Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, August 19 at 2:00 PM EDT

Register Free →

Caltrans D6 Issuance of an Encroachment Permit for CHSR Project - PG&E Utility Pole Rmvl & Install

Active
State & Local

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

AI Contract Overview

Show more

The project involves the issuance of an encroachment permit by Caltrans to support construction activities for the Merced to Fresno segment of the California High-Speed Rail Project, specifically related to the removal and installation of PG&E utility poles and the installation of traffic control signage in the State Highway right-of-way. The work includes temporary access to receiving pits east of the Union Pacific and Southern California Railway right-of-way and west of H Street, as well as staging equipment and materials beneath State Route 41 to facilitate jack-and-bore sewer installation between H and G Streets. Traffic control measures such as “Keep Right,” “Keep Left,” shoulder closure, and detour signage are required to safely manage roadway impacts during construction. The project’s place of performance is in Fresno, California, with work extending from Madera County through Fresno County, culminating south of State Route 41. Environmental compliance is a central requirement, mandating adherence to the California Endangered Species Act and the California Environmental Quality Act, with mitigation efforts directed toward protecting threatened species including the California tiger salamander, Swainson’s hawk, San Joaquin kit fox, and hairy Orcutt grass. The project is governed by a Notice of Determination issued on October 16, 2025, and supported by an Environmental Impact Report and Addendums 2013-1 and 2013-2, alongside an Incidental Take Permit from the California Department of Fish and Wildlife. No federal acquisition regulation clauses, contract pricing, payment details, or formal evaluation factors are present; all provisions relate to environmental permitting and state-level regulatory compliance. The California High-Speed Rail Authority is the lead agency, with key contact for environmental compliance located in Fresno and Sacramento, and submissions must be made by physical mail to designated Sacramento addresses. There is no specified contract value, delivery schedule, invoicing method, or personnel qualifications outlined beyond environmental oversight responsibilities.

General Info

Caltrans issues encroachment permit for High-Speed Rail utility work and traffic control in Fresno, with strict environmental compliance for protected species.

Agency

California High Speed Rail Authority

NAICS

237310 - Highway, Street, and Bridge ConstructionView NAICS

Place of Performance

CA

Set-Aside

NONE

Documents

(3)

Notice of Determination for California High Speed Train Project Amendment 22

PDFnotice-of-determination

Caltrans D6 Issuance of Encroachment Permit Notice of Determination

PDFdetermination-and-findings

Caltrans D6 Issuance of Encroachment Permit Notice of Determination

PDFdetermination-and-findings

AI Contract Breakdown

Uniform Contract Format

Sign up to view the full breakdown with detailed analysis of each section.

Timeline

1 update
Posted

forecast

Amendment 1

Contract was updated

Ready to pursue this opportunity?

Start your free trial to track this contract, build proposals with AI assistance, and manage your pipeline.

Organization & Contact Information

Show more
AgencyCalifornia High Speed Rail Authority
Contacts2 people available
OfficeN/A
Organization / Agency
California High Speed Rail Authority
Office AddressN/A
Contacts
Javier MendezSenior Environmental Scientist (Specialist)
Stefan Galvez-AbadiaDirector of Environmental Services

Full Description

Show more
The Project includes construction and operation of the Merced to Fresno segment of the HST. The Project is expected to result in impacts to California tiger salamander (Ambystoma californiense, CTS), Swainson's hawk (Buteo swainsoni, SWHA), San Joaquin kit fox (Vulpes macrotis mutica, SJKF), and hairy Orcutt grass (Orcuttia pilosa, HaOrGr) (collectively, the Covered Species). CTS, SWHA, and SJKF are species designated as threatened and HaOrGr is designated as endangered under CESA. Major Amendment No. 22 increases the Project footprint by 1.29 acres.

Similar Contracts

Same NAICS industry code

NAICS: 237310
New
LACSD Surface Water PFAS Removal Project No. 251, CA
Solicitation # lacsd-surface-water-pfas-removal-project-no-251-ca
The contract involves the design and construction of PFAS treatment facilities at the Bernina and Cedar Glen Water Treatment Plants in California, encompassing comprehensive civil, structural, mechanical, electrical, instrumentation, and process system upgrades to remove per- and polyfluoroalkyl substances from surface water. The scope requires integrated engineering solutions to meet evolving regulatory standards for drinking water safety, with specialized focus on advanced filtration and extraction technologies tailored to the existing infrastructure at both sites. Work will include site-specific modifications to ensure seamless operational integration while maintaining continuous water service during implementation. This solicitation, issued by Pyramid Building & Engineering, Inc., is designated for Disadvantaged Business Enterprises under the Department of Transportation set-aside program and falls under NAICS code 237310 for Water and Wastewater Pipeline and Related Structures Construction. Proposals must be submitted by September 3, 2026, with primary point of contact John Garrison available for inquiries via phone or email. The project is located entirely within California, with no specified city or zip details provided in the public record, and all contractual obligations are tied to performance at the two designated treatment plants. Participation is open to qualified firms seeking to support critical public health infrastructure improvements in compliance with state and federal water quality mandates.
Pyramid Building & Engineering, Inc.

POSTED

about 5 hours ago

DEADLINE

in 26 days
View Details