Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, November 11 at 2:00 PM ET

Register Free →

This Sources Sought opportunity from Department Of Defense was posted on May 1, 2025. The submission period has ended. Browse the details below for market research, or find similar active opportunities.

Bonneville Power House 1 Site Prep & Trashrack Replacement

Closed
W9127N25R0020Federal

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

Active Opportunities Like This One

NAICS: 237990
New
SLED
Agricultural INNOVATION Farm Project for San Marcos Unified SD
Solicitation # 2026-21
The San Marcos Unified School District is soliciting bids for the Agricultural INNOVATION Farm Project (Solicitation 2026-21) located at 99 Cassou Rd, San Marcos, California. The project scope involves the demolition of an abandoned electrical pole, water pump, and fencing, followed by the installation of underground water and electrical utilities, irrigation lines, a gravel service road, shade structures, storage containers, arbors, and designated planting areas. Work must be performed in strict accordance with the technical specifications, project drawings, and soil report. The estimated period of performance begins December 1, 2026, with a required completion date of April 1, 2027. The contract will be awarded to the lowest responsible bidder. Qualified bidders must hold a valid California Contractor's License and be registered with the California Department of Industrial Relations (DIR), as the project is subject to prevailing wage requirements. Submission requirements include a bid bond for 10 percent of the contract amount, a non-collusion declaration, and references, all submitted via the OpenGov e-procurement portal by November 2, 2026. The successful contractor must provide performance and payment bonds equal to 100 percent of the contract value and adhere to a 3 percent Disabled Veteran Business Enterprise (DVBE) participation goal. All materials must be delivered in original packaging and comply with UL 969 marking and labeling standards.
Curriculum and Instruction

POSTED

about 11 hours ago

DEADLINE

in 5 days
NAICS: 237990
New
SLED
Water Treatment Plant Maintenance Package ‘A’ Degasifier Package (Project No. 25-4261A)
Solicitation # IFB-395-26-JM
The City of Hollywood, Florida, is soliciting bids for the Water Treatment Plant Maintenance Package A Degasifier Package (Project No. 25-4261A). The scope of work involves the replacement of packing media in three degasifiers (units 2, 3, and 4) at the Water Treatment Plant located at 3441 Hollywood Boulevard. Key deliverables include power washing the vessels, replacing media support grids and differential pressure gauges, performing vessel disinfection, and resealing access doors. To ensure continuous plant operation, the contractor must work on only one unit at a time. The project requires a contractor with a project manager possessing at least five years of experience and a track record of at least five similar degasifier servicing projects, as well as the provision of a factory-trained service technician for performance testing. Bids must be submitted electronically via the OpenGov portal by November 4, 2026, at 3:00 PM. The contract will be awarded to the lowest responsive and responsible bidder. Financial requirements include a bid guarantee of 5 percent of the bid amount and the provision of performance and payment bonds. Comprehensive insurance coverage is mandated, including general liability, pollution liability, and vehicle liability, with the City of Hollywood named as an additional insured. The project timeline specifies substantial completion within 180 days and final completion within 210 days, with liquidated damages set at 500 dollars per day. Additionally, the contractor must comply with federal prevailing wage requirements for Broward County and provide a twelve-month warranty against poor workmanship and faulty materials.
Public Utilities

POSTED

about 13 hours ago

DEADLINE

in 20 days

General Info

NAICS

237990 - Other Heavy and Civil Engineering Construction

Place of Performance

Cascade Locks, OR, USA

Set-Aside

NONE

Documents

2

Bonneville Lock and Dam First Powerhouse Trash Rack Replacement Plans

PDF, High priority: read this firstspecifications
High

Bonneville Powerhouse 1 – 2025 Bathymetry Images

DOCX, High priority: read this first3 pages · specifications
High

AI Contract Breakdown

Uniform Contract Format

Contract not broken down yet

CLEATUS splits the solicitation into Uniform Contract Format (UCF) sections: scope, pricing, deliverables, and evaluation criteria.

Timeline

PhaseClosed
Posted

Sources Sought

Response Deadline

Deadline has passed

Submission Closed

Find active opportunities like this

Get full access to discover similar active contracts, track opportunities, and build proposals with AI assistance.

Organization & Contact Information

Show more
AgencyDepartment Of Defense → W071 Endist Portland
Contacts2 people available
OfficePORTLAND, OR, 97204-3495, USA
Office AddressPORTLAND, OR, 97204-3495, USA

Full Description

Show more
General. This is a SOURCES SOUGHT and is for informational/market research purposes only. THIS IS NOT A REQUEST FOR PROPOSAL, QUOTATION OR BID, NOR A SYNOPSIS OF A PROPOSED CONTRACT ACTION UNDER FAR SUBPART 5.2. This Sources Sought is to gain knowledge of the interest, capabilities, and qualifications of industry so the government can make informed business decisions. We are seeking responses from both large and small business members of industry to include: Small Business, Small Disadvantaged Businesses to include 8(a) firms, Historically Underutilized Business Zones (HUBZone), Woman-Owned Small Business (WOSB) to include Economically Disadvantaged Women-Owned Small Business (EDWOSB), Service-Disabled Veteran-Owned Small business (SDVOSB) and Veteran Owned Small Business (VOSB). All interested parties are highly encouraged to respond. Reponses to this Sources Sought announcement will be used by the Government to make business decisions and to inform potential future solicitations. The North American Industrial Classification Code (NAICS) for this requirement is: 237990, Other Heavy and Civil Engineering Construction The related size standard is: $45 million. Formal Sources Sought Response Due - 15 May 2025 at 3:00 pm Pacific Time. 1. Project Background. Bonneville's 1st Powerhouse has 10 main units and one station service unit requiring new intake trash racks. Each main unit consist of three slots. Each slot has six racks - one bottom and five top racks. The station service unit has one top rack, four intermediate racks and one bottom rack. All main unit trash racks are similar in design. The existing Bonneville Powerhouse I trash racks were originally installed in 1937 and are now 80 years old. As part of annual maintenance, these trash racks are cleaned and inspected, except the lower racks which are left in place to prevent debris from entering the units. The last time the lower trash racks were removed and inspected was 1983. 2. Project Scope. a. The following information represents the project objectives: i. Pre-site survey. ii. Fabrication and installation of 162 - 22'-1 1/4" long, 1'-7 1/2" wide x 12' tall new trash racks. iii. Removal and disposal of 174 existing trash racks. Disposal of an additional 29 existing trash racks that are being stored onsite. iv. Debris removal or debris relocation (brush, tree trunks, etc.), and relocation of sediment to ensure successful installation of the trashracks. The volume of debris and sediment is approximately 800 cubic yards total in a 20 ft by 1000 ft area, down to a -2 EL., at an approximate water depth of 70 feet. i. This large volume is assumed necessary so that the area stays clear long enough for the trashrack installation work to occur. This volume could be reduced if schedule sequencing is in such a way that the trashrack removal/installation can follow quickly behind the debris removal/relocation. ii. Debris includes 12"-24" diameter trees. There are some 36" diameter trees that cross multiple units. iii. Debris in front of the units ranges 1-15 feet. v. Debris removal/relocation behind existing trashracks, as necessary, to install the new trashracks. i. The trashracks spacing is 6 on center. vi. Installation of 162 new trash racks and 12 additional trash racks that are already onsite. NOTE: USACE would greatly appreciate input from industry on the best means of clearing the debris and sediment to allow for access to the track racks for replacement. Several options have been discussed, including: 1. Removing all debris and sediment from the water and disposing of in accordance with all federal, state, and local laws. 2. Removing only debris and move sediment upstream from the face of the dam, leaving it in the water. 3. Moving the debris and sediment upstream from the face of the dam, leaving it in water. b. Anticipated Construction Schedule: CENWP intends to advertise (09-2025) and award (11-2025) a Construction Contract with estimated construction completion by the end of calendar year 2027. c. Estimated Construction Cost (ECC): The current ECC is between $10,000,000 and $25,000,000. Ref. FAR 36.204 Disclosure of Magnitude and DFARS 236.204 Disclosure of Magnitude. d. Number and Type of Contracts: NWP contemplates awarding one (1) Firm-Fixed Price Construction contract. Maximum Small business participation is being sought at both the Prime and subcontracting levels. e. Anticipated Source Selection Process: The expected method to determine the best value to the government is Invitation for Bid. 3. Project Specific Constraints and Challenges: a. Debris removal and divers are only allowed during the In-Water-Work (IWW) window, December 1 - February 28. Removal and installation of the trashracks can occur outside of the IWW. This needs to be carefully coordinated as debris may need to be removed behind the trashracks for successful installation of the trashracks. b. It is assumed that debris removed from the river would need to be tested for environmental compliance prior to disposal. c. When a boat or barge is in the water, assume all units are out of service. d. Any diving, at any time of the year, requires at least three main units (unit being dove on and each immediate adjacent unit), including the ITS gates, to be secured & locked-out/tagged-out during dive operations. Depending upon the time of year, river flows and levels have dictated that additional main units may need to be secured and locked-out/tagged-out to ensure the dive location is not only safe but efficient for the divers to work in. e. The operating project will provide the gantry crane and operation of gantry crane for installation and removal of the main unit trashracks. The contractor will be required additional mobile crane (90 ton possibly) for station service trashrack installation and other purposes. f. The existing trash rack paint is likely contains lead. The Contractor is responsible to perform lead abatement or to dispose in an approved site. 4. Questions for Industry: a. Is there anything in our SOW that would discourage you from bidding? b. Is there anything in our SOW that would cause enhanced pricing uncertainty? c. Are there any concerns with schedule or project specific constraints? d. Are there any market conditions or industry practices that you feel the government needs to be aware of? e. What are the best means of clearing the debris and sediment to allow for access to the track racks for replacement? f. What kind of equipment and methodology would be used to move/remove the sediment and debris? g. What would be the approximate cost difference of removing debris versus moving debris upstream? h. What construction sequence would be utilized for this work? i. Approximately how long will it take to fabricate 162 trashracks? j. Space onsite is limited. Is it cost prohibitive to store the 162 trashracks off-site prior to installation? k. Is there interest amongst contractors to perform the scope of work under one contract or would the trashrack scope and debris scope need to be separate contracts? 5. Submission Instructions. Formal responses to this Sources Sought notice must be submitted electronically (via email) with SUBJECT: Sources Sought - Bonneville Powerhouse 1 Trash Rack Replacement. Please email to Brandon Lasich, Contracting Officer, at contact@example.gov and Ian Lutjens, Contracting Specialist, contact@example.gov, before response due date. Interested parties responses to this Sources Sought shall be limited to six (6) pages and shall include the following information: a. Firm's name, address, point of contact, phone number, e-mail address, CAGE and Unique Entity ID. b. Firm's business category and size: Large Business (include summary of small business participation metrics), Small Business, Small Disadvantaged Businesses to include 8(a) firms, Historically Underutilized Business Zones (HUBZone), Woman-Owned Small Business (WOSB) to include Economically Disadvantaged Women-Owned Small Business (EDWOSB), Service-Disabled Veteran-Owned Small business (SDVOSB) and at the subcontracting level, Veteran Owned Small Business (VOSB). c. An explanation of the prime firm's capabilities, special qualifications/certifications and equipment and describe the work to be self-performed as it pertains to the proposed work outlined in the Project Scope. d. A description of work performed under similar project constraints and challenges listed under paragraph 3. e. Project Examples (for Joint Ventures, please include projects completed by the Joint Venture if available): - To be considered for a potential set aside strategy, provide a maximum of three (3), minimum of one (1) similar project(s). These project examples must be similar in size, scope and complexity to the work described in paragraph 3 of this notice, with a description of each project (to include pertinent qualitative and quantitative information about featured scope elements), and include the following: Project Title Contract Number Contract award date Customer name, phone number and email address Prime or Subcontractor Initial contract dollar value Final contract dollar value Initial contract completion date Final contract completion date Customer satisfaction The Government may verify information in CPARS or PPIRS. f. Firm's Joint Venture information if applicable - existing and potential. g. Firm's Bonding Capability in the form of a letter from Surety. h. Firm's interest and the likelihood in bidding on the solicitation when it is issued. (Refer to planned advertise and performance dates) i. Responses to the government's questions in paragraph 5 and any other information the contractor feels the government needs to be aware of. 6. Disclaimer and Important Notes. a. This notice does not obligate the Government to award a contract. No reimbursement will be made for any costs associated with providing information in response to this Sources Sought or any follow up information. The Government reserves the right to use information provided by respondents for any purpose deemed necessary and legally appropriate. Any organization responding to this notice should ensure that its response is complete and sufficiently detailed to allow the Government to determine the organization's capabilities to perform the work. Respondents are advised that the Government is under no obligation to acknowledge receipt of the information received or to provide feedback to respondents with respect to any information submitted. b. All interested firms must be registered in the System for Award Management (SAM) at https://www.sam.gov to have size status considered. You must remain current for the duration of the source selection process to be eligible for award of a Government contract. 7. Attachments: a. Draft Plans b. Bonneville Powerhouse 1 - 2025 Bathymetry Images c. Bathymetric data can be made available upon request. d. Dive video showing the debris in the vicinity of the trashracks can be made available upon request.

More opportunities from Department Of Defense → W071 Endist Portland

Same awarding agency

NAICS: 237990
New
Federal
JOHN DAY DAM NAVIGATION LOCK TAINTER VALVE (TV) REPAIRS TV3 AND TV4
Solicitation # W9127N27BA009
The U.S. Army Corps of Engineers Portland District is soliciting firm-fixed-price bids for the repair and rehabilitation of Tainter Valves TV3 and TV4 at the John Day Lock and Dam in Klickitat County, Washington. The project scope includes crack and weld repair, seal replacement, and the procurement of spare bushings, with an estimated construction magnitude between $1,000,000 and $5,000,000. The work is categorized under NAICS 237990 and is a full and open competition. Mandatory requirements include adherence to EM 385-1-1 safety standards, CMMC Level 1 certification, and the provision of performance and payment bonds. Bidders must also comply with the Davis-Bacon Act and Buy American requirements. The solicitation includes mandatory price items for mobilization and the removal, transport, and repair of TV3, with optional line items for the same services for TV4. Evaluation will include a 10 percent price preference for HUBZone small business concerns and a review of subcontracting plans to ensure goals for small businesses and HUBZone firms are met. Bids must be submitted in PDF format to the designated contracting personnel by 11:00 A.M. PDT on November 19, 2026. Site visits were scheduled for November 3, 2026, requiring attendees to be U.S. citizens with a REAL ID. Performance is expected to begin within 10 calendar days of award, with specific completion timelines of 143 to 233 calendar days depending on the line item.
Other Heavy and Civil Engineering Construction

POSTED

7 days ago

DEADLINE

in 21 days
View Details

Earlier notices in this NAICS code

Posted before this notice, open and closed

Find Active Opportunities Like This

Get AI-powered intelligence on the opportunities still open

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 750+ contractors already using CLEATUS