Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, November 11 at 2:00 PM ET

Register Free →

C--Dolph Mine fire Inspection Services

Active
DOI-SNOTE-070104-002Federal

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

AI Contract Overview

Show more

This contract involves providing comprehensive construction inspection services for the Dolph Colliery Mine Fire project in Olyphant, Lackawanna County, Pennsylvania. The scope includes overseeing extensive excavation work involving approximately 750,000 cubic yards over an estimated 125-day period. Key activities to be inspected are erosion and sediment controls, clearing and grubbing, waterline installation, sewer rerouting, drilling, and excavation through unconsolidated materials. During peak operation, two draglines will run nearly continuously, requiring multiple inspectors per shift to monitor activities and compile detailed reports, maps, and cross sections. Inspectors must work in challenging conditions such as hazardous terrain, potential toxic gases from the mine fire, harsh weather, and around heavy machinery. The contractor must supply suitable inspection equipment, including gas monitors and shielded thermocouples, and inspectors need to be equipped to work outdoors, perform gas and temperature monitoring, and conduct field calculations. The contract mandates that all inspectors hold certifications from the Office of Surface Mining (OSM), with at least one Mine Fire Certified Inspector present per shift. The inspection firm must provide a detailed management plan addressing staff scheduling, qualifications, and contingency plans in case of unforeseen absences. Deliverables include weekly operational reports, borehole location markings, cross-section preparation, and high-quality photographic and video documentation provided in both bound and digital formats. Daily volumetric excavation estimates and various field measurements for pay items will be the inspectors’ responsibility, while the contractor provides a heated onsite trailer and necessary facilities. The technical evaluation of proposals emphasizes management capability, staff qualifications, and relevant corporate experience, with award criteria favoring the offer best meeting OSM's operational needs and technical requirements.

General Info

Inspection services for Dolph Colliery Mine Fire project involving excavation, monitoring, safety, and detailed reporting.

NAICS

541350 - Building Inspection Services

Place of Performance

DC

Set-Aside

NONE

Documents

0

No documents available

Documents will appear here when they are available.

AI Contract Breakdown

Uniform Contract Format

No documents to break down

The breakdown needs solicitation documents. None were found from this contract's source.

Timeline

Posted

special-notice

Ready to pursue this opportunity?

Get full access to track this contract, build proposals with AI assistance, and manage your pipeline.

Organization & Contact Information

Show more
AgencyDepartment Of The Interior → Headquarters Office
ContactsNo contacts available
OfficeWASHINGTON, DC, 20240, USA
Office AddressWASHINGTON, DC, 20240, USA
ContactsNo contact information available

Full Description

Show more
CONSTRUCTION INSPECTION SERVICES DOLPH COLLIERY MINE FIRE OLYPHANT, LACKAWANNA CO., PA WB-06-035 Inspection Demand Pre-Bid: January 7, 2007; 1:00 PM The project will begin with installation of the E & S Controls and Clearing and Grubbing. Very quickly, the waterline installation, sewer line re-route, drilling, and excavation in unconsolidated material will commence. Eventually, we hope to have 2 draglines working 20 hrs./day - 7 days/week for ~125 days. The project will involve ~750,000cy of excavation and conclude with site restoration. These activities will necessitate a significant amount of inspection. During the busiest times (when 2 drag lines are working), 2 inspectors/shift will be needed with another overlapping and/or working in the trailer compiling maps/cross sections/summarizing quantities and organizing reports for a total of 350 inspection hrs./week. The firm should stagger the schedules to allow at least a 1 hour overlap between shifts so that site conditions and situations can be discussed by inspectors. At slower times, possibly during startup and during grading & demobilization, we may only need 1 inspector/shift with another overlapping for a total of 210 hours/week. During the first week until equipment is brought onsite and lights can be installed, the inspection need may be as little as 140 hours per week. The Inspectors will be working in difficult conditions, including hazardous terrain, blasting, artificial lighting, winter weather, overhead equipment, and the normal threats posed by an underground mine fire. These threats include dangerous gases (CO) and hot air borne materials. Access to the work site will likely require a 4-wheel drive vehicle with clearance. The Construction Contractor will provide a heated trailer that contains tables, chairs, electricity, and water. A portable toilet will also be provided for the workforce. While one inspector may be situated in the trailer for most of a shift, it is anticipated that the other inspectors will be primarily working outside during the shift. The inspectors should be capable of being outside in the elements for extended periods of time, and be able to get around in the varied terrain of the worksite to perform gas and temperature monitoring, as well as volume and area calculations. The successful bidder for inspection must provide gas measurement equipment and shielded thermocouples and meters that are accurate in moist environments to depths of 150 feet. The Inspection firm will be required to present weekly reports on all operations to OSM no later than Monday of the following week. The inspection firm will also be responsible for indicating the location of boreholes on the project plans, preparing cross sections as requested and performing other duties as assigned. The inspection firm must be capable of providing all video and still photography in digital format. The important high quality photos selected by the COR must be provided in a captioned bound format, approved by the COR. The remaining photos must be provided in a COR approved digital format. Also, the video must be provided in a DVD format. The inspection firm will be allocated up to 24 hours to prepare a detailed final report. OSM plans to issue a single contract with one firm, to provide all the inspectors needed. All Inspectors onsite will have to be certified by OSM for this type of work. The certification process begins by submitting a resume to OSM and, if approved, the candidate must attend an unpaid orientation that involves viewing 8 hours of video Prospective firms must submit a technical proposal that describes in a detailed Management Plan how the firm will provide and schedule all of the Inspectors necessary. It must include the names of the OSM Mine Fire Certified Inspectors as well as the names of the other OSM Certified Inspectors who will work along with the Mine Fire Inspector. At least one OSM Certified Mine Fire Inspector must be onsite at all times during each work shift, while additional inspectors on the shift must be OSM Certified in Drilling and/or Excavation & Backfilling. The technical proposal shall provide a contingency plan in the event that a key inspector is sick, injured, or otherwise unable to perform his/her duties. The firm will be required to develop and maintain all reports and records regarding contract bid items and quantities. This includes, but is not limited to, drilling records, excavation, blasting, water usage, sewer line work, as well as photographic and video records. It will involve performing field measurements for pay items that require area measurements for payment. Volumetric measurements for payment regarding the two excavation items will be compiled by others, however daily volumetric estimates of excavation must be calculated by the Inspector. The Inspector will also be required to perform other related duties as requested by the COR. Each Inspector must provide and carry a cell phone at all times while at work. TECHNICAL EVALUATION CRITERIA The Technical Proposal separately addressing the respective geographical areas, " Instructions to Offerors" relative to Statement of Work requirements, will be evaluated and point scored by a committee of technically qualified OSM employees assisted by OSM Contracting personnel in accordance with factors listed below: 1. Implement and supervise Required Work (reflected in Management Plan) - 30% a. Availability and allocation of staff resources and equipment to meet requirements - 15% b. Management supervision and coordination with subcontractors to meet requirements - 15% 2. Qualification of Personnel - 50% Staff qualifications and experience to meet requirements - 50% 3. Corporate Specialized Experience - 20% a. Familiarity with area and conditions in which projects are likely - 10% b. Experience with similar projects - 10% Award will be made to that responsible Offeror whose offer, conforming to this Request for Quote is most advantageous to the Government, the elements listed above, and other factors considered.

Similar Contracts

Same NAICS industry code

NAICS: 541350
New
Federal
NTX Elevator Inspection
Solicitation # 36C25727Q0031-0001
The Department of Veterans Affairs Network Contracting Office 17 is soliciting elevator and dumbwaiter inspection and testing services for three facilities located in Dallas, Garland, and Bonham, Texas. This requirement is 100% set-aside for Service-Disabled Veteran-Owned Small Businesses (SDVOSB) under NAICS code 541350. The scope of work includes annual Category 1 inspections for all conveyances and five-year Category 5 full-load testing for 23 conveyances in Garland and Sam Rayburn, and 47 conveyances in Dallas, including three dumbwaiters. All services must be performed in accordance with A17.1 and A17.2 elevator codes by TDLR-registered and QEI-certified inspectors. The contract will be awarded based on technical capabilities, past performance, and price. Deliverables include inspection reports and regulatory filings submitted to the Texas Department of Licensing and Regulation and the Contracting Officer's Representative. Invoices are to be submitted in arrears upon the completion and acceptance of services. Proposals must be submitted as a single combined PDF by November 9, 2026, at 3:00pm CST, with a 25-page limit for the technical proposal, excluding technical exhibits such as licenses and certifications. Key administrative requirements include compliance with FAR 52.222-42 and 52.222-43 regarding labor standards and the VAAR 852.219-75 certification.
257-NETWORK Contract Office 17 (36C257)

POSTED

about 6 hours ago

DEADLINE

in 11 days
View Details
NAICS: 541350
New
SLED
Campus Consulting – Inspector Of Record (IOR) Services
Solicitation # RFP2026-06AM
California State University, Chico is soliciting proposals under RFP2026-06AM for a non-exclusive Task Order Service Agreement to provide on-site Inspector of Record or Construction Inspector services for various campus projects. The selected service provider will be responsible for quality control and ensuring code compliance in accordance with the California Building Code. Qualified inspectors must hold certifications from ICBO/ICC, OSHPD, or DSA, or be a licensed architect or registered engineer in California. The contract features an initial term of two years with the option to renew for two additional two-year terms. Proposals are due by November 12, 2026, and must include a standard fee schedule, detailed experience and staffing information, project history regarding construction costs, and sample inspection documentation. Evaluation will emphasize experience with higher education institutions, specifically within the California State University system. Awarded providers must register with the Department of Industrial Relations and maintain comprehensive insurance coverage, including a 4 million dollar general aggregate and specific workers compensation limits. Payments will be processed monthly in arrears upon submission of invoices in the CSU format and written approval from the project administrator.
California State University, Chico

POSTED

about 10 hours ago

DEADLINE

in 14 days
View Details
NAICS: 541350
New
SLED
Districtwide Construction Inspection Services
Solicitation # 2027-07
The Solana Beach School District is soliciting qualifications under RFQ 2027-07 to establish a master agreement for districtwide construction inspection services. The scope of work encompasses both general construction-related consultant services and specialized inspection and materials testing. The District intends to create pools of prequalified firms, short-listing up to five of the most qualified firms per specialty to be assigned work on an as-needed basis via written task orders. The initial term of the agreement is one year, with the possibility of four one-year extensions for a total maximum duration of five years. Selection is based on qualifications rather than the lowest price, utilizing a 100-point scoring scale that emphasizes the depth of the firm's experience and the qualifications of proposed professionals. Minimum requirements include at least ten years of experience with California public K-12 projects, current DIR registration, and specific DSA certifications for project inspectors or laboratory of record status for materials testing. Awarded firms must comply with California prevailing wage laws, non-discrimination policies, and the Drug-Free Workplace Act. Invoicing occurs monthly and requires detailed documentation of time spent and work accomplished. Responses are due by November 10, 2026, and must include four hard copies and one electronic PDF copy on a USB drive for each specialty applied for.
Solana Beach School District

POSTED

about 11 hours ago

DEADLINE

in 12 days
View Details
NAICS: 541350
New
SLED
Residential Energy Audit
Solicitation # NSD-RFQu-26-006
The City of Phoenix Neighborhood Services Department is soliciting offers for residential energy audit consulting services under solicitation NSD-RFQu-26-006. The resulting agreement will have a five-year term beginning December 1, 2026, or upon final recording by the City Clerk. The selected contractor will perform various technical assessments, including Manual J, Manual D, Manual S, Appliance, and CO2 audits. Deliverables include detailed electronic audit reports submitted via a secure portal, featuring property photographs and documentation of pre-existing and post-construction conditions. Performance timelines are strict, with standard audits required within two weeks of request and emergency audits scheduled within 24 hours and performed within three business days. Award decisions will be based on the most advantageous offer, with a heavy emphasis on the Statement of Qualification, which requires at least one year of relevant experience and detailed staffing and quality assurance narratives. Contractors must maintain valid professional licenses, adhere to City of Phoenix confidentiality and data protection standards, and ensure all personnel pass Police Department background checks. Compliance requirements include adhering to the Clean Air Act, Federal Water Pollution Control Act, and various nondiscrimination mandates such as Title VI of the Civil Rights Act. Additionally, contractors working outdoors must maintain a written heat safety plan in both English and Spanish. Invoicing is handled electronically in PDF format, with payments issued upon receipt of signed delivery or service tickets.
Neighborhood Services

POSTED

about 21 hours ago

DEADLINE

in 8 days
View Details
NAICS: 541350
New
Federal
H259-- ELECTRICAL 5-YEAR ARC FLASH STUDY (VA-27-00002938)
Solicitation # 36C25227Q0050
The Department of Veterans Affairs is seeking a firm fixed price contract modification for a comprehensive Arc Flash Hazard Analysis at the Iron Mountain VAMC. The project requires a Registered Professional Electrical Engineer with at least five years of experience to oversee the study, which must comply with NFPA 70E, NFPA 70, and IEEE 1584 standards. The scope encompasses all significant electrical distribution locations from the utility supply down to 208V systems, including switchgear, motor control centers, and panelboards. The contractor will perform data gathering and field verification, a three-phase bolted fault short-circuit study, a protective device coordination study, and the calculation of incident energy and flash protection boundaries. Key deliverables include the installation of machine-printed arc flash warning labels, the adjustment of protective devices, and a final comprehensive report featuring time-current curves, fault current calculations, and updated electrical one-line diagrams in AutoCAD and PDF formats. The contractor must also conduct an exit briefing for facility staff to discuss hazard areas and NEC violations. All work must be completed within 180 days of the notice to proceed, with onsite activities performed during normal business hours. This procurement is intended as a sole source award to SDV Services Inc. under 41 U.S.C. 1901 simplified acquisition procedures to ensure consistency with ongoing electrical testing at the facility.
252-NETWORK Contract Office 12 (36C252)

POSTED

1 day ago

DEADLINE

in 4 days
View Details
NAICS: 541350
New
Federal
Aviation Operations Center (AOC)- Building Engineer Report (BER)
Solicitation # 15DDHQ27R00000001
Solicitation 15DDHQ27R00000001 is a request for proposals from the Department of Justice, Drug Enforcement Administration, to obtain a Building Engineer Report (BER) for the Aviation Operations Center (AOC) located at Alliance Airport in Fort Worth, Texas. This is a 100% small business set-aside procurement conducted under FAR Part 12 for commercial services, with the government intending to issue a single firm fixed price purchase order. The scope of work requires a comprehensive inspection of the building's interior, exterior, and grounds, covering structural elements, HVAC, plumbing, electrical, life safety, and force protection. Key deliverables include a summarized BER based on a Building Condition Assessment with cost estimates and photographs, a detailed scheduled operations and maintenance plan, and a list of potential energy conservation improvements. Proposals must be submitted electronically to Jose Marin by November 30, 2026, and must be divided into a technical volume and a business volume. The technical volume is limited to 20 pages and will be evaluated based on technical capability, key personnel qualifications, and past performance. These non-price factors are significantly more important than price, although price will be evaluated for reasonableness. Award will be based on the best value to the government. Contractors must comply with strict security requirements, including the submission of Facility Access Request forms, execution of non-disclosure agreements, and completion of mandatory cybersecurity and privacy training. Performance is structured across several tasks, with the final BER due two weeks after the review meeting.
Office Acquisition Management

POSTED

1 day ago

DEADLINE

in about 1 month
View Details
NAICS: 541350
New
SLED
HSR26-26 Re-Bid #2 Fresno Building Inspection
Solicitation # HSR26-26
The California High-Speed Rail Authority is soliciting informal bids under solicitation HSR26-26 Re-Bid #2 for a comprehensive on-site building inspection and repair recommendation project for its Fresno Office located at 11111 H Street, Fresno, CA 93721. The selected contractor will be responsible for evaluating all major building systems, including plumbing, sewer, drainage, electrical, HVAC, roofing, security, the building envelope, and life-safety and structural components. Key deliverables include a comprehensive written inspection report with supporting photographs, an executive summary of critical risks, a prioritized list of corrective actions, and rough order-of-magnitude cost estimates for all recommended repairs. The project requires personnel knowledgeable in federal, state, and local building codes, as well as current safety and accessibility standards. The response deadline is November 6, 2026, and the solicitation is categorized under NAICS code 541350. Bidders must provide a valid Class A or Class B license from the California Contractors State License Board and submit several required documents, including a cost sheet, payee data record, and bidder certifications. Evaluation is based on cost reasonableness and past performance, with a 3% to 5% incentive applied for Disabled Veteran Business Enterprise participation. The contract includes strict compliance requirements regarding the Authority's Conflict of Interest Code, the Americans with Disabilities Act, and a ten-year confidentiality survival period. Invoicing is permitted monthly in arrears, and the final report is due five business days after the Authority provides feedback on the initial draft.
California High-Speed Rail Authority

POSTED

1 day ago

DEADLINE

in 8 days
View Details
NAICS: 541350
New
SLED
Operation and Management of the Building Department
Solicitation # AD-26-01
The City of Pembroke Pines is soliciting proposals under RFP AD-26-01 for the operation and management of its Building Department. The project utilizes a City-Provided Leadership Model, where the City retains the Chief Building Official and Building Department Operations Manager, while the contractor provides all other necessary administrative, clerical, and technical staff, including Assistant Building Officials, Trade Chiefs, Plan Reviewers, and Inspectors. The selected firm will be responsible for issuing permits, performing inspections, and executing statutory duties in accordance with the Florida Building Code and Broward County Amendments. The contract is for an initial five-year term with one five-year renewal option. Proposals are due by 2:00 pm on November 10, 2026, and must be submitted electronically via the City's e-Procurement Portal. Pricing is based on a proposed percentage of gross revenue derived from building permit fees, with specific daily rates established for key roles such as Assistant Building Officials at 1,500 dollars and Trade Chiefs at 1,000 dollars. Award decisions will be based on the most responsive and advantageous proposal, with preference points available for local Pembroke Pines vendors, Broward County vendors, and Veteran-Owned Small Businesses. Contractors must ensure all personnel have at least three years of relevant experience and hold required state and county certifications. Strict vehicle marking standards are required, including uniform colors and specific City of Pembroke Pines identification. The contractor must also implement a comprehensive Quality Assurance program to track performance metrics such as turnaround times and error rates. Required submittals include a Letter of Intent and a sworn Affidavit of Accuracy.
City Manager's Office

POSTED

3 days ago

DEADLINE

in 12 days
View Details

Earlier notices in this NAICS code

Posted before this notice, open and closed

Ready to Pursue This Opportunity?

Get AI-powered intelligence on this solicitation and the ones like it

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 750+ contractors already using CLEATUS