Elk River Waste Water Treatment Plant Outfall Repair

Active
State & Local

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

AI Contract Overview

Show more

The Elk River Waste Water Treatment Plant Outfall Repair project, identified by solicitation number ED-25-12, involves critical maintenance and structural repairs to the outfall pipe diffuser section located in Humboldt Bay. Managed by the City of Eureka, the project focuses on replacing 90 existing neoprene flap-style check valves with 3-inch elastomeric Tideflex check valves to prevent sand, sediment, and shell from entering the diffuser pipe. Additional scope includes the removal of accumulated sediment within the pipe, the replacement of one nut and restraining bolt on the diffuser, and the repair of a 6-inch-wide area of spalling using underwater concrete epoxy. The work will be performed at a depth of 10 to 25 feet below Mean Lower Low Water Level along the 360-foot diffuser section nearest the terminus. All construction activities are strictly regulated to minimize environmental impact and must be conducted by divers using hand tools only. The use of heavy construction equipment, pile driving, dredging, or mechanized excavation is explicitly prohibited. The project is scheduled for execution during the Summer-Fall 2026 window and must be timed to avoid periods of anadromous fish passage and heavy waterfowl use in the bay. This project has received a California Environmental Quality Act Notice of Exemption, as it is classified as routine maintenance that does not involve an expansion of use and is not expected to result in significant environmental impacts.

General Info

City of Eureka project to repair outfall pipe diffusers in Humboldt Bay by 2026.

Agency

California → City of Eureka

NAICS

237990 - Other Heavy and Civil Engineering ConstructionView NAICS

Place of Performance

Hilfiker Lane, Eureka, CA, 95501

Set-Aside

NONE

Documents

(1)

NOE - Elk River WWTP Outfall Repair CEQA Notice of Exemption

PDFceqa-notice-of-exemption

AI Contract Breakdown

Uniform Contract Format

Sign up to view the full breakdown with detailed analysis of each section.

Timeline

Posted

forecast

Ready to pursue this opportunity?

Start your free trial to track this contract, build proposals with AI assistance, and manage your pipeline.

Organization & Contact Information

Show more
AgencyCalifornia → City of Eureka
Contacts1 person available
OfficeN/A
Organization / Agency
California → City of Eureka
Office AddressN/A
Contacts
Henry BakerAssistant Planner

Full Description

Show more
The project involves maintenance and repairs to the outfall pipe at the Elk River W\/S/TP. The outfall pipe runs west from the W\/VTP and discharges into Humboldt Bay. An underwater inspection identified necessary maintenance and repairs for the continued operation of the outfall. Maintenance and repairs will occur at the diffuser section of the outfall pipe. The diffuser section has 90 3-inch ports spaced every 4 feet with neoprene flap style check valves that function to prevent sediment intrusion into the pipe. The primary focus of the repairs is the replacement of 90 existing check valves. These valves are past their useful life span and no longer function properly. As a result, sand, sediment and shell have entered the diffuser pipe from the bay. Sediment that has entered the diffuser pipe will be removed during the replacement of the port valves. The neoprene flap style valves will be replaced with 3-inch elastomeric Tideflex check valves that will prevent sediment from entering the diffuser pipe during low flows. In addition to the port valve replacement, one nut and restraining bolt on the diffuser pipe will be replaced, and one 6-inch-wide area of spalling will be repaired with underwater concrete epoxy. Project work will be conducted during the Summer-Fall 2026 and scheduled to avoid periods of anadromous fish passage or heavy waterfowl use.

Similar Contracts

Same NAICS industry code

NAICS: 237990
New
Haleiwa Small Boat Harbor Maintenance Dredging and Revetted Mole Repair
Solicitation # W9128A26BA002
Solicitation W9128A26BA002 is a firm-fixed-price contract issued by the U.S. Army Corps of Engineers Honolulu District for maintenance dredging and revetted mole repair at the Haleiwa Small Boat Harbor in Oahu, Hawaii. The project scope includes mobilization and demobilization, the dredging and ocean disposal of approximately 4,260 cubic yards of material to an approved offshore site south of Oahu, and the repair of the revetted mole involving stone rework, vegetation removal, and the installation of best management practices. The estimated contract value ranges from 1 million to 5 million dollars, with a performance period of 200 calendar days from the receipt of the notice to proceed. This opportunity is set aside for HUBZone small businesses, who receive a 10 percent price evaluation preference. Key requirements include the provision of performance and payment bonds, adherence to the Davis-Bacon Act, and the appointment of key personnel including a Project Manager, Project Superintendent, Quality Control System Manager, and Site Safety and Health Officer. Acceptance of the dredging work is based on multi-beam hydrographic survey data, while stone revetment is subject to visual inspection for defects. Bids must be submitted as sealed physical offers by September 30, 2026, as electronic submissions are not permitted. Liquidated damages for delays are set at 2,297 dollars per calendar day.
Healy Tibbitts Builders, Inc.

POSTED

about 12 hours ago

DEADLINE

in 7 days
View Details
NAICS: 237990
New
SLED
WWRF Recycled Water Pond Erosion Prevention Project
Solicitation # W-335
The WWRF Recycled Water Pond Erosion Prevention Project, solicitation W-335, is a construction contract issued by the Western Municipal Water District for erosion control and slope stabilization at the Western Water Recycling Facility in Perris, California. The scope of work involves establishing a 2:1 slope configuration using riprap-filled HDPE bags and loose riprap, installing drainage improvements such as V-ditches and drop inlets, and installing railing along the Recycled Water Storage Pond and concrete-lined basin. The project is estimated at 1,500,000 dollars with a completion timeframe of 240 calendar days from the date of the Notice to Proceed. The contract will be awarded to the lowest responsive and responsible bidder. Bidders must submit their proposals electronically via the PlanetBids Procurement Portal by October 15, 2026, at 2:00 PM. Required submission documents include the complete bid forms package, bid bonds, a non-collusion declaration, a list of proposed subcontractors, and a certified data sheet for materials. The successful contractor must provide performance and payment bonds each equal to 100 percent of the bid amount and comply with California prevailing wage laws and Department of Industrial Relations registration requirements. Technical execution must adhere to the Greenbook standards, and the contractor is required to provide a written work plan and construction schedule.
Western Municipal Water District

POSTED

1 day ago

DEADLINE

in 23 days
View Details

Ready to Pursue This Opportunity?

Get AI-powered intelligence on this solicitation and the ones like it

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 750+ contractors already using CLEATUS