Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, September 16 at 2:00 PM EDT

Register Free →

C -- A-E SERVICES

Active
PRF3M3C17065A2Federal

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

AI Contract Overview

Show more

This contract involves architect-engineering services for commercial and industrial projects at Pope Air Force Base in North Carolina. The scope includes Title I-A investigative services, Title I-B design and production services for project execution, and Title II construction supervision, inspection, contractor submittal reviews, and as-built drawing preparation. It is structured as an Indefinite Delivery Indefinite Quantity contract with a base year plus three one-year options, each not exceeding $750,000 annually, with a guaranteed minimum of $5,000 in the base year. Delivery orders will be issued as projects arise, with none exceeding $499,000, and funding will be provided at issuance. Typical work covers lighting and power systems, HVAC, minor construction, maintenance and repair of grounds and infrastructure including roofing, airfield pavement repairs, and utilities alteration. The evaluation of proposals emphasizes professional qualifications of key personnel who must be licensed or certified in their fields, including architecture, multiple engineering disciplines, industrial hygiene, and sustainable development, with particular attention to fire protection engineering credentials. The selection criteria prioritize specialized experience, technical competence, past performance based on quality and schedule adherence, and a comprehensive work management plan detailing team organization, quality control, cost control, and handling of multiple concurrent tasks. Proximity to Pope AFB and capability to manage multiple delivery orders are also significant factors, along with technical proficiency in AutoCAD and recent Department of Defense project volume. Submissions must include detailed resumes and supporting documentation following the SF 330 format. The contract is unrestricted, may result in multiple awards, and has an estimated award date of November 1, 2007.

General Info

Architect-engineering services for Pope AFB projects; IDIQ contract; licensed personnel; focuses on design, supervision, inspections.

Agency

Department Of Defense → FA4488 43 Cons LgcView Agency

NAICS

541310 - Architectural ServicesView NAICS

Place of Performance

1443 Reilly Road, Suite C, Pope AFB, NC, 28308-2896, USA

Set-Aside

NONE

Documents

(0)

No documents available

AI Contract Breakdown

Uniform Contract Format

No contract breakdown available.

Cannot generate Contract Breakdown because no documents were found from this contract's source.

Timeline

PhasePresolicitation
Posted

Presolicitation

Ready to pursue this opportunity?

Start your free trial to track this contract, build proposals with AI assistance, and manage your pipeline.

Organization & Contact Information

Show more
AgencyDepartment Of Defense → FA4488 43 Cons Lgc
Contacts2 people available
OfficePOPE ARMY AF, NC, 28308-2896, USA
Organization / Agency
Department Of Defense → FA4488 43 Cons Lgc
View Agency Profile
Office AddressPOPE ARMY AF, NC, 28308-2896, USA
Contacts
Laura A. MataContracting Officer
Jonathan WrightCommander

Full Description

Show more
Architect-Engineering (A-E) services for commercial and industrial type activities at Pope Air Force Base, NC, to include, but not limited to, the following types of services: (1) Title I-A investigative services including research and presentation of information required for project design, (2) Title I-B design services including design and production analyses, plans and specifications, and other documents required for design project execution, and (3) Title II services including supervision and inspection of construction, review of contractor submittals, and preparation of as-built drawings. The resulting Indefinite Delivery Indefinite Quantity (IDIQ) contract will be for a base year plus three one-year option periods, will not exceed $750,000 for any one year or option period, and will have a guaranteed minimum of $5,000 applicable to the base year only. As projects are identified, they will be accomplished by issuance of a delivery order against the IDIQ contract. No individual delivery order fee may exceed $499,000. Individual Delivery Orders will be funded at the time of execution and issuance. Typical work for this IDIQ contract includes, but is not limited to, (1) Lighting and power distribution systems, (2) Heating, Ventilation and Air Conditioning (HVAC) systems, (3) Minor construction, (4) Maintenance, alteration and repair of grounds, roads, buildings and structures including roof repair and roof replacement with standing seam metal roofing materials, (5) Airfield pavement repairs including asphalt and concrete, and (6) Alteration/repair of miscellaneous services and utilities. The evaluation factors are listed in descending order of importance with the most important factor listed first. Factors 1-5 are significantly more important than 6-7 which are more important than 8. The evaluation factors are: FACTOR 1 - PROFESSIONAL QUALIFICATIONS NECESSARY FOR SATISFACTORY PERFORMANCE OF REQUIRED SERVICES - Offeror shall submit resumes for all key personnel. The following key personnel are required to be professionally licensed, registered and/or certified in their appropriate disciplines: Architect, civil engineer, mechanical engineer, electrical engineer, fire protection engineer, geotechnical engineer, land surveyor, industrial hygienist, and sustainable development personnel. The following key personnel are encouraged to be professionally licensed, registered, and/or certified in their appropriate disciplines: Project manager, interior designer, cost estimator, and landscape architect. The fire protection engineer must be either a registered professional engineer who has passed the fire protection engineering written examination administered by the National Council of Examiners for Engineering and Surveys or a registered professional engineer in a related engineering discipline with a minimum of 5 years experience dedicated to fire protection engineering that can be verified with documentation. Offerers will be evaluated on the resumes submitted in Section E of the SF 330 in the following order of descending importance: (a) Key personnel are professionally licensed, registered and/or certified, (b)Years of experience of key personnel on projects similar in scope to the type of work required by this contract, (c) Education of key personnel and relevance to assigned role in contract, and (d) Years of experience working with other key personnel identified as proposed team members in response to this announcement. FACTOR 2 - SPECIALIZED EXPERIENCE AND TECHNICAL COMPETENCE IN THE TYPE OF WORK REQUIRED INCLUDING, WHERE APPROPRIATE, EXPERIENCE, INNOVATION, AND CREATIVITY APPROACHES FOR DESIGN IN ENERGY CONSERVATION, POLLUTION PREVENTION, WASTE REDUCTION, USE OF RECOVERED MATERIALS, LOW IMPACT DEVELOPMENT (LID), AND SUSTAINABLE DESIGN USING THE SPiRiT OR LEED REPORTING TOOLS - Offerers will be evaluated on the extensiveness of specialized and relevant experience data presented in Sections E, F, and G of the SF 330. FACTOR 3 - PAST PERFORMANCE - Offeror will be evaluated on contracts within the past five years with government agencies and private industry in terms of cost control, quality of work, and compliance with performance schedule (list previous contracts and include the name and telephone numbers of key contractor individuals responsible as well as POC representing the government or private industry for each contract). Indication of favorable performance ratings, awards, and repeat clientele in Section H of the SF 330 is recommended. Past performance will be based on ACASS ratings and other data presented by the offeror or as determined by the government. FACTOR 4 - WORK MANAGEMENT PLAN - A proposed work management plan shall be presented in Section H of the SF 330 which addresses: (a) Management approach, and (b) Team organization. Narrative discussing organizational chart presented in section D of the SF 330. Organizational chart will include all key personnel for which resumes were provided in Section E of the SF 330. Other personnel should be shown on the organizational chart by discipline in the total number available for utilization on task orders assigned under this contract. Also on the organizational chart, show lines of responsibility and communication between project team leaders and team members. Indicate the primary office where work for this contract will be completed. Clearly identify and address any work that will not be done out of the primary office and the functional relationship between the multiple offices, (c) quality control procedures, (d) cost control procedures, (e) performance schedule adherence procedures, (f) plan for handling multiple simultaneous delivery orders, and (f) Small Business (SB) status on proposed team. FACTOR 5 - PROXIMITY OF FIRM TO POPE AFB, NC - Annotate the number of miles traveling by car between each firm identified in response to this announcement and Pope AFB, NC in Section C of the SF 330. FACTOR 6 - CAPACITY TO ACCOMPLISH MULTIPLE DELIVERY ORDERS IN REQUIRED TIME - Offeror will be judged on capacity to accomplish multiple simultaneous delivery orders in the required time. In addition to the information provided in Part II Block 9 of the SF 330, each firm (prime/JV partner/partners/subs etc.) must list the number of professionally registered, licensed, and/or certified proposed team members identified in response to this announcement by discipline. At a minimum, list the following disciplines: architect, civil engineer, mechanical engineer, electrical engineer, fire protection engineer, geotechnical engineer, land surveyor, industrial hygienist, and sustainable development personnel. FACTOR 7 - AUTOCADD CAPABILITIES - Each firm shall discuss CADD software they use in Section H of SF 330. Demonstrating ability to submit all deliverables to the government in the latest version of AutoCADD will receive maximum points. FACTOR 8 - VOLUME OF PAST DoD WORK - Offeror shall list in Section H of SF 330 the number of DoD jobs awarded in the past 12 months in addition to the other information required in Part II Block 11 of the SF 330. Information on each factor must be submitted for the office, subcontractor, and/or employee performing the work in response to this announcement. It is recognized that for firms with multiple offices, a project team may be formed from personnel from more that one office. If more than one office is represented, this must be stated clearly in the work management plan and the Selection Board will consider the performance risk associated with that team not being co-located and their geographical proximities to both each other and to Pope AFB, NC. All responsible sources must submit three (3) copies of the requested SF 330 which shall be considered by the agency. No other notification to firms under consideration for this project will be made and no further action is required. Solicitation packages are not provided for A-E contracts. This is not a Request for Proposal. Two or more open-end AE contracts may be awarded. Numbered Note 24 is applicable to this announcement with the exception that interested firms will be required to submit hard copies of both Part I and II of the SF 330. Estimated award date is 01 November 2007. This is an unrestricted acquisition.

Similar Contracts

Same NAICS industry code