This Combined Synopsis/Solicitation opportunity from Department Of Defense was posted on November 17, 2006. The submission period has ended. Browse the details below for market research, or find similar active opportunities.

B--Geotechnical Borings and Soil Sampling at the American Dam, El Paso, Texas

Awarded
W912HZ07T0007Federal

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

Active Opportunities Like This One

AI Contract Overview

Show more

Solicitation W912HZ-07-T-0007 is a request for quotation for geotechnical borings and soil sampling at the American Dam in El Paso, Texas, issued by the USACE Vicksburg District. The project involves drilling twelve borings of varying depths to support under-seepage analysis, including four deep borings up to 100 feet, two abutment borings up to 50 feet, and six shallow borings to 30 feet. The scope includes performing falling head tests, collecting split spoon samples, and providing detailed field logging and reporting using the Unified Soils Classification System. This procurement is 100 percent set aside for small businesses under NAICS Code 541380. A critical requirement is that the contractor must use a USACE certified laboratory located in the local El Paso area to facilitate coordination with government personnel. The contract is a simplified acquisition to be awarded to the responsive offeror with the lowest price, with a final delivery deadline of December 15, 2006. Quotes were due by November 28, 2006.

General Info

Contract Value

$18,390

NAICS

541380 - Testing Laboratories and Services

Place of Performance

MS, USA

Set-Aside

SBA

Award Issued Date

Documents

0

No documents available

Documents will appear here when they are available.

AI Contract Breakdown

Uniform Contract Format

No documents to break down

The breakdown needs solicitation documents. None were found from this contract's source.

Timeline

PhaseAwarded
Posted

Combined Synopsis

Awarded

Contract was awarded

Submission Closed

Find active opportunities like this

Get full access to discover similar active contracts, track opportunities, and build proposals with AI assistance.

Organization & Contact Information

Show more
AgencyDepartment Of Defense → W07V Endist Vicksburg
ContactsNo contacts available
OfficeVICKSBURG, MS, 39183-3435, USA
Office AddressVICKSBURG, MS, 39183-3435, USA
ContactsNo contact information available

Full Description

Show more
This is a combined synopsis/solicitation for commercial items prepared in accordance with the format in Subpart 12.6, as supplemented with additional information included in this notice. This announcement constitutes the only solicitation; quotes are being requested and a more detailed solicitation is available on the Federal Technical Data Solutions (FEDTEDS) Web Page at http://www.fedteds.gov/ or at https://www.fedteds.gov/fedteds/start.nsf/frm.VendorLogin?OpenForm&SolicitationNumber=W912HZ-07-T-00 07 , which includes exhibits that could not be posted as this site. Offerors should check the FEDTEDS Web Page often for new solicitations and/or changes (AMENDMENTS) to existing ones. Solicitation Number W912HZ-07-T-0007 is being issued as a request for q uotation (RFQ) with the intent to award as a simplified acquisition. The solicitation document and incorporated provision and clauses are those in effect through Federal Acquisition Circular 2005-13. This procurement is 100% set aside for small business c oncerns under NAICS Code 541380 (SIC 8734) with a size standard of $11,000,000. The USACE, Vicksburg District, Consolidated Contracting Office, proposes to award a simplified acquisition for Geotechnical borings and soil sampling at American Dam, El Paso, Texas. 1. Introduction. Twelve borings will be drilled at the American Dam, El Paso,TX, for the U.S. International Boundary and Water Commission (IBWC) to support the under-seepage analysis at the structure. The drilling and soil sampling work will be performed in conjunction with an engineering analysis of the sheet pile cutoff upstream of the dam, under-seepage analyses of the foundation, and ground penetrating radar surveys (GPR) beneath the concrete aprons to determine whether voids are present in the founda tion. 2. Drilling. Borings will be drilled by a geotechnical company with soil testing capabilities that have been certified by the US Army Corps of Engineers (USACE) lab certification program. Costs and time associated with the mobilization and demobilization of drilling crews and equipment, and shipping costs associated with transporting soil samples for laboratory soil testing are critical. The geotechnical soils testing laboratory must be identified on the approved Engineer Research and Development Center (ERDC), Geotechnical and Structures Laboratory (GSL) Materials Testing Center website at http://gsl.erdc.usace.army.mil/gsl.html. This website provides a listing for USACE certified labs nationwide. A local El Paso soils testing lab is required because E RDC personnel will work with the drilling contractor to identify the selected soil samples for later laboratory soils testing. Because the drilling, sampling, and soils testing are part of other concurrent studies, it is necessary for the laboratory to be in the local area to minimize travel by the Government Point of Contact (POC). 3. Specifications. Specifications for the drilling, soil sampling, and testing are described as follows: 3a. Boring Locations and Depths. Exact boring locations will be provided to the contractor prior to drilling. Borings will be drilled in the channel upstream and downstream of the American Dam during the non-irrigation season, and at each abutment. Four deep borings to determine the stratigraphy beneath the dam will be drilled as part of this scope of work. Deep borings will be drilled to bedrock or 100 ft maximum depth depending on whichever is less. Deep borings will be drilled in the channel upstrea m and downstream of the dam. Two borings will be drilled in each abutment to 50 ft maximum depth or bedrock to determine the abutment stratigraphy and properties. Additionally, six shallow borings to 30 ft depth will be drilled in the channel area upstre am and downstream of the dam to characterize the soil texture and stratigraphy beneath the dam. Access roads to the floodplain will be constructed by the International Boundary and Water Commission (IBWC). A temporary cofferdam to divert river flow into the American Canal will be constructed by the IBWC to permit the safe occupation of the floodplain for drilling and the dewatering of the upstream, northeast corner of the dam. Dewatering of the ups tream corner of the dam will be conducted to permit sheet-pile inspection using a commercial company (not part of this scope of work). Screening of boring locations will be performed by the drilling contractor through Texas One-Stop utility service and US IBWC to avoid utility lines (gas, electric, water, etc.). 3b. Falling Head Tests. Two falling head tests at channel locations to be determined will be conducted to characterize the in-situ permeability of floodplain soils. Falling head tests will be conducted either through the hollow-stem auger and/or installa tion of temporary piezometers. 3c. Sampling Procedures. Split spoon samples will be taken at 2-1/2 ft interval over the first 15 ft of the boring depth, and at 5 ft sample interval below 15 ft depth (i.e., 20, 25, 30, 35, etc.). Blow counts will be recorded on the field boring logs at 0.5 ft interval and samples will be made using a 140 lb drop hammer and standard split-spoon. A larger split-spoon may be used providing it is cleared with the Corps site representative. 3d. Field Logging and Reporting. A boring log will be prepared by the contractor showing the soil lithology, sampling and drilling techniques, blow counts, ground water levels, and other observations of importance. The boring log should include the class ification and testing of soils by the Unified Soils Classification System (USCS). A brief letter report describing drilling methods, boring logs, and laboratory soils testing procedures will be presented as a final deliverable under this scope of work. 3e. Completion of Borings. Borings will be grouted with a bentonite-portland cement slurry following drilling in accordance with State Regulations. Grouting will be from the bottom of each hole to the top. 3e. Laboratory Soil Testing and Laboratory Requirements. Selected soil samples will sent to a Corps approved laboratory for soil testing as previously defined in paragraph 1 above. Lab testing will consist of approximately 180 grain size analysis, and 1 0 Atterberg limit tests. A table and report of laboratory soil test results will be provided within 60 days after completion of the field work. All soil test results will be reported using the Unified Soil Classification System (USCS). Copies of field l ogs and report quality boring logs will be included in the final report to be furnished to the ERDC under this contract. 4. Performance Measurements. Performance measurements are identified in Table 1. 5. Quality Control. The contractor shall utilize their own internal quality control processes to ensure services are performed in accordance with this scope of work. 6. Quality Assurance. The Government method of surveillance will be 100% inspection. Table 1. Service Delivery Summary PERFORMANCE OBJECTIVE SOW PARA. PERFORMANCE THRESHOLD . Complete drilling and soil sampling as described in the scope of work for 10 holes to the full depth of each hole. See 3a to 3e No critical and less than 1 major discrepancy  Critical Discrepancy: Failure to complete the drilling and sampling of 12 boreholes.  Major Discrepancy: Failure to complete drilling of 1 hole for less than the total depth of the borehole. This procurement may be quoted as follows: Line Item 0001 Supplies/Services: Geotechnical Borings & Soil Sampling for American Dam in accordance with scope of work, Quantity: 1 Unit: Lump Sum: Total amount for Line Item 0001 $____________. Delivery is not later than 15 December 2006. Award shall be made to the responsive and responsible offeror whose quote is determined to be the lowest price. FAR Provision 52.212-1, Instructions to Offerors - Commercial, applies to this acquisiti on. Offerors must include a completed copy of the provision at FAR 52.212-3, Offeror Representations and Certifications-Commercial Items with this offer. The Clause 52.212-4, Contract Terms and Conditions, applies to this acquisition. The Clause at 52.212- 5, Contract Terms and Conditions Required to Implement Statutes or Executive Orders - Commercial Items, applies to this acquisition. If you are not registered in the CCR, an award CANNOT be made to your company. You may register electronically at http://w ww.ccr.gov. Registering electronically will expedite the registration process acquisition. Quotes are due 28 November 2006 not later than 2:00 p.m. at the Vicksburg Consolidated Contracting Office, ATTN: Judy Anderson, 4155 Clay Street, Vicksburg, Missi ssippi 39183-3435, at +1 (555) 000-0000 or e-mail at contact@example.gov . For information concerning this solicitation, contact Judy Anderson at +1 (555) 000-0000 or email at contact@example.gov . Offerors should check the FedTeds Web Page often for new solicitations and/or changes (AMENDMENTS) to existing ones. T HIS PROCUREMENT IS 100% SET ASIDE FOR SMALL BUSINESS CONCERNS UNDER NAICS CODE 541380 (SIC 8734) WITH A SIZE STANDARD OF $11,000,000.00.

More opportunities from Department Of Defense → W07V Endist Vicksburg

Same awarding agency

NAICS: 561210
New
Federal
Operation and Maintenance of Arkansas Lakes Project
Solicitation # W912EE26RA015
Solicitation W912EE26RA015 is a 100% total small business set-aside procurement issued by the U.S. Army Corps of Engineers, Vicksburg District, under NAICS code 561210. The contract is a Firm Fixed Price Indefinite Delivery Indefinite Quantity (IDIQ) vehicle intended for the operation, maintenance, and repair of government-owned facilities and equipment at Lake Ouachita, Lake Greeson, and DeGray Lake in Southwest Arkansas. The scope of work is comprehensive, covering janitorial and custodial services, mowing and landscaping, dumpster and waste disposal, heavy equipment repair, erosion control, and emergency debris removal following natural disasters. The contract structure consists of a base ordering period, four option years, and a final six-month option, with a minimum guarantee of 1,500 dollars and a task order maximum of 9 million dollars. The government will award the contract based on a best-value tradeoff process, prioritizing technical approach, staffing, and management approach as the most important factor, followed by past performance, with price being the least significant factor. Proposals must be submitted in three separate volumes and adhere to strict formatting and page limits. Key requirements include the designation of a Project Superintendent as key personnel, compliance with the EM 385-1-1 Safety Manual, and adherence to Cybersecurity Maturity Model Certification (CMMC) standards. Following several amendments to refine the scope of work and bid schedules, the final response deadline has been extended to November 2, 2026.
Facilities Support Services

POSTED

1 day ago

DEADLINE

in 4 days
View Details
NAICS: 332311
New
Federal
Arkabutla Lake Water Plant Rehab and Pre-fabricated Metal Building Installation
Solicitation # W912EE27QA002
Solicitation W912EE27QA002 is a request for quotes from the U.S. Army Corps of Engineers, Vicksburg District, for a turn-key rehabilitation project at the Arkabutla Lake Water Plant in Hernando, Mississippi. The project requires the abandonment of an old well and the installation of a 30 by 50 foot pre-fabricated metal Red Iron open span building to protect a newly installed well. The scope of work includes comprehensive plumbing installations meeting AWWA specifications, the sandblasting and multi-coat painting of a potable water tank using Tnemec and urethane systems, and electrical upgrades compliant with 2020 NEC requirements, including a 200-amp circuit breaker and pump control panel. The government intends to award one firm-fixed-price contract to the lowest priced quote that is determined to be technically successful. Evaluation factors include the contractor's methodology for well abandonment, coating specifications, electrical compliance, and the provision of PE-stamped building drawings and staff licensing. While originally a small business set-aside, Amendment One updated the set-aside type to unrestricted and extended the response deadline to November 6, 2026. All work must be completed within 120 calendar days of the award. Contractors must comply with DoD item unique identification standards and cybersecurity requirements, including CMMC and safeguarding of covered defense information.
Prefabricated Metal Building and Component Manufacturing

POSTED

3 days ago

DEADLINE

in 8 days
View Details
NAICS: 237990
New
Federal
CONCORDIA PARISH, LOUISIANA; FC/MR and T, WBMRL; LEVEE, ENLARGEMENT AND BERMS; UPPER LAKE CONCORDIA - VIDALIA, ITEM 367-R
Solicitation # W912EE27RA001
Solicitation W912EE27RA001 is a firm fixed price construction project issued by the US Army Corps of Engineers, Vicksburg District, for levee enlargement, the construction of seepage berms, and temporary access roads in Concordia Parish, Louisiana. The project, identified as Item 367-R, has an estimated value exceeding 10 million dollars and a performance period of 440 calendar days from the date of the Notice to Proceed. This procurement is a total small business set-aside under NAICS code 237990 and is restricted exclusively to FY 25 MATOC contract holders for Mississippi River Levees, Construction of Levee Enlargements and Berms. Key technical requirements include adherence to 2013 ADA Standards, Davis-Bacon Act labor standards, and NIST SP 800-171 cybersecurity protocols. The scope involves demolition and structure removal, embankment work, and environmental protection features, with quality managed through a three-phase control process and daily CQC reports. Progress payments must be processed via the Resident Management System Contractor Mode. Following Amendment 0001, which revised specifications for demolition and structure removal, the proposal submission deadline has been extended to November 13, 2026, at 1400 CST.
Other Heavy and Civil Engineering Construction

POSTED

3 days ago

DEADLINE

in 15 days
View Details

Earlier notices in this NAICS code

Posted before this notice, open and closed

Find Active Opportunities Like This

Get AI-powered intelligence on the opportunities still open

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 750+ contractors already using CLEATUS