Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, October 28 at 2:00 PM ET

Register Free →

This Pre-Solicitation opportunity from Department Of Agriculture was posted on March 24, 2023. The submission period has ended. Browse the details below for market research, or find similar active opportunities.

Caldor Suppression Repair and GAOA John Don't

Closed
12363N23R4006Federal

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

Active Opportunities Like This One

NAICS: 237310
New
Joliet Job Corps-Request for Quote Parking Lot and Road Repairs
Solicitation # joliet-job-corps-request-quote-parking-lot-road-repairs
Management & Training Corporation (MTC) is seeking bids for a subcontracting opportunity to perform road and parking lot repairs at the Joliet Job Corps Center in Illinois. This fixed-price, single lump sum contract has an estimated value between $100,000 and $250,000. The scope of work includes asphalt pavement replacement covering approximately 62,500 square feet across five key areas, including the guard shack, dorm parking lot, and kitchen/BCT areas. Additionally, the contractor must repair five storm sewer drain structures and five potholes, ensuring all work meets industry standards and proper drainage grades. The project must be completed within 90 consecutive business days following a written Notice to Proceed. Bids will be evaluated based on overall best value, and submission requires a signed MTC Bid for Lump Sum Contract form, a detailed cost breakout on company letterhead, and proof of a mandatory physical site visit. For bids equal to or exceeding $25,000, a bid bond of 20% is required, and the awarded contractor must provide performance and payment bonds from a surety with at least an A- rating. This opportunity is set aside for small businesses, including VOSB, SDVOSB, WOSB, and HUBZone certified firms. Compliance with Construction Wage Rate Requirements (CWRR) is mandatory, requiring weekly certified payroll and adherence to prevailing wage determinations. Final payment is contingent upon a successful final inspection and the submission of operation and maintenance manuals.
Joliet Job Corps

POSTED

about 10 hours ago

DEADLINE

in about 18 hours
NAICS: 237310
New
SLED
Environmental Trust Department, Owhi Flats 2026
Solicitation # Owhi-Flats-RFB-2026.pdf
The Confederated Tribes of the Colville Reservation Environmental Trust Department is soliciting bids for the Owhi Flats 2026 project, a firm fixed price construction contract focused on watershed restoration within the Little Nespelem WMU. The primary objectives are to improve water quality, enhance riparian habitats, promote natural water flow, and reduce the impact of open-road density on wildlife. The scope of work requires the contractor to decommission six road segments totaling 3.29 miles, install two tank traps, and transport all removed non-natural materials, such as culverts and fencing, to a COR-approved disposal facility. All activities must adhere to specific Colville Indian Reservation Tribal Law and Order Codes regarding cultural resources, forest practices, water quality, hydraulic practices, fire management, and industrial safety, as well as 43 CFR 10.4 for inadvertent discoveries. This is an Indian Preference set-aside under the Tribal Employment Rights Ordinance (TERO), requiring a minimum of 51 percent of seasonal or project-based employees to be of Indian preference origin. Award will be granted to the lowest, responsive, and responsible bidder who demonstrates technical experience in stream crossings, road cross drainage, and bank stabilization. Bidders must submit a comprehensive packet by October 29, 2026, including a signed bid sheet for the entire project, a detailed work plan with equipment and schedules, TERO certification, a debarment form, and proof of liability insurance of at least 1,000,000 dollars. The Contracting Officer Representative (COR) will oversee material acceptance and work plan approval to ensure compliance with environmental and safety standards.
Confederated Tribes of the Colville Reservation

POSTED

about 11 hours ago

DEADLINE

in 8 days
NAICS: 237310
New
SLED
FY 2027 Asphalt Resurfacing Program
Solicitation # BCFY27-17
The Boone County Fiscal Court is soliciting bids for the FY 2027 Asphalt Resurfacing Program, solicitation number BCFY27-17, to perform milling and paving services on identified county roads and streets. The scope of work includes improving profiles and cross sections using Class 2 Asphalt Surface 0.38D PG64-22, which involves milling existing pavement at a minimum width of six feet from the gutter line, road preparation, and the installation of trackless tack coat. The contractor is also responsible for adjusting manholes, drainage structures, and valve boxes, as well as providing pavement markings and temporary traffic control in accordance with KYTC and MUTCD standards. The project is scheduled for a purchase order issuance on December 1, 2026, with a final completion deadline of June 1, 2027. Eligibility is limited to contractors prequalified by the Kentucky Transportation Cabinet. Bidders must submit an electronic bid bond equal to 5% of the bid, and the successful awardee must provide a surety bond for 100% of the contract amount from a Kentucky-licensed surety. The contract will be awarded to the lowest responsive and responsible bidder, with considerations for Kentucky resident and qualified bidder preferences. Required submittals include a W-9 form, a certificate of insurance, and a Critical Path Method schedule. Performance is subject to strict quality inspections regarding mix design, compaction, and ride quality, with a penalty of 2,500 dollars per day for failure to complete the work by the final deadline.
Public Works

POSTED

about 11 hours ago

DEADLINE

in 21 days
NAICS: 237310
New
SLED
Main Street Concrete Curbing, Sidewalk, and Driveways.
Solicitation # 27-02
The City of Bartow, Florida, has issued solicitation 27-02 for the Main Street Concrete Curbing, Sidewalk, and Driveways project. This initiative focuses on improving roadway conditions, pedestrian accessibility, and compliance with current standards along Main Street, extending from Highway 60 west to the railroad crossing east of Highway 17. The scope of work includes full roadway repaving and the installation or replacement of concrete curbing, sidewalks, and driveways. All work must adhere to the 2026 FDOT Standard Specifications for Road and Bridge Construction, specifically FDOT Curb and Gutter 300 and Sidewalk 310, as well as MUTCD requirements for traffic management. The successful bidder must provide all labor, materials, equipment, and supervision, including the development of a City-approved Maintenance of Traffic plan and the restoration of all disturbed areas. The contract will be awarded to the lowest responsive and responsible bidder, with preferences afforded to Veteran Business Enterprises and Women/Minority Business Enterprises. Bidders must have been in business under the same name and tax identification number for at least three years. Required submittals include a variety of affidavits and certifications, such as non-collusion, drug-free workplace, and trench safety compliance. Financial security requirements include a bid bond for the submission and performance and payment bonds for contracts exceeding 250,000 dollars. Insurance carriers must maintain an AM Best Rating of A-VII or better. Compensation is based on unit prices applied to actual field measurements, and combined overhead and profit for change orders are capped at 10 percent. Responses are due by November 25, 2026, via the OpenGov portal or in-person delivery to the City of Bartow.
Public Works

POSTED

about 11 hours ago

DEADLINE

in about 1 month

General Info

Contract Value

$4,516,024.3

NAICS

237310 - Highway, Street, and Bridge Construction

Place of Performance

DC

Set-Aside

SBA

Award Issued Date

Documents

18

Caldor Fire Suppression Repairs Drawings

PDF, High priority: read this firstspecifications
High

Caltrans Class II Aggregate Base Specification

PDF, High priority: read this firstspecifications
High

Final Wage Determination CA20230007 for California Construction

PDF, High priority: read this firstwage-determination
High

Fire Plan for Contract Area Fire Prevention and Suppression

PDF, High priority: read this firstfire-plan
High

Forest Service FP-14 Construction Specifications Table of Contents

PDF, High priority: read this firstspecifications
High

John Dont Road Reconstruction Plans Revised

PDF, High priority: read this firstspecifications
High

John Dont Supplemental Specifications

DOCX, High priority: read this firstspecifications
High

RFP 12363N23R4006 Caldor Suppression Repair and GAOA John Don't Project

PDF, High priority: read this firstrfp
High

RFP 12363N23R4006 Caldor Suppression Repair and GAOA John Don't Project

PDF, High priority: read this firstrfp
High

Sec+813 Spot Surfacing Work Description

PDF, High priority: read this firstspecifications
High

Sec 835 Roadway Drainage Maintenance SOW

PDF, High priority: read this firstsow
High

Sec+839 Restore Drainage Functions Maintenance Specification

PDF, High priority: read this firstsow
High

Section 814 Asphalt Pavement Patching Specifications

PDF, High priority: read this firstspecifications
High

Caldor Fire Suppression Repairs Road Log

PDF, Low priorityroad-log
Low

John Don't Option 2 Project Map - Road Reconditioning and Forest Roads

PDF, Low priorityother
Low

John+Dont+Base+Project+Map.pdf

PDF

John+Dont+Option+1++Project+Map.pdf

PDF

Map+Caldor+Fire+Suppression+Repairs_1.pdf

PDF

AI Contract Breakdown

Uniform Contract Format

Contract not broken down yet

CLEATUS splits the solicitation into Uniform Contract Format (UCF) sections: scope, pricing, deliverables, and evaluation criteria.

Timeline

1 update
PhaseClosed
Posted

Presolicitation

Deadline changed

Response deadline changed from Mar 31, 2023 to Apr 25, 2023.

Response Deadline

Deadline has passed

Submission Closed

Find active opportunities like this

Start your free trial to discover similar active contracts, track opportunities, and build proposals with AI assistance.

Organization & Contact Information

Show more
AgencyDepartment Of Agriculture → Stewardship Contracting Branch Usda-Fs
Contacts1 person available
OfficeWashington, DC, 202501138, USA
Office AddressWashington, DC, 202501138, USA

Full Description

Show more
PROJECT DESCRIPTION: Caldor Suppression Repair and GAOA John Don't Caldor Suppression Repair Project consists of furnishing all labor, materials, equipment, tools, transportation, incidentals, inspection, quality control and supplies necessary to complete the suppression repairs after the Caldor Fire. Contractor shall restore the drainage functions, clean ditches, leadoffs, and culverts of Forest Service roads. Contractor shall deliver aggregate for spot surfacing, deliver asphalt to repair potholes and skin patching. The contractor shall provide the materials to do a single course chip seal, fog seal, asphalt concrete overlay, and striping. Due to the recent fires, it is expected that contractors will encounter fallen trees across the road. Removing these trees off the road is considered incidental. GAOA John Don't Project consists of furnishing all labor, materials, equipment, tools, transportation, incidentals, inspection, quality control and supplies necessary to complete the suppression repairs within the John Don't project area. Contractor shall recondition the existing roadway which includes cleaning ditches, re-establish drainage features, re-establishing and cleaning leadoff ditches, cleaning culverts, removing vegetation and debris off the roadway, outsloping, and blading and compacting existing Forest Service roadbed to restore drainage functions of the roadway. Contractor shall construct waterbars and rolling dips to drain water off the roadway. Contractor shall deliver aggregate for spot surfacing and deliver asphalt for asphalt pothole and skin patching. Contractor shall do linear grading which includes re-establishing the roadbed and road reconditioning. All work shall be in accordance with the contract requirements and within the contract time. Contractor shall, without additional expense to the government, be responsible for obtaining any necessary licenses, permits, which comply with any federal, state, and municipal laws, codes and regulations applicable to the performance of the work. Contractor is responsible for temporary traffic control and construction signs shall be in accordance with the latest version of MUTCD. PROJECT LOCATION: Caldor Suppression Repair The project is located within the Pacific, Placerville, and Amador ranger districts within the Eldorado National Forest. From Placerville, California, take Highway 50 east towards South Lake Tahoe for approximately 15 miles and exit Sly Park Road. Turn right onto Sly Park Road and travel for approximately 4.5 miles. Turn left on Mormon Emigrant Trail (NFS Road 10N50) to reach the project site. GAOA John Don't The project is located on the Pacific ranger district within the Eldorado National Forest. From Placerville, California, take Highway 50 east towards South Lake Tahoe for approximately 24 miles. Turn left onto Ice House Road and travel for approximately 10 miles to reach the project site. Contractors shall furnish all labor, supervision, equipment, materials, transportation, supplies (unless specified elsewhere as Government-furnished), and incidentals required to accomplish specified work in compliance with the terms, specifications, and provisions of the contract. Work is estimated to begin around June 2023. Engineering point of contact is Alvin Sarmiento, telephone: (530) 708-1363. NAICS 237310 with size standard $45 mil. This project is set aside 100% for small business.

More opportunities from Department Of Agriculture → Stewardship Contracting Branch Usda-Fs

Same awarding agency

NAICS: 113310
New
Federal
Corral G-Z Stewardship IRSC, Region 6, Fremont-Winema National Forest, Bly Ranger District, Bly , Oregon
Solicitation # 12363N26Q4181
Solicitation 12363N26Q4181 is a request for quotations for the Corral G-Z Integrated Resource Stewardship Contract (IRSC) within the Bly Ranger District of the Fremont-Winema National Forest in Oregon. This small business set-aside project follows the G to Z model to restore forest health and mitigate catastrophic wildfire risks by reverting stand density and species composition to historical ranges of variability. The scope of work includes professional forestry services such as harvest layout, timber marking, and cruising, as well as the commercial harvest and removal of approximately 191,379 tons of timber across 7,000 acres and fuels reduction on 17,000 acres. Specific restoration activities include whole tree yarding, removing encroaching conifers in meadows, and performing release cuts in whitebark pine stands. The government will award a firm-fixed price contract based on a best-value tradeoff, evaluating technical approach, relevant past performance from the last three years, and benefits to the local community within 60 miles of Bly, Oregon. The period of performance extends from the date of award through October 31, 2031. Key requirements include compliance with Federal Geographic Data Committee standards for geospatial deliverables, adherence to a strict fire plan, and following specific road maintenance and traffic control specifications. Performance is subject to a quality-based payment scale, where work quality below 85 percent is considered unacceptable and ineligible for payment. Quotes must be submitted as separate technical and price proposals by November 16, 2026.
Logging

POSTED

7 days ago

DEADLINE

in 27 days
View Details
NAICS: 113310
Federal
Bitterroot Front 10 Year G-Z IRSC
Solicitation # 12363N26R4014
Solicitation 12363N26R4014 is a Request for Proposal for the Bitterroot Front G-Z Long Term Integrated Resource Service Contract, a total small business set-aside under NAICS 113310. The project covers approximately 145,000 acres across the Stevensville and Darby Ranger Districts of the Bitterroot National Forest in Montana. The primary objectives are to reduce wildfire risk to nearby communities and restore forest health through thinning, harvesting, mechanical fuel reduction, and prescribed burning. Secondary goals include providing a consistent timber supply for local industries. The contract encompasses a wide scope of work, including unit layout, timber cruising, road reconstruction, and timber removal, with a period of performance spanning ten years from June 15, 2027, to October 15, 2037. The government will award the contract based on a best-value tradeoff decision, where non-price factors are approximately equal in importance to price. Technical evaluation focuses on the work activity plan, equipment suitability, key personnel experience, and quality control, alongside the benefit to the local community and relevant past performance. Mandatory road reconstruction work is estimated between 350,000 and 550,000 dollars. Contractors must comply with Davis-Bacon and Service Contract Act wage determinations and adhere to strict environmental and safety standards, including erosion control and OSHA requirements. Proposals must be submitted as separate technical and price volumes via email to the designated points of contact by October 22, 2026.
Logging

POSTED

8 days ago

DEADLINE

in 1 day
View Details

Find Active Opportunities Like This

Get AI-powered intelligence on the opportunities still open

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 750+ contractors already using CLEATUS