Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, September 16 at 2:00 PM EDT

Register Free →

Stormwater Pollution Prevention Plan (SWPPP) Development and Compliance

Active
Federal

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

AI Contract Overview

Show more

The contract focuses on the development, implementation, and ongoing monitoring of a Stormwater Pollution Prevention Plan (SWPPP) to ensure compliance with environmental regulations throughout the construction process. It is a subcontract issued by the Department of Transportation under the Central Federal Lands Division, associated with NAICS code 541620, which pertains to environmental consulting services. The work takes place in the area identified by the ZIP code 82831, although specific location details are not provided. The contract requires specialized expertise to create and maintain a comprehensive plan that mitigates pollution risks from stormwater runoff during construction activities. This includes assessing potential sources of contamination, implementing control measures, conducting regular site inspections, and ensuring adherence to federal environmental standards. The goal is to minimize the environmental impact of the construction site by preventing pollutants from entering water bodies, thereby supporting regulatory compliance and protecting natural resources.

General Info

Develop and monitor Stormwater Pollution Prevention Plan ensuring environmental compliance during construction.

Agency

Department Of Transportation → 6982AF Central Federal Lands DivisiView Agency

NAICS

541620 - Environmental Consulting ServicesView NAICS

Place of Performance

WY, 82831, USA

Set-Aside

NONE

Documents

This scope was carved out of 6982AF26C000021.

The full solicitation package (1 document), including the RFP, is on the prime solicitation, not on this scope.

View the prime solicitation

WY FLAP SHE 26(1), Red Grade Road, Phase 1

AI Contract Breakdown

Uniform Contract Format

No contract breakdown available.

Cannot generate Contract Breakdown because no documents were found from this contract's source.

Timeline

Posted

subcontract

Ready to pursue this opportunity?

Start your free trial to track this contract, build proposals with AI assistance, and manage your pipeline.

Organization & Contact Information

Show more
AgencyDepartment Of Transportation → 6982AF Central Federal Lands Divisi
ContactsNo contacts available
OfficeN/A
Organization / Agency
Department Of Transportation → 6982AF Central Federal Lands Divisi
View Agency Profile
Office AddressN/A
ContactsNo contact information available

Full Description

Show more
Development, implementation, and monitoring of a SWPPP to comply with environmental regulations during construction.

Similar Contracts

Same NAICS industry code

NAICS: 541620
New
SLED
PA-2400377 Conditional Use Permit / Camp Goldstar Project
Solicitation # PA-2400377
Conditional Use Permit PA-2400377 authorizes the construction and operation of Camp Goldstar, a private resort located on McDonald Island in the Sacramento-San Joaquin River Delta within San Joaquin County, California. The development features 25 prefabricated mobile lodges, four of which must be ADA accessible, and a 6,160-square-foot L-shaped marina dock with a capacity for 33 to 44 boats. Supporting infrastructure includes a 6,500-square-foot two-story clubhouse with a caretaker's unit, a 1,440-square-foot garage, a 2,500-square-foot pool and spa area with five cabanas, and various recreational facilities such as bocce ball, volleyball, and pickleball courts. Additional site amenities consist of a picnic shelter, dog run, communal restrooms, a housekeeping and laundry building, a gazebo, two observation towers, and 27 fire pits. The project will utilize on-site private water, sanitary sewer, and storm drainage systems. The project was approved by the Planning Commission on November 6, 2025, following a Mitigated Negative Declaration under CEQA, which determined that proposed mitigation measures would reduce environmental effects to insignificant levels. Key regulatory requirements include compliance with AG-80 zoning and OS/RC General Plan designations, as well as adherence to California Health and Safety Codes for septic systems and specific county standards for storm drainage and lighting. Special mandates include the registration of mobile lodges as recreational vehicles with the State of California and strict adherence to CalGEM guidelines regarding the abandonment of oil and gas wells on the property. Construction is scheduled to begin in January 2026, progressing through site preparation, grading, underground utilities, and building construction, with a projected completion date of November 30, 2026.
San Joaquin County

POSTED

about 15 hours ago

DEADLINE

N/A
View Details
NAICS: 541620
New
SLED
Mid-Town Area/Specific Plan Initial Study/Initial Environmental Checklist/Negative DeclarationThe City of South Lake Tahoe is advancing the Mid-Town Area Plan, a comprehensive land use and zoning revision for approximately 780 acres in the heart of the community, designed to align with regional environmental goals set by the Tahoe Regional Planning Agency. This plan expands the existing Town Center overlay from 65 acres to 339 acres, introducing more flexible development standards for height, density, and land coverage to encourage mixed-use, residentially-oriented redevelopment that fosters a walkable, vibrant downtown core. Key environmental designations overlay portions of the plan area, including a stream restoration zone and Shorezone Tolerance District 4, ensuring that development proceeds within the ecological constraints of the Lake Tahoe Basin. The initiative is supported by an Initial Environmental Checklist and Negative Declaration, affirming that the proposed changes, when implemented with specific mitigation measures, will not result in significant environmental impacts under CEQA and TRPA regulations. The project focuses on sustainable growth, targeting improvements in housing availability, transportation efficiency, greenhouse gas reduction, and stormwater management while respecting local infrastructure capacities and noise thresholds defined by CNEL standards. The planning effort is led by the City of South Lake Tahoe with technical support from Ascent Environmental Inc., with primary coordination managed by the City’s Senior Planner, Anna Kashuba. Although this initiative is fundamentally a zoning and environmental planning document rather than a procurement contract, it involves formal administrative review processes requiring compliance with TRPA Code, California Building Code, and state environmental regulations. Inspection and acceptance responsibilities are shared between City and TRPA authorities, who oversee adherence to performance criteria such as erosion controls, hazardous materials handling, geotechnical standards, and wastewater system limits. While no formal contract value, payment terms, solicitation number, or federal acquisition clauses are present, the project operates under a defined timeline for public review from July 21 to August 19, 2026, with subsequent implementation dependent on regulatory approval and community input. The plan serves as the foundational regulatory framework for future development in the designated area, integrating environmental sustainability with urban revitalization objectives without invoking traditional federal contracting mechanisms or procurement structures.
City of South Lake Tahoe

POSTED

about 15 hours ago

DEADLINE

N/A
View Details

More opportunities from Department Of Transportation → 6982AF Central Federal Lands Divisi

Same awarding agency

NAICS: 237310
New
Federal
NV BL SONV 500(3) Red Rock Trail
Solicitation # 6982AF26SS00007
The Red Rock Trail project in Las Vegas, Nevada, is currently in the sources-sought phase to determine if there is sufficient interest from qualified small business prime contractors to justify a set-aside. Located within the environmentally sensitive Red Rock Conservation Area, the scope of work involves constructing approximately seven miles of paved multi-use trail, widening State Highway 159 for additional turn lanes, and reconstructing the Moenkopi and Blue Diamond Mesa parking areas. Key technical requirements include 35,000 cubic yards of embankment construction, 30,000 tons of roadway aggregate, 12,000 tons of asphalt concrete pavement, 200 linear feet of precast reinforced concrete box culverts, and 2,500 square feet of MSE wall. Interested prime contractors must be certified in the System for Award Management and submit their response to Douglas Whitcomb by September 23, 2026, at 2 p.m. local Denver time. Submissions must include a statement of intent to bid, confirmed socioeconomic categories, a bonding agent letter verifying a single project capacity of 30 million dollars, and a list of previous road construction projects of similar value and scope. Specifically, applicants must demonstrate experience in multi-use trail construction, highway widening, parking area reconstruction, and grade-separated under-crossings within environmentally sensitive areas.
Highway, Street, and Bridge Construction

POSTED

about 10 hours ago

DEADLINE

in 14 days
View Details

Ready to Pursue This Opportunity?

Get AI-powered intelligence on this solicitation and the ones like it

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 650+ contractors already using CLEATUS