFORMATION ON PROJECTS THAT DO NOT INCLUDE THE ABOVE WORK.


The size of a small business firm includes all parents, subsidiaries, affiliates, etc.  Refer to the Code of Federal Regulations 13 CFR 121.103 for information on how the SBA determines affiliation and 13 CFR 121.108 regarding the penalties for misrepresentation of size status.  All firms should be certified in the System for Award Management (SAM) located at https://www.sam.gov


Project Details:


AZ BL COLO 7528(1) Burro Creek Road


Burro Creek Road is located in Mohave County, 71 miles southwest of Kingman, Arizona. The project is located in rolling terrain, with elevations along this section ranging from approximately 1,885 to 2,255 feet.  The project begins at the bridge over Burro Creek and ends at the cattle guard near the intersection with US Hwy 93. The project's length is approximately 1.3 miles.


The proposed of this resurfacing, restoration, and rehabilitation (3R) project is to improve access to the camping and day use areas at the Burro Creek Campground, reduce maintenance costs and erosion, improve sediment control, drainage and safety.  The scope of work for this project includes the following major construction activities and items:


  • Pavement Rehabilitation: 1.3 miles of roadway resurfacing incorporating Full Depth Reclamation (FDR) and Asphalt Concrete Pavement, along with applicable fog seals and tack coats.
  • Drainage Improvements: Installation of cross culverts and reconstruction of an existing headwall.  Additional drainage work includes ditch grading and reconditioning, berms, bank stabilization, and the addition of flared end sections and riprap aprons throughout the project.
  • Earthwork & Stabilization: Embankment benching, slope stabilization, slope scaling, and specific bridge approach repairs at the eastern abutment to resolve undercutting concerns
  • Safety & Traffic Control Items: Installation of new regulatory and warning signs, pavement markings and the placement of boulders to control public access at specific locations throughout the project.

The project is structured with a base Schedule A encompassing the primary roadway rehabilitation, and an Option X which includes work associated with repairing bridge sedimentation, addressing undercutting at the bridge approaches, and boulder placement.


PRINCIPAL WORK ITEMS:


Roadway Aggregate: 1,600 TONS


Ditch Reconditioning: 2,000 LNFT


Full Depth Reclamation: 1.3 MILE


Asphalt Concrete Pavement: 3,600 TON


18-Inch Pipe Culvert: 100 LNFT


24-Inch Pipe Culvert: 175 LNFT


Boulder: 100 EACH


It is anticipated that this project will be advertised in October 2026 and be under construction in January 2027.  The project has an estimated completion date of October 2027.


The estimated price range of the project work is between $2,000,000 and $5,000,000.