Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, September 30 at 2:00 PM EDT

Register Free →

Caltrans D6 Issuance of an Encroachment Permit for CHSR Project - PG&E Utility Pole Rmvl & Install

Active
State & Local

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

AI Contract Overview

Show more

The California High Speed Rail Authority is managing the construction and operation of the Merced to Fresno segment, which includes the removal and installation of PG&E utility poles. This project involves a specific alignment starting at the intersection of Avenue 19 and the BNSF Railway in Madera County and extending south to State Route 41 near Los Angeles Street in Fresno. Major Amendment No. 22 has increased the project footprint by 1.29 acres, necessitating compliance with the California Endangered Species Act due to impacts on the California tiger salamander, Swainson's hawk, San Joaquin kit fox, and hairy Orcutt grass. Under solicitation 2009091125, Caltrans District 6 has issued encroachment permits to enter the State Highway Right of Way for traffic control signage installation and restoration work. Key deliverables include the installation of PCMS boards, a lane closure on the SR 99 off ramp at Ashlan Avenue, and a full closure of the SR 99 off ramp at Golden State Boulevard. Additional permits cover traffic control signage on SR 41 in Fresno County. These specific encroachment activities have been determined to have no significant environmental effect, requiring no further mitigation measures or monitoring plans.

General Info

California High Speed Rail construction from Merced to Fresno involving utility and road permits.

Agency

California High Speed Rail Authority

NAICS

237310 - Highway, Street, and Bridge ConstructionView NAICS

Place of Performance

CA

Set-Aside

NONE

Documents

(3)

Notice of Determination for California High Speed Train Project Amendment 22

PDFnotice-of-determination

Caltrans D6 Issuance of Encroachment Permit Notice of Determination

PDFdetermination-and-findings

Caltrans D6 Issuance of Encroachment Permit Notice of Determination

PDFdetermination-and-findings

AI Contract Breakdown

Uniform Contract Format

Sign up to view the full breakdown with detailed analysis of each section.

Timeline

1 update
Posted

forecast

Notice updated

The notice description changed. The point of contact changed.

Ready to pursue this opportunity?

Start your free trial to track this contract, build proposals with AI assistance, and manage your pipeline.

Organization & Contact Information

Show more
AgencyCalifornia High Speed Rail Authority
Contacts2 people available
OfficeN/A
Organization / Agency
California High Speed Rail Authority
Office AddressN/A
Contacts
Javier MendezSenior Environmental Scientist (Specialist)
Stefan Galvez-AbadiaDirector of Environmental Services

Full Description

Show more
The Project includes construction and operation of the Merced to Fresno segment of the HST. The Project is expected to result in impacts to California tiger salamander (Ambystoma californiense, CTS), Swainson's hawk (Buteo swainsoni, SWHA), San Joaquin kit fox (Vulpes macrotis mutica, SJKF), and hairy Orcutt grass (Orcuttia pilosa, HaOrGr) (collectively, the Covered Species). CTS, SWHA, and SJKF are species designated as threatened and HaOrGr is designated as endangered under CESA. Major Amendment No. 22 increases the Project footprint by 1.29 acres.

Similar Contracts

Same NAICS industry code

NAICS: 237310
New
SLED
Citywide Slurry Seal Project (Cycle 1)
Solicitation # 26-03
The Citywide Slurry Seal Project (Cycle 1), identified as Capital Improvement Project No. 26-03, is a solicitation by the City of Downey, California, for the maintenance and improvement of various residential streets. The scope of work includes pavement surface preparation, crack sealing, the application of emulsified Type II slurry seal coat, and the construction of a 2-inch thick Asphalt-Rubber Hot Mix (ARHM-GG) pavement overlay. Additionally, the contractor is responsible for replacing traffic striping, pavement markings, and raised pavement markers, as well as implementing necessary traffic control. The project requires the contractor to furnish all labor, materials, and equipment, with a specific requirement to sweep all slurry sealed streets five to seven calendar days after application to remove loose aggregate. The contract will be awarded to the lowest responsible bidder who meets all technical specifications and provides a responsive proposal. Bidders must submit a bid bond of at least 10 percent of the bid amount and provide performance and payment bonds totaling 100 percent of the contract price upon award. Compliance with the California Labor Code regarding prevailing wages is mandatory, and the contractor must maintain workers' compensation and public liability insurance. The project includes a one-year warranty on all materials and workmanship. Final acceptance of the work is conducted by the City Council following an inspection and recommendation by the City Engineer.
City of Downey

POSTED

about 10 hours ago

DEADLINE

in 3 days
View Details

Ready to Pursue This Opportunity?

Get AI-powered intelligence on this solicitation and the ones like it

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 750+ contractors already using CLEATUS