Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, October 14 at 2:00 PM EDT

Register Free →

Big Morongo Boardwalk Repairs Project

Active
State & Local

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

General Info

Agency

California → Regional Water Quality Control Board, Region 7 - Colorado River Basin, Palm Desert

Place of Performance

CA, 92256

Set-Aside

NONE

Documents

0

No documents available

Documents will appear here when they are available.

AI Contract Breakdown

Uniform Contract Format

Sign up to view the full breakdown with detailed analysis of each section.

Timeline

Posted

forecast

Ready to pursue this opportunity?

Start your free trial to track this contract, build proposals with AI assistance, and manage your pipeline.

Organization & Contact Information

Show more
AgencyCalifornia → Regional Water Quality Control Board, Region 7 - Colorado River Basin, Palm Desert
Contacts2 people available
OfficeN/A
Organization / Agency
California → Regional Water Quality Control Board, Region 7 - Colorado River Basin, Palm Desert
Office AddressN/A
Contacts
Logan RaubSenior Environmental Scientist
Ali IbrahimProject Manager

Full Description

Show more
The project includes maintenance, repair, and replacement of existing facilities along approximately five (5) miles of a public pedestrian trail consisting of raised boardwalk and earthen segments. Work will occur within Big Morongo Creek at five (5) locations resulting in temporary impacts to the stream channel. Vegetation removal, excavation, and minor grading will be completed with hand tools and materials will be transported using power wheelbarrows. No activities are planned to occur outside the existing boardwalk footprint.

Similar Contracts

Same NAICS industry code

NAICS: 237990
New
International
Lytton First Nation – Berm Construction
Solicitation # 24-3028C
Solicitation 24-3028C is for the construction of the Nohomeen Recovery Berm located at the Stein Subdivision in Stryen, Lytton, British Columbia, for the Lytton First Nation. The project involves significant earthworks and the installation of a retaining wall using lock block facing units with a minimum 28-day concrete strength of 20 MPa and a specific batter of 5 degrees. Key technical requirements include the use of Type I Engineered Fill and retained backfill, both compacted to 100 percent of the maximum density per ASTM D698 standards. The scope also includes the installation of 150mm perforated PVC toe and heel drains, vertical cleanouts, rodent guards, and a clear crush chimney drain, with NILEX 4545 non-woven geotextile required at soil interfaces. The project mandates strict environmental and cultural compliance, requiring adherence to Thompson-NOXLAND Regional District Bylaws and Department of Fisheries and Oceans Land Development Guidelines. Contractors must install silt fencing prior to excavation and ensure all soil removal is conducted by a company employing a qualified cultural assist. Quality assurance is managed through the Geotechnical Engineer of Record, who must approve the subgrade and wall bearing surface before wall construction begins. Additionally, the contractor is responsible for verifying wall batter every block course and limiting the use of heavy equipment to a minimum distance of 0.75 meters from the wall face. Responses to this solicitation are due by October 22, 2026.
Lytton First Nation

POSTED

3 days ago

DEADLINE

in 17 days
View Details
NAICS: 237990
New
SLED
Contract 26-2 Furnace Creek Tank Painting
Solicitation # Contract 26-2
The Womelsdorf-Robesonia Joint Authority is soliciting sealed bids for Contract 26-2, which involves the interior and exterior painting of the Furnace Creek Tank, a 1,500,000-gallon welded steel ground water storage tank measuring 68 feet in diameter and 56 feet in height. The scope of work includes foundation joint and crack repair, incidental weld repairs, and coordination with the contractor awarded Contract 26-1 for metals rehabilitation. All work must be completed within 150 days from the Notice to Proceed and is subject to oversight by a retained third-party paint inspector. Bids must be submitted electronically via the PennBid program by 2:00 PM on October 21, 2026, and must include a bid bond or certified check for 10 percent of the bid price along with required financial statements, experience records, and various certifications. This project is funded through a Penn VEST Drinking Water State Revolving Fund loan and must comply with all associated loan requirements. It is strictly subject to the Build America, Buy America Act and the Federal Consolidated Appropriations Act, requiring that all iron, steel, manufactured products, and construction materials be produced in the United States. Additionally, the contract mandates adherence to Davis-Bacon Wage Rates and requires specific certifications regarding non-discrimination, equal employment opportunity, and contractor eligibility. The Authority reserves the right to award the contract to the bidder deemed to have provided the most advantageous bid.
Berks County

POSTED

3 days ago

DEADLINE

in 16 days
View Details
NAICS: 237990
New
SLED
2026-0011
Solicitation # 48935
The Cornerstone of Centerville South Phase I Public Improvements project is a civil and electrical construction solicitation issued by the City of Centerville, Ohio, with an engineer's estimate of $4,973,490.39. The scope of work includes the installation of conduits, structures, concrete drive aprons with curbs, seeding, mulching, and a design-build electrical component. The electrical portion requires the contractor to design and build the electrical service and associated conductors, including the installation of 22 decorative light fixtures, light pole bases, and specific connector kits. All work must adhere to the Ohio Building Code, N.E.C., N.F.P.A. Standard 70, and ODOT specifications, with a project completion date set for September 30, 2027. Bids are submitted as unit price proposals via Bid Express, with a final response deadline of October 13, 2026. The selection process evaluates the lowest and best bid based on project history, available resources, financial ability, and compliance with federal, state, and local laws, including Ohio Prevailing Wage and OSHA regulations. Required financial securities include a bid bond for the full amount of the bid or a 10 percent certified check, and a 100 percent performance bond upon award. Insurance requirements specify minimum coverage of $2,000,000 for Commercial General Liability, $1,000,000 for Auto, and $1,000,000 for Workers Compensation. Contract administration is managed by Oberer Construction Managers Ltd. on behalf of the City.
City of Centerville

POSTED

3 days ago

DEADLINE

in 8 days
View Details

Ready to Pursue This Opportunity?

Get AI-powered intelligence on this solicitation and the ones like it

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 750+ contractors already using CLEATUS