Cecchetti Temporary Bridge Project (310014/ED25-0147)

Active
State & Local

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

AI Contract Overview

Show more

San Luis Obispo County is forecasting the installation of a temporary single-lane bridge over Arroyo Grande Creek to restore vehicular access on Cecchetti Road after a washout. The bridge will be modular, confined within the existing road footprint, and constructed with components such as decking, abutments, and railings designed for short-term use. It is intended to remain in place until the permanent bridge design is finalized, projected for 2027, at which time the temporary structure will be fully removed. Due to the bridge’s inability to handle high creek flows, it must be seasonally dismantled each winter and reinstalled in spring, requiring multiple mobilizations. Each installation or removal must strictly avoid disturbing the streambed, creek banks, and surrounding riparian habitat. The project is identified under reference number 310014/ED25-0147, with primary contact information provided through the county’s Environmental Programs Division Manager, Kate Shea.

General Info

Temporary bridge to restore road access, seasonally dismantled winter, removed by 2027, no habitat disturbance.

Agency

California → San Luis Obispo County

NAICS

237310 - Highway, Street, and Bridge ConstructionView NAICS

Place of Performance

Arroyo Grande, CA

Set-Aside

NONE

Documents

(1)

CEQA NOE Approved

PDF

AI Contract Breakdown

Uniform Contract Format

What is UCF?

Uniform Contract Format (UCF) uses AI to break down any contract into standardized sections—scope, pricing, deliverables, and evaluation criteria.

Timeline

Posted

forecast

Ready to pursue this opportunity?

Start your free trial to track this contract, build proposals with AI assistance, and manage your pipeline.

Organization & Contact Information

Show more
AgencyCalifornia → San Luis Obispo County
Contacts1 person available
OfficeN/A
Organization / Agency
California → San Luis Obispo County
Office AddressN/A
Contacts
Kate SheaEnvironmental Programs Division Manager

Full Description

Show more
The proposed project involves the temporary installation of a single-lane bridge over Arroyo Grande Creek to restore vehicular access along Cecchetti Road. The temporary structure will span the washed-out section of Cecchetti Road and will remain entirely within the existing roadway footprint. Bridge components—including decking, abutments, and railings—will be modular and designed for temporary use. The bridge will ultimately be removed upon completion of final design for a permanent bridge project, currently forecasted to be completed by 2027. Additionally, because the temporary bridge will not be capable of withstanding high flows in the creek, it may need to be removed in the winter. Therefore, this project description consists of the initial installation of the temporary bridge, any seasonal removal each winter, re-installation and final removal. Each mobilization effort must avoid impacts to the streambed, banks, and riparian area

Similar Contracts

Same NAICS industry code

NAICS: 237310
New
SLED
Citywide Slurry Seal Project (Cycle 1)
Solicitation # 26-03
The Citywide Slurry Seal Project (Cycle 1), identified as Capital Improvement Project No. 26-03, is a solicitation by the City of Downey, California, for the maintenance and improvement of various residential streets. The scope of work includes pavement surface preparation, crack sealing, the application of emulsified Type II slurry seal coat, and the construction of a 2-inch thick Asphalt-Rubber Hot Mix (ARHM-GG) pavement overlay. Additionally, the contractor is responsible for replacing traffic striping, pavement markings, and raised pavement markers, as well as implementing necessary traffic control. The project requires the contractor to furnish all labor, materials, and equipment, with a specific requirement to sweep all slurry sealed streets five to seven calendar days after application to remove loose aggregate. The contract will be awarded to the lowest responsible bidder who meets all technical specifications and provides a responsive proposal. Bidders must submit a bid bond of at least 10 percent of the bid amount and provide performance and payment bonds totaling 100 percent of the contract price upon award. Compliance with the California Labor Code regarding prevailing wages is mandatory, and the contractor must maintain workers' compensation and public liability insurance. The project includes a one-year warranty on all materials and workmanship. Final acceptance of the work is conducted by the City Council following an inspection and recommendation by the City Engineer.
City of Downey

POSTED

about 10 hours ago

DEADLINE

in 3 days
View Details

Ready to Pursue This Opportunity?

Get AI-powered intelligence on this solicitation and the ones like it

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 750+ contractors already using CLEATUS