Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, September 16 at 2:00 PM EDT

Register Free →

Badge Printer Supply and Integration

Active
Federal

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

General Info

Agency

Department Of Defense → FA2823 Aftc PzioView Agency

NAICS

423420 - Office Equipment Merchant WholesalersView NAICS

Place of Performance

0, FL, USA

Set-Aside

SBA

Documents

This scope was carved out of FA282326Q3007.

The full solicitation package (2 documents), including the RFP, is on the prime solicitation, not on this scope.

View the prime solicitation

AA/ACS LENEL REPLACEMENT

AI Contract Breakdown

Uniform Contract Format

No contract breakdown available.

Cannot generate Contract Breakdown because no documents were found from this contract's source.

Timeline

Posted

subcontract

Response Deadline

Submission deadline

Response Deadline

Ready to pursue this opportunity?

Start your free trial to track this contract, build proposals with AI assistance, and manage your pipeline.

Organization & Contact Information

Show more
AgencyDepartment Of Defense → FA2823 Aftc Pzio
ContactsNo contacts available
OfficeN/A
Organization / Agency
Department Of Defense → FA2823 Aftc Pzio
View Agency Profile
Office AddressN/A
ContactsNo contact information available

Full Description

Show more
Supplies and installs operational badge printing systems for prime contractors on 388 EWS Eglin Air Force Base projects. Provides badge printers without integrated cameras and configures the hardware for direct integration with the Lenel ACS. Delivers an operational and integrated badge printer.

Similar Contracts

Same NAICS industry code

More opportunities from Department Of Defense → FA2823 Aftc Pzio

Same awarding agency

NAICS: 561210
New
Federal
A / D West Gate Chapel Mold Sanitation
Solicitation # FA282326Q0083
Solicitation FA282326Q0083 is a firm-fixed-price contract set aside for small businesses to provide mold remediation and sanitation services at the West Gate Chapel (Building 2574) located at Eglin Air Force Base, Florida. The scope of work requires the cleaning and sanitization of 31 prefabricated fan coil units, including internal coils and associated duct systems and vents, to eliminate microbial growth. Additionally, the contractor must treat all visible mold on walls, wooden objects, and cabinets within 10 feet of air handlers and vents, and clean the sanctuary carpets using an EPA-approved anti-microbial agent. The period of performance is scheduled from September 25, 2026, to October 30, 2026. The government will award the contract based on the Lowest Price Technically Acceptable (LPTA) method, evaluating proposals on an acceptable or unacceptable basis regarding their compliance with the Statement of Work. Key administrative requirements include adherence to Wage Determination 2015-4531 for Okaloosa County, Florida, and the use of the Wide Area WorkFlow (WAWF) system for electronic invoicing. Contractor personnel must comply with strict base access and security protocols, including background checks and vehicle insurance requirements. The solicitation was amended on August 26, 2026, to incorporate Service Contract Labor Standards under FAR 52.222-41.
Facilities Support Services

POSTED

1 day ago

DEADLINE

in 5 days
View Details
NAICS: 561621
New
Federal
AA/ACS LENEL REPLACEMENT
Solicitation # FA282326Q3007
Solicitation FA282326Q3007 is a total small business set-aside for a firm-fixed-price delivery order to replace the end-of-life Access Control System (ACS) in Building 351 at Eglin Air Force Base, Florida. The scope of work includes upgrading the workstation from a laptop to a high-performance desktop, installing the latest Lenel OnGuard software and licensing, and replacing the Room 109 card reader with a dual PIN and CAC-capable HID Prox reader. Additionally, the contractor must integrate the existing main entry reader into a new standalone ACS panel, provide and configure a badge printer, and perform all necessary database programming and system validation testing. The project is estimated to be completed within 45 to 60 calendar days from the date of award, with a kickoff meeting scheduled within seven days of award. All work must be performed during standard duty hours. Award will be based on the lowest priced technically acceptable (LPTA) basis, with technical acceptability and risk assessments, including DFARS provision 252.204.7024, serving as pass/fail gates. Final government acceptance requires the submission of signed system test reports and closeout documentation. A site visit is scheduled for September 8, 2026, requiring personnel to provide identification and contact details by September 4, 2026, and adhere to REAL ID requirements for base access.
Security Systems Services (except Locksmiths)

POSTED

2 days ago

DEADLINE

in 8 days
View Details
NAICS: 238210
New
Federal
Bldg. 696, Network Wiring Upgrade (LAN Drops)
Solicitation # FA282326Q0084
The Air Force Test Center, Operational Contracting Division at Eglin Air Force Base, is soliciting quotations for a firm-fixed-price contract to perform a network wiring upgrade at Building 696. This project involves the engineering, furnishing, installation, and testing of 166 NIPR drops on the first floor of the south end of the building, including CAT6A data cabling, patch panels, and associated telecommunications room work. The acquisition is a 100 percent small business set-aside under NAICS code 238210, with a size standard of 19.0 million dollars. The period of performance is 120 calendar days after award, and all deliverables are provided FOB Destination. Award will be granted to the responsible offeror providing the lowest-priced, technically acceptable solution. Technical evaluations are based on a strict acceptable or unacceptable basis regarding the Performance Work Statement and 96th Communications Squadron Cyber Infrastructure Standards. Key requirements include the use of BICSI Registered Cabling Installers at the technician level and adherence to ANSI/TIA, NEC, and UFC standards. Offerors must submit their quotations electronically via the PIEE Solicitation Module by September 17, 2026, including their business size status, UEI, CAGE code, and a detailed list of proposed products with part numbers and quantities. Final acceptance is contingent upon the submission of copper to fiber test reports and as-built drawings, verified by the 96 CS/SCXP Project Manager.
Electrical Contractors and Other Wiring Installation Contractors

POSTED

3 days ago

DEADLINE

in 14 days
View Details
NAICS: 333112
Federal
15' HEAVY DUTY FLEX WING ROTARY CUTTER
Solicitation # FA282326Q0068
The Air Force Test Center, Operational Contracting Division at Eglin Air Force Base, Florida, is issuing Request for Quotations FA282326Q0068 for the procurement of one 15 foot heavy duty flex wing rotary cutter with 540 RPM. This is a 100 percent small business set-aside under NAICS code 333112, with a size standard of 1500 employees. The contract will be executed as a firm-fixed-price agreement, and the government will award the contract to the responsible offeror providing the lowest-priced, technically acceptable solution. Technical acceptability is based on strict adherence to the salient characteristics dated 28 April 2026, which include specific requirements for cutting dimensions, gearbox ratings, and safety chains. The period of performance is 60 calendar days after award, with delivery terms set as FOB Destination, meaning the contractor is responsible for all shipping and handling costs. While funding is not currently available, the government anticipates an award no later than 1 October 2026. Quotations must be submitted by 12:00 PM Central Standard Time on 10 September 2026 and must include the company's UEI and CAGE code, completed representations and certifications, and a statement of agreement with all solicitation terms. Invoicing and payment will be processed electronically through the Wide Area Workflow system.
Lawn and Garden Tractor and Home Lawn and Garden Equipment Manufacturing

POSTED

8 days ago

DEADLINE

in 7 days
View Details