Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, October 28 at 2:00 PM ET

Register Free →

This Solicitation opportunity from Connecticut was posted on August 21, 2026. The submission period has ended. Browse the details below for market research, or find similar active opportunities.

B027-03 Merimere Dike Seepage Control

Closed
B027-03State & Local

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

Active Opportunities Like This One

NAICS: 237990
New
Federal
Construction Services for Confined Aquatic Disposal Cell Construction and Maintenance Dredging of the Providence River Federal Navigation Project, Providence, Rhode Island.
Solicitation # W912WJ27X1CUP
The U.S. Army Corps of Engineers, New England District, is seeking information from small and large businesses for a dredging project in Providence, Rhode Island, under NAICS code 237990. The project is estimated to cost between $80,000,000 and $100,000,000, with a solicitation expected around March 15, 2027. Construction is scheduled to begin in September 2027 and last approximately two years, spanning two dredging seasons from September 1, 2027, to August 31, 2029. The work is divided into two primary sequences: the construction of a new Confined Aquatic Disposal (CAD) cell at Edgewood Shoals North, including an access channel, and the subsequent maintenance dredging of the Providence River and Harbor Federal Navigation Project to a depth of -40 feet MLLW plus two feet of allowable overdepth. The total scope involves mechanically dredging approximately 5,500,000 cubic yards of material using closed clamshell buckets. Specifically, 3,200,000 cubic yards will be removed to create the CAD cell, with material placed at Port Edgewood Basin, Fox Point Reach CAD cells, Prudence Island, and the Rhode Island Sound Disposal Site. The remaining 2,300,000 cubic yards of maintenance material will be placed within the newly constructed Edgewood Shoals North CAD cell. To meet strict environmental windows and project timelines, the contractor must maintain a production rate of at least 300,000 cubic yards every 30 calendar days, operating 24 hours a day, 7 days a week. Interested firms must submit a capabilities package by November 26, 2026, demonstrating experience with these production rates and open water placement in New England during winter months.
W2SD Endist New England

POSTED

about 3 hours ago

DEADLINE

in about 1 month

AI Contract Overview

Show more

Solicitation B027-03 is for the Merimere Dike Seepage Control project in Meriden, Connecticut, managed by the City of Meriden. The scope of work involves subsurface pressure injection grouting under and around the existing Merimere Dike, including site preparation, the removal of pavement from Reservoir Road, the execution of cement and chemical grouting as directed by the engineer, and full site restoration to preconstruction conditions. The project is supported by a geotechnical data report from AECOM and detailed engineering drawings. Bids must be submitted electronically via the City eProcurement portal by October 6, 2026, at 11:00 am. Funded by the Environmental Protection Agency as part of a larger 3.24 million dollar drinking water infrastructure improvement grant, the contract is subject to strict federal and state regulations. Key requirements include compliance with the Davis-Bacon Act and Connecticut prevailing wage laws, as well as Build America, Buy America and American Iron and Steel mandates. Contractors must provide a bid bond for 10 percent of the bid amount, along with performance and payment bonds equal to the contract price. Additionally, the contract mandates comprehensive insurance coverage, including general liability, professional liability, and workers compensation, and requires adherence to EPA signage specifications and federal non-discrimination and environmental laws. Award decisions will be based on the best interest of the City, with a preference for Connecticut-based bidders in the event of a tie.

General Info

Merimere Dike seepage control grouting project in Meriden, CT; bids due October 6, 2026.

Place of Performance

CT, USA

Set-Aside

NONE

Documents

17

B027-03 Merimere Dike Seepage Control

PDF, High priority: read this firstitb
High

B027-03 Merimere Dike Seepage Control

PDF, High priority: read this firstitb
High

B027-03 Merimere Dike Seepage Control IFB

PDF, High priority: read this firstifb
High

B027-03 Merimere Dike Seepage Control Invitation to Bid

PDF, High priority: read this first18 pages · ifb
High

B027-03 Prevailing Wage Rates

PDF, High priority: read this first10 pages · wage-determination
High

Merimere Dike Seepage Control Drawings (Apr 2026)

PDF, High priority: read this first4 pages · specifications
High

Merimere Dike Supplemental Conditions - Insurance Requirements (Aug 2026)

PDF, High priority: read this first5 pages · sow
High

Prevailing Wage Information Packet - CT Public Works Safety and Wage Law

PDF, High priority: read this first25 pages · wage-determination
High

Professional Services Agreement - City of Meriden 2025

PDF, High priority: read this first5 pages · contract-document
High

Sample Payment Bond Document

PDF, High priority: read this first2 pages · payment-bond
High

School Insurance Requirements

PDF, High priority: read this first1 page · insurance-requirements
High

B027-03 Merimere Dike Seepage Control Agreement

PDF, Medium priority6 pages · contract-document
Medium

EJCDC C-700 Standard General Conditions of the Construction Contract

PDF, Low priority90 pages · contract-document
Low

Grant Award No. 00A02002 – Merimere Drinking Water Infrastructure Improvements

PDF, Low priority23 pages · award
Low

Merimere Dike Seepage Mitigation Geotechnical Data Report

PDF, Low priorityother
Low

Sample Performance Bond

PDF, Low priority2 pages · performance-bond
Low

Signage Required Term and Condition

PDF, Low priority1 page · contract-document
Low

AI Contract Breakdown

Uniform Contract Format

Sign up to view the full breakdown with detailed analysis of each section.

Timeline

1 update
PhaseClosed
Posted

Solicitation

Deadline changed

Response deadline changed from Oct 6, 2026 to Oct 13, 2026.

Response Deadline

Deadline has passed

Submission Closed

Find active opportunities like this

Get full access to discover similar active contracts, track opportunities, and build proposals with AI assistance.

Organization & Contact Information

Show more
AgencyConnecticut → Water
Contacts2 people available
OfficeMeriden, CT, 06450, USA
Organization / AgencyConnecticut → Water
Office AddressMeriden, CT, 06450, USA
Contacts
Susan MartelContract Specialist
Rawle DummettProcurement

Interested Companies (28)

ConstructconnectCincinnati, OH
Avery ConstructionSomers, CT
TradeMark ContractorsBristol, CT

See All 28 Interested Companies

Get full access to view all interested companies, their contact details, and full contractor profiles.

Get full access

Full Description

Show more
This project includes subsurface pressure injection grouting at Merimere Dike, Reservoir Road in Meriden, Connecticut. Work includes providing all supervision, labor, materials, equipment and incidentals necessary for site preparation prior to the grouting program, subsurface pressure injection grouting under and/or around the existing Merimere Dike, and restoration of the site to preconstruction conditions following completion of the grouting program. This contract will be funded by the Environmental Protection Agency, thus Federal Labor Standards Provisions, including the prevailing wage requirements of the Davis-Bacon and Related Acts will be enforced as applicable.

Earlier notices in this NAICS code

Posted before this notice, open and closed

Find Active Opportunities Like This

Get AI-powered intelligence on the opportunities still open

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 750+ contractors already using CLEATUS