Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, October 28 at 2:00 PM ET

Register Free →

This Sources Sought opportunity from Department Of Defense was posted on December 7, 2023. The submission period has ended. Browse the details below for market research, or find similar active opportunities.

B200 Construction Project - Fort Smith Arkansas

Closed
PANSWD24P000088Federal

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

Active Opportunities Like This One

NAICS: 236220
New
Construction of the Recharge Master Plan Update Basin Improvements Project Montclair Basin Improvements
Solicitation # construction-recharge-master-plan-update-basin-improvements-project-montclair-basin-improvements-2
The Construction of the Recharge Master Plan Update Basin Improvements Project Montclair Basin Improvements is a solicitation issued by RT Contractor Corp for a project under the Inland Empire Utilities Agency in California. This opportunity, categorized under NAICS code 236220, specifically calls for bids from Disadvantaged Business Enterprise (DBE) subcontractors. The solicitation was posted on October 20, 2026, with a response deadline of November 4, 2026. The project area for subcontracting opportunities is identified as Riverside or Los Angeles. Compliance with strict Disadvantaged Business Enterprise requirements is mandatory to secure project financing, and failure to meet these standards will result in a bid being deemed non-responsive. Bidders must demonstrate Good Faith Efforts (GFE), including proof of posting solicitations in an online publication for 30 consecutive calendar days and in a print newspaper for at least one day prior to the bid opening. Additionally, bidders must provide proof of utilizing the Small Business Administration and the Minority Business Development Agency within their bid package. While outreach documentation may be submitted up to three business days after the bid closing, the publicity and agency assistance proofs must be included at the time of submission.
RT CONTRACTOR CORP

POSTED

about 6 hours ago

DEADLINE

in 14 days
NAICS: 236220
New
P084 NEXT GENERATION TORPEDO INTEGRATION LAB & P1016 Consolidated RDT&E Systems Facility – Newport, RI
Solicitation # p084-next-generation-torpedo-integration-lab-p1016-consolidated-rdte-systems-facility-newport-ri
J&J Contractors, Inc. is soliciting bids for the construction of the Next Generation Torpedo Integration Lab and the P1016 Consolidated RDT&E Systems Facility in Newport, Rhode Island. The primary project involves a 12,920 square foot multi-story steel frame laboratory and office facility featuring a shallow foundation, metal standing seam roof, and masonry and metal panel exterior walls. This scope encompasses comprehensive site preparations, including landscaping, parking, exterior lighting, telecommunications, and the installation of underground stormwater retention and utility systems. An additional option for the P1016 facility includes a 17,978 square foot laboratory with similar structural specifications and the demolition of an existing 548 square meter engineering facility. The solicitation is open to various small business designations, including SDB, WOSB, HUBZone, and VOSB. Bidders must adhere to Davis Bacon Wage Rates, and the project is exempt from sales tax. Pricing is requested across a wide array of trades, including demolition, abatement, structural steel, mechanical, electrical, plumbing, and fire protection, among others. Interested parties must contact the primary point of contact to receive the formal bid invitation and documents via Building Connected before the response deadline of November 30, 2026.
J&J CONTRACTORS, INC.

POSTED

about 6 hours ago

DEADLINE

in about 1 month
NAICS: 236220
New
CITY OF GREENFIELD WASTEWATER TREATMENT PLANT UPGRADE PROJECT
Solicitation # city-greenfield-wastewater-treatment-plant-upgrade-project
The City of Greenfield Wastewater Treatment Plant Upgrade Project involves the construction of an upgraded 2.0 million gallons per day wastewater treatment plant located at 41901 Walnut Avenue in Greenfield, California. The project, managed by C. Overaa & Co., has a total duration of 915 calendar days and is divided into four distinct phases: site preparation including soil stabilization and facility relocation; construction of a packaged Membrane Bioreactor treatment plant, headworks, UV disinfection, and SCADA systems; decommissioning and demolition of existing facilities; and the completion of finish facilities including the Walnut Avenue extension for water and sewer services. A critical requirement of the project is maintaining the existing plant in service during the first two phases while ensuring compliance with General Order/NOA standards. This solicitation is open to small businesses, including certified veteran, women, and disadvantaged business enterprises, with a specific local hiring goal requiring 50 percent of the construction workforce to be residents of Monterey, San Benito, or Santa Cruz counties. Subcontractors must utilize the Textura electronic invoicing system and are responsible for associated service fees. Bids are due by November 10, 2026, following a mandatory pre-bid meeting held on October 5, 2026. Award acceptance is conditioned upon the subcontractor's full agreement to Overaa standard terms, including potential 100 percent performance and labor bonds and specific workers compensation insurance waiver of subrogation endorsements.
C. Overaa & Co.

POSTED

about 6 hours ago

DEADLINE

in 20 days
NAICS: 236220
New
P1102 Weapons Magazine and Ordnance Operations Facility, Naval Submarine Base New London, Groton, Connecticut
Solicitation # p1102-weapons-magazine-ordnance-operations-facility-naval-submarine-base-new-london-groton
J & J Contractors, Inc. is soliciting bids for the P1102 Weapons Magazine and Ordnance Operations Facility project at the Naval Submarine Base New London in Groton, Connecticut. This comprehensive construction project has a duration of 1828 calendar days and involves the creation of six Containerized Long Weapons Storage units, two Box G magazines, and one Box H earth-covered high-explosive magazine. The scope includes the construction of an Ordnance Operations building, a Truck Inspection facility, and a Sentry building, alongside the demolition of 18 existing magazines and two other buildings. Technical requirements encompass a wide range of trades, including demolition, abatement, structural steel, electrical, plumbing, and mechanical work. Key site features include rigid inclusions, load transfer mats, grounding and lightning protection, intrusion detection systems, and extensive site preparation involving rock excavation and wetland mitigation. The project also requires the installation of primary and secondary electrical distribution, telecommunications infrastructure, access roads, and landscaping. This opportunity is set aside for various small business categories, and interested parties must contact Rahul Maheshwari to receive bid documents before the October 31, 2026 deadline.
J & J Contractors, Inc

POSTED

about 6 hours ago

DEADLINE

in 10 days
NAICS: 236220
New
SLED
Colville Fuels, Coyote Ridge Golf Course, Secondary Emergency Exit from Clubhouse Basement
Solicitation # Request-for-Bid-Coyote-Ridge-Golf-Course-Secondary-Emergency-Exit-from-Clubhouse-Basement.pdf
Colville Fuels LLC is soliciting bids for the construction of a code-compliant secondary emergency exit from the clubhouse basement at Coyote Ridge Golf Course in Washington. The scope of work includes saw cutting reinforced concrete walls, installing a commercial-grade exterior door assembly with panic hardware, and excavating a permanent ADA-accessible egress path with required drainage, retaining walls, and handrails. The contractor must ensure all work is code-compliant, coordinate inspections with the Authority Having Jurisdiction, and restore all affected surfaces to match existing clubhouse architecture. This is a price-based invitation for bids where the award will be granted to the lowest responsive and qualified bidder, subject to budgetary limits and Indian preference requirements. Preference is tiered from 100% Colville Business Enterprises down to non-certified Indian-owned businesses, with allowable price differentials based on the total bid amount. Bidders must submit a firm fixed price bid, a performance schedule, a subcontracting plan, and evidence of financial stability, insurance, and licensing by November 20, 2026. The project is expected to be completed by March 31, 2026, though this date is weather-dependent. Final contract terms and payment conditions will be negotiated upon the selection of the successful bidder.
Confederated Tribes of the Colville Reservation

POSTED

about 7 hours ago

DEADLINE

in about 1 month
NAICS: 236220
New
SLED
ADA Improvements for Patterson Park and MPD
Solicitation # 1914.02
The City of Murfreesboro is soliciting sealed bids for solicitation number 1914.02, which entails construction upgrades for the Police Headquarters Vestibule and ADA improvements for the Patterson Park Recreation Center Entry. The project is based on AIA Documents A101 and A201 (2017) and requires the contractor to provide high-grade workmanship, including cutting, patching, and the restoration of disturbed structures. Bidders must be licensed General Contractors in the State of Tennessee and registered through the OpenGov procurement portal. The contract will be awarded to the lowest responsive and responsible bidder based on the sum of the base bid and any accepted alternates, with evaluation criteria focusing on experience, financial ability, reputation, and past work history with the owner. Submission requirements include a lump sum base bid, a 5% contingency allowance, and a bid security equal to 5% of the bid, which must be uploaded electronically and delivered physically to the Purchasing Department. The successful contractor must provide performance and payment bonds totaling 100% of the contract sum. Key deliverables include a construction schedule submitted within 21 days of award, various certificates of occupancy and inspection, and specific documentation such as AIA Forms G706, G706A, and G707. The contractor is responsible for quality control and must adhere to strict packaging and marking standards for hardware and wiring, as well as specific waste management and labeling protocols. Payment is processed via Applications for Payment, which must be accompanied by an updated Construction CPM Schedule and a schedule of values.
Facilities

POSTED

about 7 hours ago

DEADLINE

in 23 days

General Info

NAICS

236220 - Commercial and Institutional Building Construction

Place of Performance

Fort Smith, AR, 72903, USA

Set-Aside

NONE

Documents

0

No documents available

Documents will appear here when they are available.

AI Contract Breakdown

Uniform Contract Format

No documents to break down

The breakdown needs solicitation documents. None were found from this contract's source.

Timeline

1 update
PhaseClosed
Posted

Sources Sought

Notice updated

The notice title changed.

Response Deadline

Deadline has passed

Submission Closed

Find active opportunities like this

Start your free trial to discover similar active contracts, track opportunities, and build proposals with AI assistance.

Organization & Contact Information

Show more
AgencyDepartment Of Defense → W076 Endist Ft Worth
Contacts2 people available
OfficeFORT WORTH, TX, 76102-6124, USA
Office AddressFORT WORTH, TX, 76102-6124, USA

Full Description

Show more
This is a SOURCES SOUGHT for market research purposes for information only, to be used for preliminary planning purposes. THIS IS NOT A SOLICITATION FOR PROPOSALS AND NO CONTRACT WILL BE AWARDED FROM THIS SYNOPSIS. No reimbursement will be made for any costs associated with providing information in response to this synopsis or any follow up information requests. Respondents will not be notified of the results of the evaluation. The U.S. Army Corps of Engineers - Fort Worth District has been tasked to solicit for and award a project to renovate and convert an approximately 61,000 SF hangar for F-16/F-35 use at Ebbing NGB, Fort Smith Arkansas. Anticipated project will be a competitive, firm-fixed price, two phase design build contract procured in accordance with FAR 15, Negotiated Procurement using - Best Value trade- off process. The purpose of this synopsis is to gain knowledge of interest, capabilities, and qualifications of all members of industry, to include the Small and Large Business Community. Small Businesses include the 8(a) Program, Historically Underutilized Business Zones (HUBZone), Woman Owned Small Business (WOSB) and Service-Disabled Veteran- Owned Small Business (SDVOSB). All are highly encouraged to respond to ensure there is adequate competition. Project Scope: Building 200, an approximately 61,000 SF hanger, is in need of renovation, repair and abatement. Work will consist of: updating to current codes and standards to include ADA compliance, Roof repair, abate known asbestos, lead paint, and mastic, conversion of the existing PFOS/PFOA fire system to a water deluge system, and repair security systems to current requirements. In accordance with DFARS Part 236, the Magnitude of construction: $25,000,000 to $100,000,000; The Estimated duration of the project is 720 calendar days. The North American Industry Classification System code for this procurement is 236220 which has a small business size standard of $45 Million, with the product and Service Code Y1BZ, Construction of Other Airfield Structures. Small Businesses are reminded under FAR 52.219-14, Limitations on Subcontracting. Firm will not pay more than 85% of the amount paid by the Government to the prime's subcontractors that are not similarly situated. Any work that a similarly situated entity further subcontracts will count toward the 85% subcontract amount that cannot be exceeded. Cost of materials are excluded and not considered to be subcontracted. Should this action be solicited as Full and Open Competition, a Small Business Participation Proposal will be identified as an evaluation factor in the solicitation. Large Business(es) must comply with FAR 52.219-9 by submitting an acceptable Small Business Subcontracting Plan to be eligible for award. Prior Government contract work is not required for submitting a response under this source sought synopsis. However, all construction performance must be in compliance with the USACE Safety and Health Requirements Manual, (EM 385- 1-1), and must also comply with all Federal, State and local laws, ordinances, codes and/or regulations. Anticipated solicitation issuance date is in or about June 2024, and the estimated proposal due date will be in or about September 2024. The official Synopsis citing the solicitation number will be issued via SAM.GOV website at https://sam.gov and inviting firms to register electronically to receive a copy of the solicitation when it is issued. Firms responding to this Sources Sought shall answers the 8 questions below. If answer is Not Applicable, type in the letters NA. 1. Firm's name, address, point of contact, phone number, E-MAIL address, and UEI Number. 2. Firm's interest in proposing on the solicitation. 3. Firm's Business Size - LB, SB, 8(a), HUBZone, SDVOSB, WOSB. 4. Firm's Joint Ventures (existing), including Mentor Protege and teaming arrangement information, if applicable. 5. Firm's Bonding Capability (construction bonding level per contract, expressed in dollars). 6. Company's experience with two phase design build type contracts. 7. Company's experience with projects that have a similar scope as described above by providing a brief description of the projects including customer names and phone numbers, contract numbers (if applicable), and dollar values of the projects. 8. Company's capability to perform a contract that has a similar magnitude and complexity by providing a brief description of at least (3) projects including customer names and phone numbers, contract numbers (if applicable) and dollar values of the projects. This announcement and all information will be issued via the Government Point of Entry, Procurement Integrated Enterprise Environment (PIEE) and Offerors must be active in System for Award Management (SAM) to be eligible for award of Government contracts, including documenting Sec. 889 Compliance in SAM that include FAR 52.204-24 and FAR 52.204-25. Contracting will verify the 889(a) and (b) compliance - per FAR 52.204-26. Proposals cannot be submitted via PIEE (or accepted by alternate means) until the SAM registration is complete. NIST GUIDANCE: Please NOTE this solicitation will require offerors to enter a National Institute of Standards and Technology (NIST) score in the Supplier Performance Risk System (SPRS) prior to award of this solicitation. SPRS is the Department of Defense, single, authorized application to retrieve supplier performance information. SPRS is a web-enabled enterprise application that gathers, processes, and displays data about the performance of suppliers and must be completed prior to an award in accordance with DFARS 204.7303(b)(1)), DFARS 204.7304(e), DFARS 252.204-7020) and (DoDI 5000.79). This requirement became effective 23 March 2023. Interested Firm's shall respond to this Sources Sought no later than 2:00 P.M.(Central Daylight Savings Time), 22 December 2023. Email your response to Contract Specialist, Joseph Spear at EMAIL joseph.g.spear@usace.army.mil with a courtesy copy to the Contracting Officer, Nicholas Johnston at EMAIL Nicholas.I.Johnston@usace.army.mil. EMAIL is the ONLY METHOD to submit your answers to this sources sought.

More opportunities from Department Of Defense → W076 Endist Ft Worth

Same awarding agency

NAICS: 236220
New
Federal
SPECIAL NOTICE: Akeroyd Blood Donor Center - Joint Base San Antonio - VIRTUAL INDUSTRY DAY
Solicitation # PANSWD-26-P-0000031412
The U.S. Army Corps of Engineers Fort Worth District, in support of the Defense Health Agency, is planning the construction of the Akeroyd Blood Donor Center at Joint Base San Antonio, Fort Sam Houston, Texas. This project will be executed as a Progressive Design-Build (PDB) effort under Other Transaction Authority (OTA) pursuant to 10 U.S.C. 2808a, meaning it is not subject to the Federal Acquisition Regulation. The scope involves the creation of a 15,750 gross square foot facility designed to support 60 to 80 daily blood donations, featuring specialized areas for reception, screening, donation, recovery, processing, testing, shipping, and administration. Key technical requirements include the installation of a 750-kW generator for critical systems and a design that maintains separate flows for visitors and staff. The project has a programmed amount of 39.5 million dollars, with a construction cost limitation of approximately 33.97 million dollars and a proposed performance period of 730 calendar days from the notice to proceed. The acquisition strategy utilizes a streamlined, two-step competitive selection process focused on a holistic, most qualified best-value assessment rather than the lowest price. First, interested firms must submit a qualifications-based white paper detailing corporate experience with similar integrated acquisition strategies, key personnel qualifications, and an understanding of the PDB process. Up to three finalists will then be invited to mandatory one-on-one pitch meetings to evaluate their collaborative capabilities, technical expertise, and agility in problem-solving. To be eligible, offerors must maintain active registration in SAM.gov, possess a Unique Entity Identifier, and provide confirmation of their status as a Non-Traditional Defense Contractor. The official solicitation is anticipated for release in December 2026, with a target contract award date in June 2027.
Commercial and Institutional Building Construction

POSTED

1 day ago

DEADLINE

in 7 days
View Details
NAICS: 237990
New
Federal
Joe Pool Dam Slide Repairs
Solicitation # W9126G26BA010
Solicitation W9126G26BA010 is a competitive 100% Total Small Business Set-Aside for firm-fixed-price civil works construction services to repair four shallow slides (Slides 18, 20, 21, and 28) on the upstream and downstream dam embankment slopes at Joe Pool Lake in Grand Prairie and Dallas, Texas. The scope of work includes removing slide debris, excavating slide areas with bench-cutting and keyway installation, lime-treating and compacting soil to restore design contours, and performing final surface restoration using riprap on upstream slopes and topsoil with vegetation on downstream slopes. The project is structured with a base bid for Slide 21 and two options: Option 1 for Slides 18 and 28, and Option 2 for Slide 20. The contract will be awarded to the responsible bidder providing the lowest responsive Total Evaluated Price, which is the sum of the base CLIN and all option CLINs. Bidders must submit their offers electronically via the Procurement Integrated Enterprise Environment (PIEE) by October 27, 2026. Mandatory requirements include SAM registration, a bid guarantee, and the provision of performance and payment bonds. The contractor must comply with Davis-Bacon Act prevailing wage requirements, MIL-STD-129 marking standards, and NIST SP 800-171 cybersecurity assessments. Inspection and acceptance will occur at the work site, with payment processed electronically through Wide Area WorkFlow.
Other Heavy and Civil Engineering Construction

POSTED

6 days ago

DEADLINE

in 7 days
View Details

Find Active Opportunities Like This

Get AI-powered intelligence on the opportunities still open

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 750+ contractors already using CLEATUS