Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, November 11 at 2:00 PM ET

Register Free →

This Solicitation opportunity from Tennessee was posted on January 1, 1970. The submission period has ended. Browse the details below for market research, or find similar active opportunities.

Call 029 CN264036

Closed
CN264036State & Local

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

Active Opportunities Like This One

AI Contract Overview

Show more

The solicitation CN264036 issued by the Tennessee Department of Transportation (TDOT) seeks proposals for the installation of an overhead electrical distribution system in Henry, Tennessee, with work requiring operations around live facilities and strict adherence to safety protocols. The scope includes wood poles, conductor stringing, transformers, service equipment, line protection devices, and easement clearing, all to be executed per referenced standards including the National Electric Safety Code, NFPA 70, ASTM specifications, and Tennessee DOT standards. Contractors must submit detailed shop drawings, product data, operation and maintenance manuals in bound 8.5" x 11" format, and final as-constructed drawings updated to reflect all revisions, with electronic submissions limited to .DWG, .DGN, or .DXF files delivered on IBM-formatted 3½" diskettes or CD-ROMs. All materials must be new, traceable with manufacturer certifications, and protected against corrosion and damage during handling, with mill coatings and catalog data required for compliance. The contract imposes stringent EEO and affirmative action obligations under Executive Order 11246, mandating that contractors ensure non-discrimination in hiring, require union agreements to include EEO clauses, independently recruit qualified minority and female workers if referrals are insufficient, and prohibit the use of debarred subcontractors. Contractors must also comply with Davis-Bacon wage requirements, submit certified payrolls, retain payroll records for three years, and report subcontracts over $10,000 to the OFCCP within ten days. Training programs requiring 25% first-year trainees must be supported, with Form FHWA-1273 incorporated into all subcontracts. Inspection and acceptance occur on-site, with the contractor fully responsible for quality control, testing, and correction of deficiencies regardless of government observation. Proposals must be submitted to Clark Engineering & Utility Solutions, LLC, in Bolivar, Tennessee, with no formal contract value or pricing table provided, and no specified contract type such as FFP or IDIQ declared. The submission deadline matches the posted date, and no amendments or modifications are indicated.

General Info

TDOT contract for bid tab analysis and competitor pricing insights in Henry, Tennessee, deadline May 8, 2026.

Place of Performance

Henry, TN, USA

Set-Aside

NONE

Documents

11

Addendum #1 for CN264036 Henry County Project

PDF, High priority: read this firstamendment
High

Addendum #2 for CN264036 Henry County Railroad Protection Special Provisions

PDF, High priority: read this firstamendment
High

Addendum #3 for CN264036 Henry County Project

PDF, High priority: read this firstamendment
High

CN264036 - S.R. 54 Construction (Henry County)

PDF, High priority: read this firstitb
High

CN264036 Utility Specifications for Electric Utility Construction

PDF, High priority: read this firstspecifications
High

TDOT Asbestos Survey Report for Henry County Tract 17

PDF, High priority: read this firstasbestos-survey-report
High

Tennessee DOT Proposal Contract CN264036 for Henry County S.R. 54 Construction

PDF, High priority: read this firstrfp
High

CN264036_101886-05 Henry Tract 17 Clearance Letter Nov 2025

PDF, Low priorityclearance-letter
Low

Henry County Tract 4 Clearance Letter Jan 2026

PDF, Low priorityclearance-letter
Low

TDOT Asbestos Survey Report Tract 4 PIN 101886.05

PDF, Low priorityasbestos-survey-report
Low

CN264036_101886-05-Henry-GeotechReport.pdf

PDF

AI Contract Breakdown

Uniform Contract Format

Sign up to view the full breakdown with detailed analysis of each section.

Timeline

PhaseClosed
Posted

Solicitation

Response Deadline

Deadline has passed

Submission Closed

Find active opportunities like this

Get full access to discover similar active contracts, track opportunities, and build proposals with AI assistance.

Organization & Contact Information

Show more
AgencyTennessee → TDOT
ContactsNo contacts available
OfficeTN, USA
Organization / AgencyTennessee → TDOT
Office AddressTN, USA
ContactsNo contact information available

Full Description

Show more
Suite includes both Bid Tab Analysis and Competitor Insights.Search historical pricing for items and locations to crunch comparisons with other bidders for a competitive advantage.

Find Active Opportunities Like This

Get AI-powered intelligence on the opportunities still open

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 750+ contractors already using CLEATUS