Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, November 11 at 2:00 PM ET

Register Free →

This Government Contract opportunity from Department Of The Interior was posted on August 28, 2002. The submission period has ended. Browse the details below for market research, or find similar active opportunities.

C--Indefinite Delivery Indefinite Quantity Architect-Engineering Services Contract for Civil/Environmental Engineering and Design Services

Awarded
N9000021600Federal

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

Active Opportunities Like This One

NAICS: 541330
New
SLED
Oso Parkway/Pacific Park Drive/Glenwood Drive Regional Traffic Signal Synchronization Project
Solicitation # 20261026016
The City of Aliso Viejo is soliciting proposals for a professional licensed consultant to provide regional traffic signal synchronization services for the Oso Parkway, Pacific Park Drive, and Glenwood Drive corridor. The project involves coordinating traffic signals across multiple jurisdictions, including the Cities of Aliso Viejo, Laguna Hills, Mission Viejo, Laguna Niguel, the County of Orange, and Caltrans, extending from Moulton Parkway to the SR-241 Northbound On-Ramp. The projected period of performance is from April 1, 2027, to September 30, 2030. The selected consultant will be responsible for providing all necessary labor, materials, and equipment to implement optimized signal timing in accordance with the Regional Traffic Signal Synchronization Master Plan and the City's Local Signal Synchronization Plan. Proposals are due by December 2, 2026, and must be submitted as one hard copy and one electronic PDF on a USB drive, with the cost proposal in a separate sealed envelope. Award decisions will be based on a weighted evaluation of the consultant's ability and skills, character and reputation, cost reasonableness, ability to meet time requirements, financial resources, and previous experience with the vendor. The contract is governed by the laws of the State of California with venue in Orange County. Key requirements include compliance with California prevailing wage laws, adherence to the City's Minority Business Enterprise program, and the submission of annual political contribution disclosures.
City of Aliso Viejo

POSTED

about 6 hours ago

DEADLINE

in about 1 month
NAICS: 541330
New
SLED
Buckhead CID Livable Centers Initiative Master Plan
Solicitation # 2026-10
The Buckhead Community Improvement District is soliciting proposals for the Buckhead Livable Centers Initiative Master Plan, a project aimed at updating the 2017 LCI plan to improve accessibility, walkability, and transit use. The scope of work focuses on the Buckhead and Lenox MARTA station areas and their connected mixed-use districts. Key deliverables include an existing conditions assessment report, a regulatory code study and audit, and the advancement of both a central gathering place/park plan and a walkable streetscape prototype to 30 percent completion. The total budget for this project is 300,000 dollars, with payments made via monthly invoices and progress reports. The project is funded through the Atlanta Regional Commission’s Livable Centers Initiative program and must adhere to federal regulations 49 CFR Part 18 and 49 CFR Part 26 regarding competitive procurement and Disadvantaged Business Enterprise participation. Additionally, the contractor must comply with the Georgia Security and Immigration Compliance Act and the Clean Air Act Amendments of 1990. The performance period begins with a notice to proceed on December 21, 2026, with a project kickoff in January 2027 and a final completion deadline of November 19, 2027. Selection will be based on the consultant's qualifications, prior experience, proposed approach, and understanding of the local Buckhead context.
Buckhead Community Improvement District

POSTED

about 7 hours ago

DEADLINE

in 16 days
NAICS: 541330
New
SLED
CITY OF ALAMO FY27 CDBG SEWERAGE
Solicitation # PE-66394-NONST-2027-000000011
The City of Alamo is soliciting statements of qualifications and proposals from engineering firms licensed in the State of Georgia to provide professional services for the improvement of the city's sewerage system. The scope of work involves providing preliminary design services for a potential FY27 Community Development Block Grant (CDBG) project, with the requirement that a draft Preliminary Engineering Report be submitted by January 15, 2027. If funding is secured, the selected firm will also be responsible for the subsequent design and construction management services. Proposals are due by November 30, 2026, and must include the firm's history, CDBG/EIP/RDF experience, key personnel qualifications, current workload, proposed scope of service, references, and associated fees or percentages. Evaluation of respondents is based on a point system assessing the firm's ability to provide necessary disciplines, experience with similar projects, quality of references, and price competitiveness. Additionally, firms must confirm they possess Errors and Omissions insurance and can meet the PER deadline. All contracts are subject to the provisions of the Georgia Department of Community Affairs and must comply with various federal and state laws regarding HUD Assisted Projects, including the Build America, Buy America Act, the Americans with Disabilities Act, and the Civil Rights Act of 1964. The primary point of contact for this solicitation is Bethany Newby.
City of Alamo

POSTED

about 9 hours ago

DEADLINE

in about 1 month

AI Contract Overview

Show more

The National Park Service Denver Service Center is seeking qualified civil and environmental architect/engineering firms for an Indefinite Delivery Indefinite Quantity contract to provide a broad range of design and consulting services across national parks primarily in California and Nevada, with occasional work in Hawaii, Guam, Saipan, American Samoa, Washington, Oregon, and Idaho. The contract encompasses projects involving water and wastewater systems, civil infrastructure such as roads and visitor facilities, surveying, environmental compliance including NEPA and Section 106, and geotechnical engineering. Services required span pre-design, design, construction documents, and construction management and must be performed by registered professionals licensed in the states where work occurs. The contract has a maximum total value of $5 million over a base year plus four option years, with individual task orders capped at $250,000 and a guaranteed minimum of $25,000. Sustainability is a critical focus, with firms expected to demonstrate expertise in sustainable design principles throughout planning, design, and construction, including energy and resource conservation and use of recycled materials. Evaluation criteria heavily weight professional qualifications, project management experience with integrated multidisciplinary teams, technical expertise in environmental and civil engineering, and proven performance with federal projects, particularly those sensitive to natural and cultural resources in diverse climatic regions. Small businesses and various minority-owned firms are encouraged to participate, and larger contractors must meet specified subcontracting goals. The solicitation requires submission of SF 254 and 255 forms addressing these qualifications, and selected firms must be prepared to handle complex, multi-year projects with attention to environmental compliance and sustainability mandates.

General Info

NPS seeks licensed civil/environmental firms for $5M sustainable infrastructure design in multi-state national parks.

Contract Value

$0

NAICS

541330 - Engineering Services

Place of Performance

CO, USA

Set-Aside

NONE

Awardee

PSOMAS

Award Issued Date

Documents

0

No documents available

Documents will appear here when they are available.

AI Contract Breakdown

Uniform Contract Format

No documents to break down

The breakdown needs solicitation documents. None were found from this contract's source.

Timeline

PhaseAwarded
Posted

Presolicitation

Awarded

Contract was awarded

Submission Closed

Find active opportunities like this

Get full access to discover similar active contracts, track opportunities, and build proposals with AI assistance.

Organization & Contact Information

Show more
AgencyDepartment Of The Interior → Dsc Contracting Services Division
ContactsNo contacts available
OfficeDenver, CO, 80225, USA
Office AddressDenver, CO, 80225, USA
ContactsNo contact information available

Full Description

Show more
The National Park Service (NPS), Denver Service Center (DSC), 12795 West Alameda Parkway, Lakewood, Colorado, 80228, is seeking a qualified firm(s) organization(s) to provide Civil and Environmental Architect/Engineer (A/E) services under an Indefinite Quantity contract for a variety of projects within areas of national significance at locations primarily throughout the States of California and Nevada, and also on a limited basis, the areas of Hawaii, Guam, Saipan, American Samoa, Washington, Oregon, and Idaho. The lead firm(s) selected for contract award will be predominately Civil and Environmental design firm(s) as the majority of services to be performed under this contract(s) will be Civil/Environmental in nature. The Government may elect to award a single task order contract or to award multiple task order contracts to one or more sources under this solicitation. The Government reserves the right to award contracts, based on the selection board's final selection list, in order of preference, to the firms considered most highly qualified to perform the work. Each awardee shall be provided a fair opportunity to be considered for task orders to be issued. The Government will use such factors as experience, qualifications, past performance, environmental sensitivity, quality of deliverables, timeliness, geographic location, and other factors that the Contracting Officer, in the exercise of sound business judgement, believes are relevant to the placement of orders. TYPES OF PROJECTS: Projects may include, but are not limited to: A. Water supply, treatment, distribution, and storage systems; B. Wastewater collection, treatment, and disposal facilities; C. Wastewater reclamation and reuse (both potable and nonpotable facilities); and D. Water and wastewater pumping facilities. As an example of the size of projects for Parts A through D, above, the size will range from very small (5,000 gallons per day capacity) to larger (over one million gallons per day capacity). Complexity will range from that of groundwater wells with disinfection to complete treatment facilities for surface water sources, or desalination, and from that of on-site septic tank/drainfield systems to wetlands, lagoons, alternative and/or advanced wastewater treatment processes, and conventional wastewater treatment facilities. Projects will also include, but are not limited to: E. Rehabilitation and new construction of Visitor Centers, Administrative Facilities, Maintenance Facilities, Comfort Stations, Residences, Campgrounds, Utility Infrastructure, Marine Facilities and other structures and facilities constructed at NPS Units; F. Roads, intersections, and parking areas; G. Surveying may include, but is not limited to, ground surveys, boundary surveys, aerial photography and aerial topographic surveys, global positioning systems (GPS) surveys, preliminary and final design layouts, construction layouts, as-built surveys, hydrographic and hydrologic surveys, and technical assistance; H. Drainage and stormwater management systems; I. Environmental Engineering and Compliance Permitting, including hazardous materials condition assessments and testing, underground storage tanks and system appurtenances, and air and water quality monitoring systems; J. National Environmental Policy Act (NEPA) and Section 106 Compliance; and K. Geotechnical Engineering. REQUIRED DISCIPLINES: Required disciplines include professionals registered as Civil Engineers, Traffic Engineers, and Environmental Engineers. Subconsultant disciplines, which may be required for some projects include professionals registered in structural, electrical, mechanical, hydrologic, fire/safety, and process/instrumentation engineering; surveyors; geotechnical engineering; architecture; landscape architecture; construction management and cost control/estimating. Incidental services, e.g. AutoCAD drafting, word processing, cost estimating, etc., may be required in the performance of specific task order requirements. CONTRACT PERIOD: All services will be provided under an Indefinite Quantity contract. The base contract period will be for one year with options to extend for four additional one-year periods. Work will be ordered by issuance of firm fixed price or not to-exceed type task orders. The maximum ordering limitation will be $5,000,000.00 for the life of the contract. Each task order will not exceed $250,000.00. The $5,000,000.00 maximum may be realized in a single year or spread out over the life of the contract including all option years. The guaranteed minimum for the life of the contract, which includes the base period and all options exercised, is $25,000.00. SUSTAINABLE DESIGN AND CONSTRUCTION PRACTICES: The U. S. Government has adopted sustainable design as the guiding principle for its planning, design and construction projects. By definition, this means meeting present needs without compromising the ability of future generations to meet their own needs. In practice, sustainable design utilizes best available solutions within the design tradition and conserves global resources, utilizes energy efficiently, recycles materials and waste, and specifies ecologically responsible methods, practices, and materials in the construction and operation of Government facilities. Accordingly, the selected firm(s)must exhibit current credentials and demonstrated competency in sustainable design certifications and membership in professionally recognized organizations that promulgate sustainable practices. The National Park Service, Pacific West Region has implemented Directive PW-048 which delineates how it emphasizes the concept of sustainability with respect to design and construction practices. Implementing sustainable design and construction practices is the constant process of identifying and incorporating activities and actions during facility planning, design, construction, and operation to meet the following goals: a. Consume less energy and natural resources over the life of the facility; b. Ensure that resources such as water, air and land are as clean or cleaner at the end of use as at the beginning; c. Ensure that the viability, integrity and diversity of natural systems are protected, undiminished and maintained; d. Ensure that natural sound-scape and dark skies are undiminished; e. Use green technologies and products that have less negative impacts on human health and the environment; f. Reduce the material entering landfills; and g. Ensure compliance with all natural and cultural requirements. EXECUTIVE ORDERS: In accordance with Public Law 100-418 and Executive Order 12770, as of January 1994, all federal design work will be done using the metric system of weights and measures. Work done under this contract may be subject to this requirement. The Government will not indemnify the firm selected against liability involving asbestos or other hazardous materials; that is, a clause holding the firm harmless will not be included in the contract. Executive Order 13101 - Greening the Government Through Waste Prevention, Recycling, and Federal Acquisition, (September 14, 1998). This Executive Order requires Federal Agencies to incorporate waste prevention and recycling in the Agency's operation and work to increase and expand markets for recovered materials through greater Federal Government preference and demand for such products. In developing work plans, work statements and specifications, Agencies must consider the - elimination of virgin materials requirements, use of bio-based products, use of recovered materials, reuse of product, lifecycle cost and lifecycle assessment, recycle ability, use of environmental preferable products, waste prevention and ultimate disposal. The Resource Conservation Recovery Act (RCRA), Section 6002 and Executive Order 13101 require the purchase of Environmental Protection Agency (EPA) designated products with a required minimum recovered material content as described in an Agency's Affirmative Procurement Program (APP). This list of EPA-designated products is available at http://www.epa.gov/cpg. This requirement applies to all contracts that require EPA-designated products. When purchasing a product or products on this list without the required minimum recovered minimum recovered material content, a written justification based on specific exemptions is required by FAR 23.405. A/E firms and their consultants are required to be familiar with EPA guidelines by developing specifications utilizing EPA's minimum recycled content standards. If products specified by the A/E do not meet EPA's guidelines, the A/E must prepare written justifications in accordance with FAR 23.405. A/E firms are to use life-cycle cost analysis, wherever feasible and appropriate to assist selection of products and services. Whenever possible, cost shall be calculated over the life of the item, not just the initial, up-front cost. When comparing alternative products, the initial cost of the acquisition as well as maintenance costs, operational costs, etc., must be considered in the analysis. A product having a higher initial cost may have lower operational costs or higher resale value and will, therefore, prove to be a better value and more cost effective compared to the alternatives. PRIMARY SERVICES REQUIRED: For the purpose of this contract, the services to be provided will be primarily Pre-Design, Compliance, and Supplemental Services (Title I Services), Design and Construction Documents (Title II Services), and Construction Management (Title III Services). All work and deliverables shall be stamped and sealed by Registered Professionals. All professionals shall be registered in the States in which the work is performed. Title I Services: Services in this category may include, but are not limited to, the preparation of conceptual, schematic, and preliminary design documents. This may include site and feasibility investigations; laboratory testing; pilot testing of water treatment systems; surveying; geotechnical studies; drilling of test/pilot wells; investigation and analysis of existing systems; research and analysis of pertinent Federal, State, and local regulations and codes; permitting; value analysis (engineering) and preliminary design, including alternatives analysis, schematic design and design development; preliminary drawings; and value and design analysis, including acquisition of data pertaining to local construction practices and material availability, outline specifications, and preliminary construction cost estimates; comparability cost analysis; NEPA and Section 106 Compliance; and peer review of NPS in house or other A/E designs. Title II Services: Services in this category may include, but are not limited to, the preparation of design development documents, construction drawings, and construction specifications and preparation of construction cost estimates for civil/environmental engineering projects, including repair, rehabilitation and modification of existing buildings, roads with associated parking, and utility systems; and peer review of NPS in-house or other A/E designs. Final construction documents (i.e., plans and specifications) must be furnished to the NPS in an electronic format capable of being transmitted over the Internet to the general public via electronic commerce. Title III Services: Services in this category may include, but are not limited to, construction management services, which include management from construction contract award to final acceptance of actions required to complete the proposed facility including the warranty period. This includes construction observation, review of submittals, value engineering, site visits, field testing, preparation of operation and maintenance manuals, construction support, and consultation during construction. Much of the work to be performed in historic buildings and sites will require continuous attention to compliance with historic preservation guidelines, techniques, and oversight. COORDINATION: The proposed work may extend over several fiscal years, involving projects at various stages, which will require that the selected firm(s) must be capable of providing and managing a multi-disciplinary team from within the firm or in conjunction with subconsultants. The A/E will need to have direct contact with federal, state or local regulatory agencies to assure compliance with regulations, codes and policies. TECHNICAL EVALUATION CRITERIA: Statements of Qualification will be evaluated by a selection committee of National Park Service personnel based upon the following primary criteria, listed in descending order of importance: A: Demonstrated professional qualifications, professional registration, technical expertise, and experience of the firm, including all principles and key staff of the firm, its consultants, and project personnel, with projects of types described both in urban and remote locations. Emphasis will focus on familiarity with and project experience in applying principles of sustainability in various climatic regions (for example, high mountains, heavy snow areas, arid deserts, and coastal) for the types of projects described and utilization of appropriate materials and construction techniques, with sensitivity to natural and cultural resources, as well as aesthetic considerations appropriate for National Park settings. B. Demonstrated project management experience and expertise with integrated design, with an emphasis on coordinating multidisciplinary teams, sub-consultant working relationships, establishment of up-front environmental goals, whole systems approach and follow-through. Demonstrated ability of the firm or organization to communicate, coordinate and facilitate work expediently. Demonstrated ability to design portions of a multidisciplinary design project independently, to participate in reviews, and to facilitate coordination into a multidisciplinary design project. C. Demonstrated experience and expertise in other technical aspects required under this contract, including construction management, drainage and stormwater management systems, environmental engineering and compliance, permitting, NEPA and Section 106 compliance, surveying, and geotechnical engineering, either in-house or by multidisciplinary teams and sub-consultants. Demonstrated specialized experience and technical competence in preparing, developing, and finalizing designs for facilities that minimize the use of, and the environmental impact on, the earth's renewable and non-renewable resources (water and electric conservation, solar energy, wind energy, etc.) and to the earth's managed resources. This includes to the maximum extent practicable, specifying the use of recycled content material and recovered materials, and providing designs for construction that promote energy conservation, pollution prevention, and waste reduction. D. Demonstrated good judgment in selection of treatment processes, that are appropriate for level of staffing, remoteness of facility, extreme climatic conditions, and other factors. E. Specific past performance on previous architect/engineering work performed for federal, state, and local government agencies, and private industry documenting the quality of the firm's work and the firm's history of meeting performance schedules and budgets. F. Demonstrated capacity to respond to short time frames and accomplish multiple simultaneous projects within desired schedules, while maintaining a high standard of quality of work and cost control. When responding to this announcement, firms should fully address their capability, capacity and qualifications with regard to each of the foregoing evaluation factors. This procurement is being made under the Small Business Competitiveness Demonstration Program (FAR 19.10) and is therefore open to both small and large business concerns. Small, small disadvantaged, women-owned small businesses, and service-disabled veteran-owned small businesses are encouraged to participate as prime contractors or as members of joint ventures with other small businesses. SUBCONTRACTING PLAN REQUIREMENT: In accordance with Public Law 97-507, the A/E Firm will be required to provide the maximum practicable opportunities for small, small disadvantaged, women-owned, and service-disabled veteran-owned small businesses. The selected firm, if a large business, must comply with FAR 52.219-9 regarding the requirement for a subcontracting plan on that part of the work it intends to subcontract. The subcontracting goals for this contract are that a minimum of 15% of the contractor's intended subcontract amount be placed with small business, 5% shall be placed with women-owned businesses, 5% be placed with small disadvantaged businesses, and 3% to be placed with service-disabled veteran-owned small businesses. The subcontracting plan is not required with this submittal; however, contract award is contingent upon negotiation of an acceptable subcontracting plan. SPECIALIZED SERVICES: In the course of doing business with Architect/Engineering firms under contract with the Denver Service Center, the DSC occasionally needs to obtain specialized services from subconsultants under the prime contract. In these instances, the majority of the work may be performed solely by the subconsultant with little involvement of the prime contractor. Even though the work is performed primarily by the subconsultant, DSC will ensure that the prime contractor is involved in all discussions and all correspondence is routed through the prime contractor. Prime contractors have indicated their concerns with the ceiling amounts and the effect these - pass-throughs would have on the cap. This has been taken into consideration in establishing the maximum contract amount for this solicitation and the resultant contract(s). Prime contractors submitting statements of qualifications are advised that the Denver Service Center will continue to acquire such specialized services in this manner. SUBMISSION REQUIREMENTS: Firms wishing to be considered must submit completed Standard Forms (SF) 254 and 255 and other PERTINENT information. Pertinent information submitted in support of the completed SF 254's and 255's should not exceed 15 pages. SF 254's and 255's must also be submitted for subconsultants. Clearly, specifically, and concisely address the evaluation criteria when completing the forms. Offerors are requested to submit one original of their submittal. Other marketing information such as booklets, pamphlets and brochures is neither requested nor desired. Submittals must be received in the contracting office by no later than 4:00 p.m. Mountain Standard Time, 30 days after issuance of this request in order to be considered for selection Note: This is not a Request for Proposals

More opportunities from Department Of The Interior → Dsc Contracting Services Division

Same awarding agency

NAICS: 237990
New
Federal
Y--Timucuan Ecological and Historic Preserve TIMU-335
Solicitation # 140P2026R0081
Solicitation 140P2026R0081 is a Small Business Set-Aside, Firm-Fixed-Price contract issued by the National Park Service for the stabilization of the Kingsley Plantation shoreline at the Timucuan Ecological and Historic Preserve in Jacksonville, Florida. The project, with an estimated construction magnitude between $1 million and $5 million, involves three primary components: the selective demolition and installation of a new weatherable rigid vinyl sheet pile wall with tie rods and a deadman wall, the eastward extension of the wall using structural FRP composite sheet piles, and comprehensive site restoration including excavation, backfilling, sodding, limestone riprap installation, and spartina sea grass restoration. The mandatory performance period is 259 calendar days, with work required to begin within 10 days of award. The government will utilize the Best Value Continuum Tradeoff Process for award, where non-price factors—specifically technical approach, schedule, and management approach—are significantly more important than price. Contractors must adhere to strict environmental protection protocols to protect marine mammals and endangered species, and comply with the Davis-Bacon Act and various ASTM standards for recycling and packaging. Key requirements include the submission of a Contractor Quality Control plan, the assignment of specific key personnel, and the provision of performance and payment bonds. Invoicing must be processed electronically through the U.S. Department of the Treasury's Invoice Processing Platform following a draft review by the Contracting Officer's Representative.
Other Heavy and Civil Engineering Construction

POSTED

about 14 hours ago

DEADLINE

in 16 days
View Details
NAICS: 221320
New
Federal
Y--GRCA 257282 - Replace Wastewater Plant at South Ri
Solicitation # 140P2026R0101
Solicitation 140P2026R0101 is an unrestricted full and open competition Invitation for Bid issued by the National Park Service, DSC Contracting Services Division, for the replacement of the South Rim Wastewater Treatment Plant at Grand Canyon National Park, Arizona. The project involves the construction of a GD Membrane Bio-Reactor wastewater treatment plant, including new treatment facilities, administrative and support buildings, and process systems. The scope of work encompasses complete demolition and removal of existing infrastructure, site preparation, grading, paving, fencing, and improvements to the facility access road. A critical requirement is that the existing plant must remain in permitted operation until the new facility is accepted by the government, and the contractor must provide a 12-month operational support period. The contract is a firm-fixed-price acquisition with a magnitude exceeding 100 million dollars. The mandatory period of performance is 1095 calendar days, scheduled from February 1, 2027, to February 1, 2030. Award will be based on a multi-factor, best-value tradeoff process evaluating technical experience, technical approach, key personnel experience, and price. Required deliverables include a detailed commissioning plan covering startup sequencing, operator training, and regulatory coordination. The contractor must furnish performance and payment bonds and comply with union prevailing wage rates, Department of the Interior cybersecurity requirements, and ADA/ABA accessibility standards.
Sewage Treatment Facilities

POSTED

about 14 hours ago

DEADLINE

in 21 days
View Details
NAICS: 237310
Federal
Z--BRCA 310427 Southbound Shuttle Stop
Solicitation # 140P2026R0065
Solicitation 140P2026R0065 is a small business set-aside for the construction of the Southbound Shuttle Stop at Bryce Canyon National Park, Utah. Managed by the National Park Service Denver Service Center, this firm-fixed-price contract has an estimated value between $1,000,000 and $5,000,000. The scope of work includes shuttle stop improvements, the addition of lanes, culvert installation, trail realignment, retaining wall construction, ADA ramp and sidewalk installation, and the placement of shelters and MUTCD-compliant signage. Due to the project's location, the contractor must implement protective measures for the adjacent UT Prairie Dog Habitat and ensure all equipment is clean and free of contaminants. The performance period is scheduled from May 1, 2027, to September 28, 2027, with a total duration of 150 calendar days following the notice to proceed. Award will be determined using the Best Value Continuum Tradeoff Process, evaluating technical approach, schedule, project experience, key personnel, and past performance alongside proposed pricing. Requirements include the submission of bid, performance, and payment bonds, compliance with Davis-Bacon Act wage determinations, and adherence to OSHA safety standards. Proposals must be submitted electronically in separate technical and price volumes, with a final response deadline of November 3, 2026.
Highway, Street, and Bridge Construction

POSTED

13 days ago

DEADLINE

in 6 days
View Details
NAICS: 237110
Federal
Y--HAVO 326181 Rehabilitate Rainshed&Water Treatment
Solicitation # 140P2026R0091
Solicitation 140P2026R0091 is a firm-fixed-price construction contract issued by the National Park Service Denver Service Center to rehabilitate the Rainshed and Water Treatment System at Hawaii Volcanoes National Park. The project scope includes the rehabilitation of the rainwater catchment and water treatment systems, the replacement of Building 43 with a new metal building, and the replacement of Building 241 with a new open-air and CMU structure. Additional optional requirements include replacing the perimeter fence, repairing the water treatment system, and replacing ground catchment pavement. The project has a mandatory performance period of 610 calendar days, with primary CLINs scheduled from November 1, 2026, to July 3, 2028. The government will award the contract using a best value tradeoff process, evaluating non-price factors such as project experience, technical approach, management approach, and construction schedule against proposed pricing. Bidders must comply with the Davis-Bacon Act for prevailing wages and adhere to Buy American Act and Build America Buy America standards. Technical requirements include ADA compliance, the implementation of a Quality Control Plan, and adherence to specific environmental standards regarding ozone-depleting substances and recycled content. Due to the site's nature, the project involves Section 106 mitigation for historic buildings and requires careful construction phasing to ensure water production is not compromised. Proposals must be submitted electronically, and the awardee will be required to provide performance and payment bonds within 10 days of award.
Water and Sewer Line and Related Structures Construction

POSTED

16 days ago

DEADLINE

in 9 days
View Details
NAICS: 237310
Federal
Z--YELL 338223 - Bridge Preservation
Solicitation # 140P2026R0073
Solicitation 140P2026R0073 is a Small Business Set-Aside for bridge preservation services at Yellowstone National Park, Wyoming, managed by the National Park Service Denver Service Center. The project involves the rehabilitation of three specific bridges: Lava Creek, Thumb Creek, and an Unnamed Creek bridge. The scope of work includes concrete spall and structural repairs, crack sealing, stone masonry repointing, bridge expansion joint maintenance, painting of railings, and the application of epoxy overlays via hydro-demolition. Additional requirements include erosion repair, pavement markings, and strict traffic control. The anticipated period of performance is 155 calendar days from the Notice to Proceed, with an estimated contract value between $1 million and $5 million. The contract will be awarded using the Best Value Continuum Tradeoff Process, where non-price factors—specifically technical approach, project experience, key personnel, and past performance—are significantly more important than price. Required key personnel include a Site Superintendent with at least five years of experience and OSHA 30 certification, and a Traffic Control Supervisor with three years of experience meeting MUTCD standards. Contractors must adhere to strict work hour restrictions from 7 AM to 7 PM and comply with environmental protections for wildlife and cultural resources. Performance and payment bonds are required at 100 percent of the contract price, and the project is subject to Davis-Bacon Act labor standards. Proposals are due by October 30, 2026.
Highway, Street, and Bridge Construction

POSTED

16 days ago

DEADLINE

in 2 days
View Details
NAICS: 237110
Federal
Y--GRTE 237343 - Rehab 4 Lazy F Ranch
Solicitation # 140P2026R0098
Solicitation 140P2026R0098 is a Total Small Business Set-Aside for the rehabilitation of the historic 4 Lazy F Ranch in Grand Teton National Park, Wyoming, to provide employee housing. The project scope includes the comprehensive rehabilitation of one lodge, eight cabins, one garage, two outbuildings, and a water well structure. Key technical requirements involve structural repairs, historic preservation, and the installation of new potable water and wastewater systems, including a sanitary sewer collection system and lift station. The project is estimated to exceed 10 million dollars and has a mandatory negotiable performance period of 170 calendar days, with work beginning within 10 days of award. The procurement will be awarded using the Best Value Continuum Tradeoff Process, where non-price factors—technical approach, project experience, schedule, and past performance—are collectively equal in importance to price. Contractors must adhere to strict environmental and safety standards, including the management of lead-based paint and asbestos, compliance with the Davis-Bacon Act, and mitigation of impacts on bald eagle nesting and roosting bats. Proposals must be submitted electronically by November 20, 2026, and must include a detailed technical approach and a phasing plan to minimize park operational disruptions. Required insurance includes general liability of 500,000 dollars and employer liability of 100,000 dollars.
Water and Sewer Line and Related Structures Construction

POSTED

24 days ago

DEADLINE

in 23 days
View Details

Earlier notices in this NAICS code

Posted before this notice, open and closed

Find Active Opportunities Like This

Get AI-powered intelligence on the opportunities still open

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 750+ contractors already using CLEATUS