Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, October 28 at 2:00 PM ET

Register Free →

This Solicitation opportunity from Department Of Commerce was posted on August 5, 2026. The submission period has ended. Browse the details below for market research, or find similar active opportunities.

Building 215 Clean Room HEPA Filter Replacement

Closed
1333ND26RNB190014Federal

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

Active Opportunities Like This One

NAICS: 236220
New
Federal
36C25627R0012_PRESOLICITATION_NOTICE_REPLACE PERIMETER SECURITY FENCE
Solicitation # 36C25627R0012
The Department of Veterans Affairs, Network Contracting Office 16, is seeking a Service-Disabled Veteran-Owned Small Business (SDVOSB) for a firm-fixed-price construction project to replace the perimeter security fence at the Veterans Health Care System of the Ozarks (VHSO) Main Campus in Fayetteville, Arkansas. The scope of work involves a turn-key operation to replace the existing perimeter fence, replace one gate, and automate gates one through eight. The project includes general construction, architectural, mechanical, electrical, and structural repairs. The estimated magnitude of construction is between 5 million and 10 million dollars, with a performance period of 365 calendar days from the Notice to Proceed. This opportunity is a 100 percent SDVOSB set-aside under the Veterans First Public Law 109-461, requiring that at least 15 percent of personnel costs be spent on employees of the prime or other eligible SDVOSB concerns. Eligible offerors must be registered in the System for Award Management (SAM) and SBA VetCert under NAICS code 236220. The solicitation will be issued as a Request for Proposals (RFP) with documents expected to be available around November 5, 2026. Requirements for submission include a bid bond, a 90-day proposal acceptance period, and the subsequent provision of performance and payment bonds upon award. Technical requirements include a certified penetrating radar survey for underground utilities and adherence to OSHA, NEC, and NFPA 70E safety standards.
256-NETWORK Contract Office 16 (36C256)

POSTED

about 3 hours ago

DEADLINE

in 15 days
NAICS: 236220
New
Federal
REQUEST FOR INFORMATION (RFI) / MARKET RESEARCH NOTICE RELATED TO SEVERAL UPCOMING PROJECTS at WRIGHT-PATTERSON AFB, OHIO
Solicitation # W912QR26_RFI_CONSOLIDATEDPROJECTS_WPAFB
The U.S. Army Corps of Engineers, supporting the U.S. Air Force, is conducting market research via a Request for Information to identify qualified industry partners for seven construction and renovation projects at Wright-Patterson Air Force Base, Ohio. These projects range in scope from the renovation of sensitive Special Access Program spaces and the construction of a 90,000 square foot research laboratory to the modernization of compressor facility systems, the decentralization of heating plants, and the repair of military dormitories. The estimated acquisition magnitudes for these individual efforts vary significantly, with the largest project valued at approximately 160 million dollars. The government intends to utilize Other Transaction Agreements and a Progressive Design-Build delivery method, which splits the work into a collaborative design and pre-construction phase followed by a construction phase based on a Guaranteed Maximum Price. Interested firms must provide detailed company profiles, evidence of cybersecurity compliance through CMMC and SPRS, and experience with complex MEP infrastructure and secure facility standards. Responses are due by November 2, 2026, and should be submitted to the primary point of contact in PDF format.
W072 Endist Louisville

POSTED

about 3 hours ago

DEADLINE

in 12 days
NAICS: 236220
New
Construction of the Recharge Master Plan Update Basin Improvements Project Montclair Basin Improvements
Solicitation # construction-recharge-master-plan-update-basin-improvements-project-montclair-basin-improvements-2
The Construction of the Recharge Master Plan Update Basin Improvements Project Montclair Basin Improvements is a solicitation issued by RT Contractor Corp for the Inland Empire Utilities Agency. This project, located in California with a specific focus on the Riverside and Los Angeles project areas, is designated as a set-aside for Disadvantaged Business Enterprises (DBE) under the Department of Transportation. The solicitation was posted on October 21, 2026, with a response deadline of November 4, 2026. A critical component of this contract is strict adherence to six Good Faith Effort (GFE) requirements designed to secure project financing and expand upon State Water Resources Control Board standards. Bidders must provide proof of publicity, including online postings for 30 consecutive days and a one-day print newspaper advertisement, as well as evidence of utilizing the Small Business Administration and Minority Business Development Agency. These specific documents must be submitted with the bid package to avoid being deemed non-responsive. Additionally, documentation of DBE outreach may be submitted up to three business days after the bid closing date. Failure to comply with these GFE mandates will result in the disqualification of the proposal.
RT CONTRACTOR CORP

POSTED

about 9 hours ago

DEADLINE

in 13 days
NAICS: 236220
New
P084 NEXT GENERATION TORPEDO INTEGRATION LAB & P1016 Consolidated RDT&E Systems Facility – Newport, RI
Solicitation # p084-next-generation-torpedo-integration-lab-p1016-consolidated-rdte-systems-facility-newport-ri
J&J Contractors, Inc. is soliciting bids for the construction of the Next Generation Torpedo Integration Lab and the P1016 Consolidated RDT&E Systems Facility in Newport, Rhode Island. The project involves the creation of a 12,920 square foot multi-story steel frame laboratory and office facility featuring a shallow foundation, metal standing seam roof, and masonry and metal panel exterior walls. Additionally, Option 1 includes a separate 17,978 square foot laboratory facility with similar structural specifications and the demolition of Building 1272T, a 548 square meter engineering facility. The scope of work encompasses comprehensive site improvements, including landscaping, parking, exterior lighting, telecommunications, and underground stormwater retention systems. Pricing is requested across a wide range of trades, including demolition, abatement, concrete, masonry, structural steel, mechanical, electrical, plumbing, and fire protection. This is an SBA set-aside solicitation for small businesses and other designated disadvantaged business categories. All work must adhere to Davis Bacon Wage Rates and is exempt from sales tax. Interested parties must contact the primary point of contact to receive the formal bid invitation and documents via Building Connected before the response deadline of November 30, 2026.
J&J CONTRACTORS, INC.

POSTED

about 9 hours ago

DEADLINE

in about 1 month
NAICS: 236220
New
CITY OF GREENFIELD WASTEWATER TREATMENT PLANT UPGRADE PROJECT
Solicitation # city-greenfield-wastewater-treatment-plant-upgrade-project
The City of Greenfield Wastewater Treatment Plant Upgrade Project involves the construction of a new 2.0 million gallons per day wastewater treatment plant located at 41901 Walnut Avenue in Greenfield, California. The project scope is divided into four distinct phases: site preparation including soil stabilization and facility relocation; construction of the plant featuring a packaged Membrane Bioreactor, headworks, UV disinfection, SCADA systems, and various support buildings; decommissioning and demolition of existing facilities; and finish facilities including the Walnut Avenue extension and a second sludge handling unit. The total duration for the project is 915 calendar days, with a critical requirement to maintain existing plant services and regulatory compliance throughout the first two phases. Managed by C. Overaa & Co., the solicitation is open to various small and disadvantaged business enterprises, including DBE, SDVOSB, and WOSB. A significant local hiring goal requires that 50 percent of the total construction workforce be residents of Monterey, San Benito, or Santa Cruz counties. Subcontractors must utilize the Textura electronic invoicing system and agree to the Overaa standard agreement without modification. Bids are due by November 10, 2026, following a mandatory pre-bid meeting held on October 5, 2026. Performance and labor bonds for 100 percent of the subcontract price may be required, and all subcontractors must provide a waiver of subrogation endorsement for workers compensation insurance.
C. Overaa & Co.

POSTED

about 9 hours ago

DEADLINE

in 19 days

AI Contract Overview

Show more

The National Institute of Standards and Technology (NIST) in Gaithersburg, Maryland, is soliciting bids from qualified small businesses for the replacement of HEPA filters in Building 215’s cleanroom, under solicitation number 1333ND26RNB190014, which is a total small business set-aside pursuant to FAR 19.5 and NAICS code 236220. The scope of work involves comprehensive cleanroom rebalancing, including the replacement of all terminal supply HEPA filters, repair or modification of exhaust and supply ductwork, installation of new exhaust air valves, rebalancing of air handling units and exhaust fans, and full recertification of the cleanroom environment to ensure proper pressurization and airflow compliance. The project requires adherence to strict technical standards such as ANSI A13.1 for labeling, FS L-P-387 for signage materials, and a two-year field-use history for all materials and equipment. Key deliverables include final air balance reports, pressure test reports with 11x17 fold-out drawings, redline drawings, calibration certificates, and a deficiency remediation report. All submittals must be properly labeled with project details, firm information, revision numbers, and specification references, and must be transmitted via an approved transmittal form. The Contractor is responsible for maintaining a daily and weekly reporting regimen, including construction logs, material delivery records, and field condition updates, and must use CPM scheduling with monthly updates, where all float belongs to the Contracting Officer. Equipment delivery schedules must be submitted within ten days of award and updated monthly or as directed by the Contracting Officer’s Representative (COR). Pre-award activities include a mandatory site visit scheduled for June 15, 2026, with registration required, and an additional site visit added via Amendment 0003 on July 27, 2026. Amendments have extended the quotation submission deadline to August 7, 2026, and the RFI submission deadline to July 29, 2026, while revising Sections L and M of the solicitation to align evaluation and instruction criteria. The COR and COTR will oversee submittal approvals, equipment schedules, comparable product requests, and final inspections, which include rechecking up to 25% of certified data points and requiring full acceptance by the A/E for all TAB reports. Contractors must comply with

General Info

NIST awards up to $5M small business contract for HEPA filter replacement and cleanroom maintenance.

NAICS

236220 - Commercial and Institutional Building Construction

Place of Performance

Gaithersburg, MD, 20899, USA

Set-Aside

SBA

Documents

29

Amendment 0001 to Solicitation 1333ND26RNB190014

PDF, High priority: read this firstamendment
High

Amendment 0002 to Solicitation 1333ND26RNB190014

PDF, High priority: read this firstamendment
High

Amendment 0003 to Solicitation 1333ND26RNB190014

PDF, High priority: read this first22 pages · amendment
High

Amendment 0004 to Solicitation 1333ND26RNB190014

PDF, High priority: read this first6 pages · amendment
High

Attachment 1 - Basis for Design Statement of Work

PDF, High priority: read this firstsow
High

Davis Bacon Wage Rates Maryland Montgomery County 2026

PDF, High priority: read this firstwage-determination
High

Davis Bacon Wage Rates - Maryland Montgomery County Building Construction 2025

PDF, High priority: read this firstwage-determination
High

Guidelines for Contractors and A-E Firms at NIST - March 11, 2024

PDF, High priority: read this firstguidelines
High

Guidelines for Contractors and A-E Firms at NIST - September 9, 2025

PDF, High priority: read this firstguidelines
High

Guidelines for OFPM Contractors and A/E Firms - NIST Site Work Safety and Procedures - Sep 9, 2025

PDF, High priority: read this first25 pages · guidelines
High

Key Personnel Resume Form

DOCX, High priority: read this firstkey-personnel-resume-form
High

Key Personnel Resume Form

DOCX, High priority: read this firstkey-personnel-resume-form
High

NIST Building 101 HVAC Replacement Specifications

PDF, High priority: read this firstspecifications
High

NIST Building 215 Cleanroom Basis of Design Report Dec 2019

PDF, High priority: read this first297 pages · basis-of-design-report
High

NIST Building 215 Cleanroom Re-Balance Phasing Plan March 2026

PDF, High priority: read this first15 pages · phasing-plan
High

NIST Building 215 Cleanroom Rebalance Specifications 19W08375

PDF, High priority: read this firstspecifications
High

NIST Building 215 Cleanroom Rebalance Specifications 19W08375

PDF, High priority: read this first306 pages · specifications
High

NIST Gaithersburg Building 215 Cleanroom Re-Balance Drawings

PDF, High priority: read this firstspecifications
High

Past Performance Questionnaire

DOC, High priority: read this firstpast-performance
High

Past Performance Questionnaire

DOC, High priority: read this firstpast-performance
High

Project Data Sheet Attachment 4

DOC, High priority: read this firstproject-data-sheet
High

RFP 1333ND24RNB190036 - Section K Representations and Certifications

PDF, High priority: read this firstrfp
High

Solicitation 1333ND26RNB190014 - B215 HEPA Filters Construction

PDF, High priority: read this firstrfp
High

Attachment 2 - Drawings

PDF, Low priorityother
Low

Attachment 8 - Project Data Sheet

DOC, Low priorityproject-data-sheet
Low

NIST Building 215 Cleanroom Rebalance Report 35% Submission Dec 2019

PDF, Low priorityreport
Low

RFI+IDs+33-36+Images_Compressed

PDF, Low priorityother
Low

Site Visit and RFI Instructions for B101 Tower HVAC Solicitation 1333ND24RNB190036

PDF, Low priorityspecial-notice
Low

Site Visit and RFI Instructions for B215 HEPA Filter Replacement

PDF, Low priorityspecial-notice
Low

AI Contract Breakdown

Uniform Contract Format

Sign up to view the full breakdown with detailed analysis of each section.

Timeline

4 updates
PhaseClosed
Posted

Presolicitation

Type Changed

Presolicitation → Solicitation

Notice updated

The notice description changed.

Notice updated

The notice description changed.

Notice updated

Response deadline changed from Jul 6, 2026 to Aug 7, 2026. The notice description changed.

Notice updated

Response deadline changed from Aug 7, 2026 to Aug 12, 2026. The notice description changed.

Response Deadline

Deadline has passed

Submission Closed

Find active opportunities like this

Start your free trial to discover similar active contracts, track opportunities, and build proposals with AI assistance.

Organization & Contact Information

Show more
AgencyDepartment Of Commerce Nist
Contacts1 person available
OfficeGAITHERSBURG, MD, 20899, USA
Organization / AgencyDepartment Of Commerce Nist
Office AddressGAITHERSBURG, MD, 20899, USA
Contacts
Richard Trent Stevens

Full Description

Show more

Amendment 0004:


The purpose of this Amendment 0004 is to:


  1. Provide government responses to RFI's (attached).
  2. Incorporate attachment "RFI IDs 33-36 Images_Compressed.  Attachment will be uploaded to SAM.gov. 
  3. Provide a copy of the 2nd site visit sign-in sheet (attached). 
  4. Extend the deadline for receipt of quotations to 1:00PM ET on August 12, 2026.


Amendment 0003:


The purpose of this Amendment 0003 is to 


  1. Extend the deadline for receipt of quotations to 1:00PM ET on August 7, 2026. 
  2. Schedule an additional site visit for prospective Quoters. The site visit is scheduled for 9:00AMET on July 27, 2026. See the attached “Information Regarding Site Visit and RFIs” for details.
  3. Extend the deadline for submission of Questions and Requests for Information (RFIs) to July 29, 2026. See the attached “Information Regarding Site Visit and RFIs” for details.
  4. Replace Sections L.1- Instructions to Offerors, and Section M.1 Basis for Award, of the solicitation. Quoters shall prepare and submit quotations in accordance with the amended instructions and evaluation criteria contained in this amendment.
  5. Make changes regarding provisions and clauses:

A copy of the Amendment has been uploaded.


END OF AMENDMENT 0003


Amendment 0002:


The purpose of this Amendment 0002 is to provide government responses to RFI's and provide a copy of the site visit sign-in sheet.  A copy of the Amendment has been uploaded.  All other terms and conditions remain unchanged.  


END OF AMENDMENT 0002



Amendment 0001:  


The solicitation documents originally posted to SAM.gov on [DATE OF ORIGINAL POSTING] were uploaded in error and do not pertain to this acquisition.


The Government has removed the incorrect documents and has uploaded the complete and correct solicitation package associated with Solicitation No. 1333ND26RNB190014.


Offerors are advised to disregard all solicitation documents posted prior to this amendment and shall rely solely upon the solicitation documents, specifications, drawings, attachments, and other information provided with this amendment and any subsequent amendments.


END OF AMENDMENT 0001



The National Institute of Standards and Technology (NIST) located in Gaithersburg, MD is requesting proposals from qualified Small Businesses to be evaluated and considered for award of the project titled "Buidling 215 Clean Room HEPA Filter Replacement". See attached documents for details.



A pre-proposal site visit is scheduled for Monday, June 15, 2026, at 9am EST. All attendees must be registered in advance of the site visit. See attachment titled "Information regarding Site Visit and RFI's" for details.



In accordance with FAR 19.502-10, if this small business set-aside acquisition is not awarded, the unilateral determination to set the acquisition aside shall be automatically dissolved for the unawarded portion of the set-aside.

More opportunities from Department Of Commerce Nist

Same awarding agency

NAICS: 236210
New
Federal
Building 215 Clean Room HEPA Filter Replacement
Solicitation # RFI-195000-26-00181
The National Institute of Standards and Technology is conducting market research through a Request for Information for the Building 215 Advanced Measurement Laboratory cleanroom repair and HEPA filter replacement project in Gaithersburg, Maryland. This initiative follows a previous solicitation that failed to produce an acceptable offer, prompting NIST to reassess its acquisition strategy and seek industry feedback on constructability, cost, and schedule feasibility. The project scope involves the modernization of an 1,800 square meter facility, including the replacement of approximately 1,200 HEPA filters, 70 VAV terminal units, and 54 airflow monitoring devices, as well as the installation of 32 exhaust air control valves and associated ductwork repairs, testing, and recertification. A critical component of the project is the proposed phasing plan, which aims to minimize research disruptions by utilizing 19 construction phases, including 18 critical cleanroom outage phases. Each critical outage is currently envisioned as a nine-day window starting Friday evening and requiring 24/7 operations to achieve ready-for-re-occupancy by the following Monday morning. NIST is specifically requesting rough-order-of-magnitude cost estimates and industry input on whether this aggressive outage schedule is realistic or if it creates prohibitive risks and costs. Responses, including company experience and recommendations for improving competition and project execution, are due by October 14, 2026.
Industrial Building Construction

POSTED

2 days ago

DEADLINE

in 12 days
View Details

Find Active Opportunities Like This

Get AI-powered intelligence on the opportunities still open

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 750+ contractors already using CLEATUS