Stevens Creek Bank Erosion & Outfall Repairs, Whisman Park Reach

Active
State & Local

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

AI Contract Overview

Show more

The project addresses severe bank erosion and failed storm drain outfalls along approximately 700 linear feet of Stevens Creek near Whisman Park in Mountain View, California, about 2.5 miles upstream of San Francisco Bay. Erosion caused by the 2022/2023 winter season has created near-vertical 15-foot-high scarps within 8 to 10 feet of the Stevens Creek Trail, a paved pedestrian pathway separating the creek from State Highway 85, posing a direct risk to trail integrity and public access. Additional deterioration threatens the Hetch Hetchy Trail pedestrian bridge and could lead to its closure. The work will focus on three distinct areas containing four erosion zones and two failed storm drain outfalls, each requiring tailored stabilization measures. Construction will include installing planted and non-planted log-crib structures, compacted soil slopes covered with biodegradable fabric, and two buried storm drain culvert downdrains designed to discharge onto rock-filled log-crib faces. Work Area 1 involves stabilizing an exposed sakrete slope armor that is compromising a concrete downdrain, while Work Area 2 addresses erosion that has encroached into a gravel maintenance road within the Santa Clara Valley Water District easement. Work Area 3 targets critical erosion that has retreated to within eight feet of the trail and four feet of the pedestrian bridge abutment, while also reinforcing a downstream storm drain failure. The effort aims to protect infrastructure, preserve public access, and prevent further environmental degradation along this sensitive stretch of the creek.

General Info

Stabilize 700 feet of eroding Stevens Creek bank, repair storm drain outfalls, protect trail and bridge from collapse.

Agency

California → Regional Water Quality Control Board, Region 2 - San Francisco Bay, Oakland

Place of Performance

Mountain View, CA

Set-Aside

NONE

Documents

0

No documents available

Documents will appear here when they are available.

AI Contract Breakdown

Uniform Contract Format

No documents to break down

The breakdown needs solicitation documents. None were found from this contract's source.

Timeline

Posted

forecast

Ready to pursue this opportunity?

Start your free trial to track this contract, build proposals with AI assistance, and manage your pipeline.

Organization & Contact Information

Show more
AgencyCalifornia → Regional Water Quality Control Board, Region 2 - San Francisco Bay, Oakland
Contacts1 person available
OfficeN/A
Organization / Agency
California → Regional Water Quality Control Board, Region 2 - San Francisco Bay, Oakland
Office AddressN/A
Contacts
Nathaniel GoetzWater Resource Control Engineer

Full Description

Show more
The Project is located at Stevens Creek (Creek) near Whisman Park and about 2.5 miles upstream of San Francisco Bay in Mountain View, Santa Clara County (Lat. 37.40095; Long. -122.06939). Project work will involve bank stabilization and outfall repairs from erosion that occurred at three areas along approximately 700 linear feet (LF) of the Creek during the 2022/2023 Winter season. The bank erosion caused a near-vertical 15-ft-high scarp within about 8-10 horizontal feet from the edge of a paved pedestrian pathway along Stevens Creek Trail (Trail), which separates the Creek from State Highway 85 to the west. Additional bank erosion could result in damage and public access closure to both the Trail and/or the Hetch Hetchy Trail pedestrian bridge. The Project will install planted and non-planted log-crib structures, planted biodegradable fabric-covered compacted soil slopes, and two buried storm drain culvert downdrains discharging onto rock-filled log-crib structure faces. Project work will be implemented at three work areas that include four bank erosion areas and two failed storm drain outfall areas. Work Area 1 is experiencing ongoing severe bank erosion (Bank Erosion Area 1) and features an exposed section of existing sakrete slope armor along the Creek bank, which is undermining the structural integrity of an existing cast-in-place steel-reinforced concrete downdrain (Bank Erosion Area 2 and Failed Storm Drain Outfall 1). Work Area 2 has severe bank erosion (Bank Erosion Area 3) that includes retreatment of the Creek top of bank into the existing gravel maintenance access road within the Santa Clara Valley Water District (SCVWD) easement. At Work Area 3, severe bank erosion (Bank Erosion Area 4) has retreated the Creek top of bank to within eight feet from the Trail and four feet from the pedestrian bridge abutment and is undermining a downstream storm drain outfall (Failed Storm Drain Outfall 2).

Similar Contracts

Same NAICS industry code

NAICS: 237990
New
Federal
Maintenance Dredging of the Isle au Haut Thoroughfare near Isle au Haut, Maine
Solicitation # W912WJ27BA003
Solicitation W912WJ27BA003 is a sealed bidding procurement issued by the Department of Defense, W2SD Endist New England, for the maintenance and advance maintenance dredging of the Isle au Haut Thoroughfare Federal Navigation Project in Maine. The project requires the mechanical removal of approximately 3,355 cubic yards of highly compacted coarse sand, gravel, cobbles, and small boulders to achieve a depth of -7 feet Mean Lower Low Water, with an allowable overdepth of one foot. All dredged material is to be transported and placed at the Flake Island Disposal Site to enhance juvenile lobster and cod habitats. To protect benthic resources and federally managed species, dredging and disposal activities are restricted to an environmental window between September 15, 2026, and March 1, 2027. This is a total small business set-aside under NAICS code 237990, with the contract awarded to the lowest responsive and responsible bidder. Key performance requirements include maintaining a minimum production rate of 4,000 cubic yards every 30 calendar days and submitting a project schedule within five days of the Notice to Proceed. The contractor must implement a comprehensive quality control system compliant with FAR 52.246-12 and host a partnering session within 45 days of award. Submissions must be made electronically via the Procurement Integrity Enterprise Environment portal by November 2, 2026. Compliance with NIST SP 800-171 cybersecurity standards and various federal security and labor regulations is mandatory.
W2SD Endist New England

POSTED

about 9 hours ago

DEADLINE

in 28 days
View Details
NAICS: 237990
New
International
Lytton First Nation – Berm Construction
Solicitation # 24-3028C
Solicitation 24-3028C is for the construction of the Nohomeen Recovery Berm located at the Stein Subdivision in Stryen, Lytton, British Columbia, for the Lytton First Nation. The project involves significant earthworks and the installation of a retaining wall using lock block facing units with a minimum 28-day concrete strength of 20 MPa and a specific batter of 5 degrees. Key technical requirements include the use of Type I Engineered Fill and retained backfill, both compacted to 100 percent of the maximum density per ASTM D698 standards. The scope also includes the installation of 150mm perforated PVC toe and heel drains, vertical cleanouts, rodent guards, and a clear crush chimney drain, with NILEX 4545 non-woven geotextile required at soil interfaces. The project mandates strict environmental and cultural compliance, requiring adherence to Thompson-NOXLAND Regional District Bylaws and Department of Fisheries and Oceans Land Development Guidelines. Contractors must install silt fencing prior to excavation and ensure all soil removal is conducted by a company employing a qualified cultural assist. Quality assurance is managed through the Geotechnical Engineer of Record, who must approve the subgrade and wall bearing surface before wall construction begins. Additionally, the contractor is responsible for verifying wall batter every block course and limiting the use of heavy equipment to a minimum distance of 0.75 meters from the wall face. Responses to this solicitation are due by October 22, 2026.
Lytton First Nation

POSTED

3 days ago

DEADLINE

in 17 days
View Details
NAICS: 237990
New
SLED
Pinto Lake Dock Replacement Project
Solicitation # PK-26-09064-QB
The Pinto Lake Dock Replacement Project, solicitation PK-26-09064-QB, is a purchase order agreement issued by the City of Watsonville Parks and Community Services Department. The project involves the demolition of approximately 235 linear feet of damaged dock panels and the installation of a new, fully functional EZ Dock floating dock system, including gangway components, piling brackets, edging, cleats, and bumpers. The contractor is responsible for all mobilization, site preparation, and the legal disposal of all removed materials. Work must be completed within 15 working days of the Notice to Proceed, with an engineer's estimate valued at 170,000.00 dollars. The contract will be awarded to the lowest responsible bidder based on the total of all lump sum line items. Qualified vendors must be licensed under California Contractor License Law, registered with the Department of Industrial Relations, and possess a City of Watsonville Business License. Bidders must submit their proposals electronically via the OpenGov Procurement portal by November 2, 2026. Key requirements include compliance with Santa Cruz County prevailing wage rates, the provision of construction performance and payment bonds, and adherence to SOBA and ADA guidelines for handrails. Final payment is contingent upon a final inspection and formal acceptance by the City Clerk.
Parks & Community Services

POSTED

3 days ago

DEADLINE

in 28 days
View Details
NAICS: 237990
New
SLED
Contract 26-2 Furnace Creek Tank Painting
Solicitation # Contract 26-2
The Womelsdorf-Robesonia Joint Authority is soliciting sealed bids for Contract 26-2, which involves the interior and exterior painting of the Furnace Creek Tank, a 1,500,000-gallon welded steel ground water storage tank measuring 68 feet in diameter and 56 feet in height. The scope of work includes foundation joint and crack repair, incidental weld repairs, and coordination with the contractor awarded Contract 26-1 for metals rehabilitation. All work must be completed within 150 days from the Notice to Proceed and is subject to oversight by a retained third-party paint inspector. Bids must be submitted electronically via the PennBid program by 2:00 PM on October 21, 2026, and must include a bid bond or certified check for 10 percent of the bid price along with required financial statements, experience records, and various certifications. This project is funded through a Penn VEST Drinking Water State Revolving Fund loan and must comply with all associated loan requirements. It is strictly subject to the Build America, Buy America Act and the Federal Consolidated Appropriations Act, requiring that all iron, steel, manufactured products, and construction materials be produced in the United States. Additionally, the contract mandates adherence to Davis-Bacon Wage Rates and requires specific certifications regarding non-discrimination, equal employment opportunity, and contractor eligibility. The Authority reserves the right to award the contract to the bidder deemed to have provided the most advantageous bid.
Berks County

POSTED

3 days ago

DEADLINE

in 16 days
View Details
NAICS: 237990
New
SLED
2026-0011
Solicitation # 48935
The Cornerstone of Centerville South Phase I Public Improvements project is a civil and electrical construction solicitation issued by the City of Centerville, Ohio, with an engineer's estimate of $4,973,490.39. The scope of work includes the installation of conduits, structures, concrete drive aprons with curbs, seeding, mulching, and a design-build electrical component. The electrical portion requires the contractor to design and build the electrical service and associated conductors, including the installation of 22 decorative light fixtures, light pole bases, and specific connector kits. All work must adhere to the Ohio Building Code, N.E.C., N.F.P.A. Standard 70, and ODOT specifications, with a project completion date set for September 30, 2027. Bids are submitted as unit price proposals via Bid Express, with a final response deadline of October 13, 2026. The selection process evaluates the lowest and best bid based on project history, available resources, financial ability, and compliance with federal, state, and local laws, including Ohio Prevailing Wage and OSHA regulations. Required financial securities include a bid bond for the full amount of the bid or a 10 percent certified check, and a 100 percent performance bond upon award. Insurance requirements specify minimum coverage of $2,000,000 for Commercial General Liability, $1,000,000 for Auto, and $1,000,000 for Workers Compensation. Contract administration is managed by Oberer Construction Managers Ltd. on behalf of the City.
City of Centerville

POSTED

3 days ago

DEADLINE

in 8 days
View Details

Ready to Pursue This Opportunity?

Get AI-powered intelligence on this solicitation and the ones like it

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 750+ contractors already using CLEATUS