This Pre-Solicitation opportunity from Department Of Veterans Affairs was posted on July 24, 2019. The submission period has ended. Browse the details below for market research, or find similar active opportunities.

C--Construct New Outpatient Mental Health Addition (VA-19-00046877)

Awarded
36C25919R0118Federal

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

Active Opportunities Like This One

NAICS: 541330
New
SLED
Dam Safety Engineering Services – Southern California
Solicitation # 10221501
The California Department of Water Resources, Division of Operations and Maintenance and Dam Safety Services Branch, is soliciting Statements of Qualification for as-needed engineering and related services to support the review, inspection, evaluation, analysis, and oversight of structures associated with the State Water Project. With an estimated total contract range between 30 million and 40 million dollars, the work primarily focuses on the Southern Field Division, Castaic Field Division, and FERC Project Nos. 2426 and 2100, with potential backup support for the Oroville, Delta, and San Luis Field Divisions. Key services include dam performance surveillance, the development of monitoring plans and technical information documents, and specialized inspections involving drones, ROVs, and rope access for various appurtenances such as hydropower plants, spillways, and gates. The contract period is estimated to run from March 2, 2027, to March 1, 2030, with awards based on a most qualified selection process involving panel scoring and interviews. Qualified firms must submit their SOQs by November 17, 2026, and are required to provide a new Generative AI disclosure. Selected contractors must comply with Department of Industrial Relations prevailing wage requirements and provide comprehensive quality control and worker safety programs. Administration is managed by the DWR Contract Manager, with payments issued within 45 days of receiving undisputed invoices following verbal notice of work acceptance.
California Department of Water Resources

POSTED

about 2 hours ago

DEADLINE

in 18 days
NAICS: 541330
New
SLED
Construction, Engineering And Inspection (CEI) Services For The Sands Boulevard And Surfside Boulevard Bridge Repair Projects
Solicitation # 2026-RFP-PW-070-KR
The City of Cape Coral is soliciting proposals for Construction Engineering and Inspection (CEI) services for two federally funded bridge repair projects: the Sands Boulevard Bridge over Eternity Canal and the Surfside Boulevard Bridge over Maxine Canal. The selected engineering firm will provide construction contract administration to restore resiliency to bridge approaches, bulkheads, and shoreline protection. These projects are funded through the FDOT Local Agency Program and must adhere to FDOT manuals, FHWA requirements, and federal-aid compliance standards. The contract duration is 300 calendar days from the Notice to Proceed, and the consultant must be capable of supporting both projects concurrently or independently. The procurement follows a Qualifications-Based Selection process, with proposals due by November 5, 2026. To be responsive, firms must be FDOT prequalified and provide evidence of professional licensure in Florida. Evaluation is conducted by a Selection Advisory Committee based on personnel qualifications, team management, and prior experience. Awarded consultants must provide payment and performance bonds and meet comprehensive insurance requirements for professional and general liability. Compliance mandates include the Davis-Bacon Act, Build America Buy America Act, and specific environmental protections for threatened burrowing owls.
Public Works

POSTED

about 3 hours ago

DEADLINE

in 7 days
NAICS: 541330
New
SLED
Engineering Services for the Community Center HVAC Upgrades
Solicitation # RFP 2418
The Township of Wayne, New Jersey, is soliciting proposals under RFP 2418 for professional engineering services to manage HVAC upgrades at the Wayne Township Community Center. The project scope involves the replacement of all existing HVAC equipment, including 22 air handling units, a pool air handler, 19 exhaust fans, and one dedicated outdoor air system, as well as various other units throughout the facility. All new equipment must be integrated into a new Building Management System installed separately by the Township. The selected firm will be responsible for three primary phases: preliminary design, including field verification and cost estimation; final design, consisting of construction documents and a phased bidding plan; and construction administration, which includes bidding support, shop drawing reviews, and final punch list development. Proposals must be submitted electronically via the ProcureNow portal by November 5, 2026, at 11:00 am. The evaluation process uses a points-based system weighted toward cost (40 percent), general technical responsiveness and methodology (30 percent), and management experience and qualifications (30 percent). Bidders are required to provide lump sum pricing for each project phase and a schedule of hourly rates for unforeseen services. The contract duration is up to two years, with the possibility of two one-year extensions. Mandatory submission documents include a statement of interest, firm qualifications, key personnel resumes, a project approach, a W-9, and notarized non-collusion and ownership disclosure affidavits. Awarded contractors must provide a performance bond, certificate of insurance, and EEO compliance documentation within 14 days of receipt.
Purchasing Division

POSTED

about 3 hours ago

DEADLINE

in 13 days

AI Contract Overview

Show more

This pre-solicitation notice seeks an Architect-Engineering firm to design a second-story addition to Building 45 at the Grand Junction VA Medical Center in Colorado. The project aims to create a new outpatient Mental Health department and requires the firm to produce comprehensive construction documents, conduct preliminary investigations, and develop conceptual floor plans. Key technical requirements include expertise in hospital and mental health facility design, experience adding floors to existing structures, and knowledge of high-pressure steam systems for heating and domestic water. The estimated construction value is between 10 million and 20 million dollars. This opportunity is set aside exclusively for Service-Disabled Veteran-Owned Small Businesses (SDVOSB). Interested firms must submit a completed SF-330, Parts I and II, by August 27, 2019. Evaluation will be based on professional qualifications, specialized experience, capacity to perform, and past performance, among other criteria. The selected firm will be responsible for the project from conceptual design through construction period services, including site visits and final project close-out.

General Info

Contract Value

$1,066,731.37

NAICS

541330 - Engineering Services

Place of Performance

CO, USA

Set-Aside

SDVOSBC

Award Issued Date

Documents

0

No documents available

Documents will appear here when they are available.

AI Contract Breakdown

Uniform Contract Format

No documents to break down

The breakdown needs solicitation documents. None were found from this contract's source.

Timeline

PhaseAwarded
Posted

Presolicitation

Awarded

Contract was awarded

Submission Closed

Find active opportunities like this

Get full access to discover similar active contracts, track opportunities, and build proposals with AI assistance.

Organization & Contact Information

Show more
AgencyDepartment Of Veterans Affairs → Network Contract Office 19 (36C259)
ContactsNo contacts available
OfficeGreenwood Village, CO, 80111, USA
Office AddressGreenwood Village, CO, 80111, USA
ContactsNo contact information available

Full Description

Show more
Page 7 of 9 DESCRIPTION: This is a Pre-Solicitation Notice for the establishment of an Architect-Engineering (A-E) contract with services to be performed at the Grand Junction VA Medical Center at 2121 North Ave Grand Junction, Colorado 81501. This requirement is being set-aside to Small Disabled Veteran Owned Small Business (SDVOSB) firms. THIS ANNOUNCEMENT IS NOT A REQUEST FOR PROPOSAL; NO SOLICITATION PACKAGE WILL BE ISSUED UNTIL AFTER AN EVALUATION HAS BEEN MADE ON THE PROVIDED SF-330s. The SF-330 can be downloaded through the GSA Forms Library at: http://www.gsa.gov/portal/forms/type/TOP, scroll down to locate and click on the SF-330 hyperlink entitled, Architect-Engineer Qualifications. Written questions pertaining to this requirement should be submitted no later than 1:00 PM. Mountain Time (MT), August 6, 2019. Interested firms should submit their current SF-330, Parts I and II, to contact@example.gov. The SF-330s are due no later than 1:00 PM, MT, August 27, 2019. SCOPE OF WORK: This project requires the services of an architectural engineering firm (AE) having special knowledge of hospital design. The AE must have experience with mental health facilities; with constructing additional floors on existing buildings; and use of high-pressure steam for building heat and domestic water. Intent This project will add a second story to Building 45 to house the out-patient Mental Health department, providing spaces as listed in the space program. This contract will provide construction documents to achieve that intent. Requirements The AE selected is expected to: Conduct a detailed preliminary investigation. Physically survey as well as review record drawings of the existing building. Inform CO/COR of supplemental information gathering that may be required. Develop conceptual floor plans showing how the spaces needed for this function can be accommodated in the available space. Two basic approaches must be addressed during Conceptual Design: A PACT model, where patient care spaces are separated from medical administrative spaces; and a traditional model, where patient care is provided in Provider offices. Architect must reference active clinics using these approaches and provide points of contact so that Mental Health staff can visit various locations to determine the best approach for this station. Conceptual plans shall address integration of existing and proposed spaces for patient access and staff use. Conduct on-site work session with User Group and other members of the Integrated Project Team to discuss conceptual options. Describe all measures available to achieve the project objectives, including the benefits and drawbacks of each measure, to guide decisions by the facility during schematic design. The decision of which alternatives to select for the construction project rests with the VA. The A/E shall determine if the required utilities for the project exist and if they are of adequate size and inform the CO and COR if there will be a need for increased capacity or new utilities. Utilities may include, but are not limited to electricity, gas, steam, water, storm sewer, TV/Cable, fire and police alarm interface, voice, and data communications. The A/E shall develop a strategy to modify heat and domestic hot water equipment to use high pressure steam from the central plant, and to remove the existing low- pressure boilers in Building 45. Develop a schematic floor plan based on the selected concept that achieves the project objectives as described on the Space Program. Develop and describe a construction strategy that allows existing functions to continue during construction of the second story. Develop this strategy in development of construction documents. Develop and describe an outdoor therapeutic space. Participate in a conference call after VA has completed Schematic Design review. Provide Activation Assistance, developing a fixture, furnishings, and equipment list; researching costs of these items; and assisting with the development of acquisition documentation. Design and produce construction documents for implementation of the selected alternatives. Submittals must include the components listed on the A/E Submission Instructions for Minor and NRM Construction Program https://www.cfm.va.gov/ til/ ae/ aesubmin.doc. Provide a list to the VA of technical submittals that will be required. Intended for long-term use, the project design must provide facilities that are of enduring quality; Energy and water efficient; Environmentally conscious; Functional and requiring low maintenance; Durable; Flexible for changing uses; Universally accessible; Sustainable; Operationally cost effective; Compliant with appropriate codes, statutes, and VHA requirements. The internal partitions and doors must be designed to provide auditory privacy. Loud conversations should not be discernable outside treatment rooms. The space should be non-medical, and recovery oriented in aesthetic. The A/E will be required to develop corrections to the existing building space, including installation of partitions in the existing conference room to allow it to be used as three conference spaces; installation of AV equipment in the existing conference room; installation of a master switch; provide additional doorways in four locations; add card readers to ten interior doors; enclose police work station; and replace lights in existing waiting area. Construction documents must be complete, clear, specific, accurate, coordinated between disciplines, quantifiable, and explicit in quality expectations for suitable materials, systems, and workmanship. Throughout the design phases of a project, the A/E shall work closely with the COR and Integrated Project Team to ascertain and confirm all project requirements. The A/E shall participate in the station Construction Safety Work Group Infection Control Risk Assessment; develop infection control measures; and show these on the construction documents. The A/E shall determine if the construction will require a fire alarm or suppression system to be taken out of service; whether egress or access for emergency response will be blocked, or fire/smoke barrier walls to be breached. If so, A/E shall develop appropriate Interim Life Safety Measures and show these on the construction documents. AE will participate in conferences calls after the VA has reviewed the Design Development (65%) review and the Final Design (95%) review. Provide construction period services. Attend Pre-Bid Conference and prepare documents to be released as Addenda to the request for bids, if applicable Attend Pre-Construction Conference. Review submittals, including Construction Contractor's shop drawings, detail drawings, schedules, descriptive literature and samples, testing labor atory reports, field test data and review the color, texture and suitability of materials for conformity with the design concept and construction documents, and any substitution requests. Provide response to submittals within two business days of receipt. Attend Weekly Construction Progress Meetings. This requirement may be fulfilled by phone or in person. Periodically inspect work. The registered architects and engineers who are familiar with the design work of the project shall inspect completed work at critical completion points. [The AE shall suggest an appropriate number of inspections based on the complexity of the work.] [A/E shall provide three (3) site visits: one (1) at 75% construction completion, one (1) at or near construction completion for punch list items, and one (1) at the 11-month warranty timeframe.] A report which includes the purpose of the inspection, items reviewed, deficiencies observed, recommendations and additional actions required, shall be furnished to the Contracting Officer or his authorized representative within three (3) work days following the site visit date. Respond to Contractor Requests for Information. [The AE shall respond to Contractor questions presented formally, as RFI s, within five (5) business days of submittal.] [The A/E shall respond/reply to Contractor questions presented formally, as RFI s, within one (1) business day to confirm the RFI was received and give an estimate of how long it will take the AE to resolve the issue. It is the goal of both the VA and the A/E to resolve the RFI in a expedited manner to maintain the construction schedule.] The AE shall maintain an RFI log showing issue, date of receipt, date of response, and indicating relation to modifications to contract if applicable. AE shall prepare any supplemental drawings, specifications or other documents that may be required to clarify or supplement the construction documents. Assist in review and preparation of Construction Contract Modifications. AE's review and recommendations shall include an independent breakdown of costs in detail with quantities and unit prices and shall cover both additions and deductions of labor, materials and equipment. AE shall provide Project Close-Out and Post construction services. Project Completion and Acceptance. The AE shall diligently monitor the Contractor s progress to complete the work in accordance with the Contract Documents and within the Contract Time for completion. AE Team shall attend scheduled final inspection. AE shall prepare a supplemental punch list to include incidental corrective work not addressed in the Contractor s punch list; review comments and punch list items generated for conformance with the requirements of the Contract Documents; and incorporate enforceable comments and punch list items into a single supplemental punch list. Review of O&M Manuals. AE team shall provide a detailed list of closeout submittal requirements, review the Close-Out Submittals for compliance with the contract documents, and ensure that the information provided is specific to the equipment and systems installed in the project. Training Plan for Client Agency Personnel. AE team shall review the Contractor s training plan and training material and monitor the satisfactory progress and completion of the plan. Substantial Completion The AE shall assist in determining that: All contract work except incidental punch list items are complete; all systems and parts are functional; utilities and meters have been connected, tested, and function properly; Owner training has been completed; O&M Manuals meet specifications and have been delivered to owner; specified maintenance materials (tools, spare parts, extra stock, etc.) have delivered to Owner; specified required Special Inspection and Testing reports received by Owner. Warranty Review. Should warranty problems arise, the VA may request assistance from AE to resolve the issue. AE shall attend the 11-month walk-through prior to expiration of the warranty period and issue a Warranty Inspection report to all attendees. OFFERORS WILL BE EVALUATED ON THE FOLLOWING CRITERIA: The submitted SF-330s will be evaluated on the following criteria: This acquisition will be in accordance with FAR Part 36.602-1 and VAAR Part 836.601-1. The following evaluation criteria will be used to evaluate SF-330 technical proposals: The A/E must demonstrate its qualifications with respect to the published evaluation criteria for all services. Evaluation Criteria (1) through (4) are considered most important and equal among themselves; Criteria (5) and (6) are of slightly less importance than (1) through (4) but are equal value among themselves; Criteria (7) and (8) are the least important and listed in descending order of importance. Specific evaluation criteria include: (1) Professional qualifications necessary for satisfactory performance of required services; (2) Specialized experience and technical competence in the type of work required, including, where appropriate, experience in energy conservation, pollution prevention, waste reduction, and the use of recovered materials; (3) Capacity to accomplish the work in the required time; (4) Past performance on contracts with Government agencies and private industry in terms of cost control, quality of work, and compliance with performance schedules; (5) Location in the general geographical area of the project and knowledge of the locality of the project; provided, that application of this criterion leaves an appropriate number of qualified firms, given the nature and size of the project; and (6) Location in the general geographical area of the project and knowledge of the locality of the project; provided, that application of this criterion leaves an appropriate number of qualified firms, given the nature and size of the project. (7) Reputation and standing of the firm and its principal officials with respect to professional performance, general management, and cooperativeness. (8) Record of significant claims against the firm because of improper or incomplete architectural and engineering services. Criterion1 - Professional Qualifications necessary for satisfactory performance of required services. Offerors will be evaluated in terms of the qualifications, competence and experience of the key personnel and technical team proposed to accomplish this work. Key personnel are individuals who will have major contract or project management responsibilities and/or will provide unusual or unique expertise. Provide a balanced licensed and or certified workforce in the following disciplines Architecture, Interior Design, Civil, Structural, Mechanical, Electrical, Fire Protection Engineering and LEED/Green Globes. Submission requirements: Provide resumes for all proposed key personnel. Resumes are limited to one page each and should cite project specific experience and indicate proposed role in this contract. Provide professional registration, certification, licensure and/or accreditation. Indicate participation of key personnel in example projects in the SF-330 Part 1 Section G. Criterion 2 - Specialized experience and technical competence in the type of work required, including, where appropriate, experience in energy conservation, pollution prevention, waste reduction, and the use of recovered materials. Offerors will be evaluated on specialized experience and technical competence in the performance of services similar to those anticipated under this contract with regard to: Special knowledge of hospital design Experience with mental health facilities Experience constructing additional floors on existing building Knowledge of and experience in the use of high-pressure steam for building heat and domestic water. Submission requirements: Provide up to five (5) projects completed or substantially completed within the past five (5) years that best illustrate specialized experience of the proposed team in the areas outlined above. Example projects shall note project s square footage. All projects provided in the SF-330 must be completed by the office/branch/regional office/individual team member proposed to manage and/or perform work under this contract. To enable verification, firms should include the DUNS number along with each firm name in the SF-330 Part 1, Section F Item 25 Firms from Section C Involved in this Project, block (1). Include a contract number or project identification number in block 21. Include an e-mail address, and phone number for the point of contact in block 23(c). Include in the project description the contract period of performance, award contract value, current contract value, a summary of the work performed that demonstrates relevance to specialized experience as outlined above. If the contractor served as a subcontractor on a project, indicate the value of the work they provided towards the performance of the overall project. If a project was performed by a joint venture, and not all joint venture partners are on the team proposed for this contract, the offeror/team should specifically address the work performed by the joint venture partner offering/teaming on this contract. Likewise, if the offeror/team member worked as a subcontractor on a project, the description should clearly describe the work actually performed by the offeror/team member and the roles and responsibilities of each on the project, rather than the work performed on the project as a whole. If the project description does not clearly delineate the work performed by the entity/entities offering/teaming on this contract, the project could be eliminated from consideration. NOTE: If the Offeror is a joint venture, information should be submitted as a joint venture; however, if there is no information for the joint venture, information should be submitted for either joint venture partner, not to exceed a total of five (5) projects for this criterion. Projects shall be submitted on the SF-330. For submittal purposes, a task order on an IDIQ contract is considered a project, as is a stand-alone contract award. Do not list an IDIQ contract as an example of a completed project. Instead, list relevant completed task orders or stand-alone contract awards that fit within the definition above. Examples of project work submitted that do not conform to this requirement will not be evaluated. Failure to provide requested data, accessible points of contact, or valid phone numbers could result in a firm being rated lower. All information for Criterion 2 should be submitted in Part 1, Section F of the SF-330. The Government WILL NOT consider information submitted in addition to Part 2, Section F in evaluating Criterion 2. Criterion 3 - Capacity to accomplish the work in the required time. Firms/teams will be evaluated in terms of their ability to plan for and manage work under the contract and capacity to accomplish the work in the required time. Submission requirements: Describe the firm s ability to concurrently perform and manage multiple projects in different locations to meet aggressive schedules, multiple disciplines, and control costs and the firm s capacity to accomplish multiple projects simultaneously. Criterion 4 - Past Performance Offerors will be evaluated on past performance with Government agencies and private industry in terms of work quality, compliance with schedules, cost control, and stakeholder/customer satisfaction. Evaluating past performance and experience will include information provided in Past Performance Questionnaires (PPQs) or CPARS/ACASS for Criterion 1 projects and may include other information provided by the firm, customer inquiries, Government databases, and other information available to the Government including contacts with points of contact in other criteria. Failure to provide requested data, accessible points of contact, or valid phone numbers could result in a firm being rated lower. NOTE: Past performance information for projects listed under Criterion 1. Submission requirements: SUBMIT A COMPLETED CPARS/ACASS EVALUATION FOR EACH PROJECT UNDER CRITERION 1. IF THERE IS NOT A COMPLETED CPARS/ACASS EVALUATION, the Past Performance Questionnaire (PPQ) included in this notice is provided for the offeror or its team members to submit to the client for each project the offeror includes under Criterion 1. AN OFFEROR SHALL NOT SUBMIT A PPQ WHEN A COMPLETED CPARS/ACASS IS AVAILABLE. IF A CPARS/ACASS EVALUATION IS NOT AVAILABLE, ensure correct phone numbers and email addresses are provided for the client point of contact. Completed PPQs should be submitted with your SF-330. If the offeror is unable to obtain a completed PPQ from a client for a project(s) before the response date set forth in this notice, offerors should complete and submit with their responses the first page of the PPQ (Attachment), which will provide contract and client information for the respective project(s). Offerors may submit a PPQ previously submitted under a different Notice/RFP (legible copies are acceptable) if it is on the same form as posted with this Synopsis. Offerors should follow up with clients/references to ensure timely submittal of questionnaires. If requested by the client, questionnaires may be submitted directly to the Government's point of contact, Network Contracting Office 19, Attn: Donna Gillette via email at contact@example.gov prior to the response date. Offerors shall not incorporate by reference into their response PPQs or CPARS previously submitted in response to other A/E services procurements. However, this does not preclude the Government from utilizing previously submitted PPQ information in the past performance evaluation. Criterion 5 - Location in the general geographical area (Grand Junction, CO) and knowledge of the (Grand Junction, CO); provided, that application of this criterion leaves an appropriate number of qualified firms, given the nature and size of the project. Provided that the application of this criterion leaves an appropriate number of qualified firms, given the nature and size of the contract, firms/teams will be evaluated on the locations of their office or offices that will be performing the work under this contract. Submission requirements: Indicate firms/teams location, including main offices, branch offices and any subconsultants offices and demonstrate how this will be advantageous to the Government. Criterion 6 - Location in the general geographical area (Sheridan, WY) and knowledge of the (Sheridan, WY); provided, that application of this criterion leaves an appropriate number of qualified firms, given the nature and size of the project. Provided that the application of this criterion leaves an appropriate number of qualified firms, given the nature and size of the contract, firms/teams will be evaluated on the locations of their office or offices that will be performing the work under this contract. Submission requirements: Indicate firms/teams location, including main offices, branch offices and any sub consultants offices and demonstrate how this will be advantageous to the Government. Criterion 7 Reputation and standing of the firm and its principal officials with respect to professional performance, general management, and cooperativeness. Submission requirements: Offerors shall provide documentation (awards, certificates, publications, commendations from within the community) as evidence of reputation and standing of its firm. Criterion 8 - Record of significant claims against the firm because of improper or incomplete architectural and engineering services. Offerors with substantiated claims against the firm because of improper architectural and engineering services provided in the last three (3) years. Submission requirements: Records and any other documentation of substantiated claims highlighting improper or incomplete architectural engineering services against the firm within the last three (3) years. SELECTION INTERVIEW: Interviews shall be scheduled with firms slated as the most highly qualified. Firms slated for interviews will be asked a series of established questions. Elaborate presentations are not desired. GENERAL INFORMATION: All design and work will conform to the current edition of the VA Master Specifications and VA Design Standards as published at the following site: www.cfm.va.gov; ASME, OSHA, IBC 2009, NFPA and NEC building codes and standards. Coordinate all work through the COR of Facilities Management Service. Contractor is responsible for all cleanups and refuse disposal throughout the construction period. The A-E firm will prepare drawings and specifications in sufficient detail such that qualified outside General Contracting companies can prepare accurate and timely proposals for the desired construction work. Microsoft Project scheduling and management software will be used by both the A-E and Contractors to allow for regular tracking of schedules and work by the VA Medical Center. Schedules with MS Project will be regularly sent to the COR upon project initiation and whenever significant changes occur in the schedule. The estimated magnitude of construction is between $10,000,000 and $20,000,000. The A-E will provide an initial estimate of cost to perform the above work and will design only those items that can be provided within the cost limitation. The Medical Center must remain operational throughout the construction period and a detailed sequence of work will be provided by the A-E to minimize impact of the construction. The A-E will provide documents at each submission as indicated in the statement of work. The NAICS code for this procurement will be 541330, Engineering Services. The current small business size standard for 541330 is $15.0 million. Requirement for Electronic Submission Unless paper offers are specifically authorized, all responses to this pre-solicitation notice must be submitted electronically as described below. The only acceptable paper form for this requirement is the receipt of past performance questionnaires. Failure to comply with this requirement may jeopardize the possibility of receiving an award for the contract due to non-compliance with the terms of the solicitation. You must submit your electronic offer, and any supplemental information (such as spreadsheets, backup data, technical information), using any of the electronic formats and media described below. In addition, contractors are notified of the award via an electronic Notice of Award e-mail. The award document will be attached to the Notice of Award e-mail. Acceptable Electronic Formats (Software) for Submission of Offers Files readable using the current Microsoft* Office version Products: Word, Excel, PowerPoint, or Access. Spreadsheet documents must be sent in a format that includes all formulas, macro, and format information. Print or scan images of spreadsheets are not acceptable. - Please see security note below for caution regarding use of macros. When submitting construction drawings contractors are required to submit one set in AutoCAD and one set in Adobe PDF. (Purpose: contracting can open the PDF version and engineering can open AutoCAD files) Files in Adobe* PDF (Portable Document Format) Files: When scanning documents scanner resolution should be set to 200 dots per inch, or greater. Another electronic format. - If you wish to submit an offer using another format than those described in these instructions, e-mail the Contracting Officer who issued the solicitation. Please submit your request at least ten (10) calendar days before the scheduled closing date of the solicitation. - Request a decision as to the format acceptability and make sure you receive approval of the alternate format before using it to send your offer. Please note that we can no longer accept .zip files due to increasing security concerns. E-mail Submission Procedures: For simplicity in this guidance, all submissions in response to a solicitation will be referred to as offers. Subject Line: Include the solicitation number, name of company, and closing date of solicitation. Use only one of the terms Quotation, Offer, or Bid depending on the solicitation type. Size: Maximum size of the e-mail message shall not exceed five (5) megabytes. The SF330, in its entirety, shall not exceed one email of 5MB. The SF330 (not including past performance questionnaires) are limited to 30 pages. If the page limits are exceeded, the pages in excess of the limit will not be read or considered. Only one email is permitted unless otherwise stated in this paragraph or in writing by the Contract Officer submitting the solicitation. The Microsoft Outlook © Email time/date stamp will be used to date and time stamp offers for the official record of receipt for the submission. The date and time stamp in recipients inbox is the official record of receipt. Security Issues, Late Bids, Unreadable Offers Late submission of offers is outlined at FAR Parts 52.212-1(f), 52.214-7, and 52.215-1(c)(3). Attention is warranted to the portion of the provision that relates to the timing of submission. - Please see FAR 15.207(c) for a description of the steps the Government shall take with regard to unreadable offers. - To avoid rejection of an offer, vendors must make every effort to ensure their electronic submission is virus-free. Submissions or portions thereof submitted and which the automatic system detects the presence of a virus or which are otherwise unreadable will be treated as unreadable pursuant to FAR Parts 14.406 and FAR 15.207(c ). The virus scanning software used by our e-mail systems cannot always distinguish a macro from a virus. Therefore, sending a macro embedded in an e-mail message or an e-mail attachment may cause the e-mail offer to be quarantined. You may send both the spreadsheet and the spreadsheet saved in PDF format to ensure that your proposal is readable. Password protecting your offer is not permitted. The Contracting Officer will file the offer electronically which will allow access only by designated individuals. Important Notice: Apparent successful offerors must apply for and receive verification from the Department of Veterans Affairs Center for Verification and Evaluation (CVE) in accordance with 38 CFR Part 74 and VAAR 819.70 by submission of documentation of Veteran status, ownership and control enough to establish appropriate status, offerors must be both VISIBLE and VERIFIED by the Department of Veterans Affairs Center for Verification and Evaluation prior to contract award. Failure to be both VERIFIED by CVE and VISIBLE on VetBiz prior to contract award will result in the offeror s proposal being deemed non-compliant. All offerors are urged to contact the CVE and submit the required documents to obtain CVE verification of their SDVOSB status if they have not already done so. 852.219-10 VA NOTICE OF TOTAL SERVICE-DISABLED VETERAN-OWNED SMALL BUSINESS SET-ASIDE (DEC 2009) (a) Definition. For the Department of Veterans Affairs, Service-disabled veteran-owned small business concern : (1) Means a small business concern: (i) Not less than 51 percent of which is owned by one or more service-disabled veterans or, in the case of any publicly owned business, not less than 51 percent of the stock of which is owned by one or more service-disabled veterans (or eligible surviving spouses); (ii) The management and daily business operations of which are controlled by one or more service-disabled veterans (or eligible surviving spouses) or, in the case of a service-disabled veteran with permanent and severe disability, the spouse or permanent caregiver of such veteran; (iii) The business meets Federal small business size standards for the applicable North American Industry Classification System (NAICS) code identified in the solicitation document; and (iv) The business has been verified for ownership and control and is so listed in the Vendor Information Pages database, (http://www.VetBiz.gov). (2) Service-disabled veteran means a veteran, as defined in 38 U.S.C. 101(2), with a disability that is service-connected, as defined in 38 U.S.C. 101(16). (b) General. (1) Offers are solicited only from service-disabled veteran-owned small business concerns. Offers received from concerns that are not service-disabled veteran-owned small business concerns shall not be considered. (2) Any award resulting from this solicitation shall be made to a service-disabled veteran-owned small business concern. (c) Agreement. A service-disabled veteran owned small business concern agrees that in the performance of the contract, in the case of a contract for: (1) Services (except construction), at least 50 percent of the cost of personnel for contract performance will be spent for employees of the concern or employees of other eligible service-disabled veteran-owned small business concerns; (2) Supplies (other than acquisition from a non-manufacturer of the supplies), at least 50 percent of the cost of manufacturing, excluding the cost of materials, will be performed by the concern or other eligible service-disabled veteran-owned small business concerns; (3) General construction, at...

More opportunities from Department Of Veterans Affairs → Network Contract Office 19 (36C259)

Same awarding agency

NAICS: 623220
New
Federal
Q519--554 | Short Term Psychiatric Transitional Housing Long-Term Contract | Base+4
Solicitation # 36C25926Q0497
Solicitation 36C25926Q0497, issued by the Department of Veterans Affairs Network Contracting Office 19, seeks a contractor to provide short-term, transitional residential care and psychiatric step-down services for the Rocky Mountain Regional VA Medical Center in Aurora, Colorado. The scope of work includes the potential use of Mental Health Transitional Living Homes Level I or II. The contract is structured with a base period from December 1, 2026, to November 30, 2027, and four subsequent one-year option periods. Payment is based on an individual bed day of care, defined as the period from 12:00 pm to 11:59 am the following day. The government will award the contract based on the most advantageous offer, evaluating technical capability, regulatory practices including HIPAA and OSHA compliance, and quality assurance programs. Contractors must maintain 24-hour staffing, ensure ADA accessibility, and adhere to strict health and safety codes. Required submissions include three separate volumes covering technical capability, past performance, and price, along with certifications for the Immigration and Nationality Act and Organizational Conflicts of Interest. Performance will be monitored through a Quality Assurance Surveillance Plan involving unannounced site visits, patient satisfaction surveys, and clinical outcome measures.
Residential Mental Health and Substance Abuse Facilities

POSTED

1 day ago

DEADLINE

in 7 days
View Details
NAICS: 339112
New
Federal
6695--SURGERY GLOBUS INSTRUMENT SET
Solicitation # 36C25927Q0043
The Oklahoma City Veterans Affairs Health Care System requires one complete Globus Medical instrument set for use in neurology and orthopedic spine surgeries. This comprehensive solution must include all necessary components for functionality, such as cables, connectors, and mounts, and must adhere to stainless-steel standard operating procedures. The instruments must be reusable and specifically designed for spinal procedures in the operating room. The contractor must be an expert in the neuro and ortho spine field and is responsible for replacing any malfunctioning or broken items at no cost to the VA for the first 12 months following purchase, coordinating maintenance with the OKC VAHCS Biomedical Engineering Department. This procurement is identified as a sources sought notice under NAICS code 339112 and is set aside for Service-Disabled Veteran-Owned Small Businesses. Deliveries to the Oklahoma City facility are required Monday through Friday between 07:00 and 16:00. The instrument set consists of 35 specific line items, including various pedicle probes, rod templates, ratcheting handles, driver shafts, and taps. Interested vendors must provide a capability statement, business size information, country of origin, and estimated lead times. There are no security accreditation requirements as the contractor will have no access to patient records or restricted hospital areas, and no VA employee training is required.
Surgical and Medical Instrument Manufacturing

POSTED

2 days ago

DEADLINE

in 7 days
View Details
NAICS: 513210
New
Federal
R604--Mail Tracking Service
Solicitation # 36C25927Q0017
Solicitation 36C25927Q0017 is a firm-fixed price contract set aside for Service-Disabled Veteran-Owned Small Businesses (SDVOSB) to provide a web-based package and mail tracking system for the Department of Veterans Affairs. The primary site of performance is the Rocky Mountain Regional VA Medical Center in Aurora, Colorado, specifically within the KS-100 SCMS Warehouse. The system must be capable of processing approximately 250,000 parcels and will initially support up to 12 users. The contractor is responsible for providing all necessary hardware, including one barcode printer, 12 scanners with integrated signature pads, and one mobile device, as well as all associated consumables and routine replacement parts. The software will operate as a standalone system not connected to the VA network, meaning it should be SaaS permitted and will not require integration with internal VA identity management or directory services. The contract consists of a base period from October 30, 2026, to October 29, 2027, with four subsequent one-year options extending the total potential duration to five years and six months. Quotes are due by 14:00 MT on October 30, 2026. Pricing must be comprehensive, including all initial hardware, installation, and implementation costs within the original quote, though the government accepts a higher base-year price to account for these non-recurring expenses. Technical support is required to align with warehouse operating hours of 6:30 a.m. to 2:30 p.m. Award will be based on a comparative analysis of technical capability, price, and past performance, with a strict requirement that offerors be VetCert verified to be eligible for award.
Software Publishers

POSTED

3 days ago

DEADLINE

in about 2 hours
View Details
NAICS: 238110
New
Federal
554-27-117 Conduct Concrete and Civil Site Repairs.
Solicitation # 36C25926Q0826
Solicitation 36C25926Q0826 is a 100 percent set-aside for Service-Disabled Veteran-Owned Small Businesses (SDVOSB) to perform concrete and civil site repairs at the Rocky Mountain Regional VA Medical Center in Aurora, Colorado. The project, estimated between 100,000 and 250,000 dollars, involves comprehensive drainage remediation, sidewalk leveling, curb repair, and the removal and replacement of concrete sections to address trip hazards and improve snow removal. The scope of work includes 52 specific repair items and requires strict adherence to VA standards, AIA Construction Guidelines, and Joint Commission Environment of Care Standards. Performance must begin within 10 calendar days of award and be completed within 90 calendar days. The government will award the contract based on best value, evaluating offerors on price, past performance on at least two similar projects of 100,000 dollars or more within the last five years, and safety records, including an Experience Modification Rate (EMR) of 1.0 or less. Contractors must provide a Site Specific Safety Plan and ensure a competent person with a 30-hour OSHA card is on-site at all times. Proposals must be submitted via email to Elia L Ruiz Manzo by November 13, 2026, at 10:00 AM MT, and must include a signed SF-1442, a Limitations on Subcontracting certification, and past performance documentation.
Poured Concrete Foundation and Structure Contractors

POSTED

3 days ago

DEADLINE

in 14 days
View Details

Earlier notices in this NAICS code

Posted before this notice, open and closed

Find Active Opportunities Like This

Get AI-powered intelligence on the opportunities still open

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 750+ contractors already using CLEATUS