Central Energy Plant Construction

Active
melbourne-orlando-international-airport-ITB-2026-0810-2026State & Local

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

AI Contract Overview

Show more

The Melbourne Orlando International Airport is soliciting a lump sum contract for the construction of a new Central Energy Plant to replace the MEP and HVAC systems of the original 1989 terminal. This specific phase of the project involves building an enclosed structure featuring new water cooled chillers, rooftop cooling towers, a new main electrical distribution panel, and the installation of a pre-purchased generator. The selected contractor must manage traffic maintenance and coordinate with other active contractors while ensuring that airport operations and airfield activities remain uninterrupted during construction. Interested parties must submit their responses by September 17, 2026, in accordance with solicitation number melbourne-orlando-international-airport-ITB-2026-0810-2026.

General Info

Lump sum contract for new Central Energy Plant at Melbourne Orlando International Airport.

Agency

Florida → Melbourne Orlando International AirportView Agency

NAICS

236210 - Industrial Building ConstructionView NAICS

Place of Performance

Not specified

Set-Aside

NONE

Documents

(0)

No documents available

AI Contract Breakdown

Uniform Contract Format

No contract breakdown available.

Cannot generate Contract Breakdown because no documents were found from this contract's source.

Timeline

PhaseSolicitation
Posted

Solicitation

Response Deadline

Submission deadline

Response Deadline

Ready to pursue this opportunity?

Start your free trial to track this contract, build proposals with AI assistance, and manage your pipeline.

Organization & Contact Information

Show more
AgencyFlorida → Melbourne Orlando International Airport
Contacts1 person available
OfficeN/A
Organization / Agency
Florida → Melbourne Orlando International Airport
View Agency Profile
Office AddressN/A
Contacts
Summer Wyllie-Vitt

Full Description

Show more
The Melbourne Airport Authority (MAA) is seeking to replace the MEP and HVAC systems within the original terminal that was constructed in 1989. Equipment has been prepurchased in the first phase of this multi-phase project. Phasing is based on the grant funding available from both State and Federal resources. This phase of work is to replace the Central Energy Plant (CEP) with an enclosed structure with new water cooled chillers and cooling towers on the roof. This phase of work will also create a new main distribution panel for the electrical serving the CEP and the existing 1989 terminal. A new generator, pre-purchased, will also be installed in this phase. This is a Lump Sum Contract. The successful bidder will be responsible for maintenance of traffic, coordination with other contractors that may be doing work within the area, and for providing maximum support to the Melbourne Airport Authority in maintaining their operations and other functions at times specified by the Owner during installation. Construction will occur while the airport is operational, and provisions will need to be made to accommodate existing airfield activities adjacent to the project zone.

Similar Contracts

Same NAICS industry code

NAICS: 236210
New
SLED
3199 Alvarado Street Industrial Project (PLN24-0030)
Solicitation # PLN24-0030
The project at 3199 Alvarado Street in San Leandro, California, involves the demolition of a 252,220-square-foot industrial building and its surface parking lot, followed by the construction of a new 241,488-square-foot industrial shell building with a designated floor area ratio of 0.40 and a maximum height of 46 feet. The new structure will include 221,488 square feet of warehouse and distribution space and 20,000 square feet of office space, designed to accommodate two tenants, each with private office entrances and access via separate driveways for trucks and passenger vehicles. Loading docks will be located on the north side of the building, and operations are expected to mirror the historical use of the site with similar daily activity levels and hours. The project must comply with Assembly Bill 98, which mandates specific design standards for warehouse developments near residential areas, as well as California environmental and safety regulations including Cal/OSHA lead standards, Bay Area Air Quality Management District rules, and CALGreen Tier 2 requirements. Environmental compliance is central to the project’s execution, with oversight by the City of San Leandro, California Department of Toxic Substances Control, and the Bay Area Air Quality Management District. Hazardous materials assessments, including lead-based paint and asbestos abatement, are required prior to demolition, and site remediation must conform to RCRA and USDOT transportation regulations. Supporting documentation includes a Draft Traffic Impact Analysis, historical environmental records, and references to California’s Urban Water Management Plan and Historical Resources Inventory. Public review is scheduled from July 21 to August 20, 2026, with submissions accepted by email or mail to the San Leandro Community Development Department and the State Clearinghouse. No formal contract value, pricing structure, or federal acquisition clauses are provided, and there is no assigned contracting officer, contracting officer’s representative, or detailed performance schedule. The project is administered under state and local regulatory frameworks rather than federal procurement directives, with Lourdes Juarez of the City of San Leandro serving as the primary point of contact.
City of San Leandro

POSTED

3 days ago

DEADLINE

N/A
View Details
NAICS: 236210
New
Federal
Tinker AFB 2026 Multiple Award Construction Contract (MACC)
Solicitation # FA8137-26-R-0040
The Tinker Air Force Base 2026 Multiple Award Construction Contract (MACC), solicitation FA8137-26-R-0040, is a competitive Indefinite Delivery Indefinite Quantity (IDIQ) vehicle for general construction services. The contract supports a broad range of sustainment, maintenance, repair, alteration, renovation, and minor construction projects at Tinker AFB, Oklahoma. Work is categorized into three execution methods: Design-Build, Construction with Limited Design, and Construction Only. The MACC has a total maximum value of 950 million dollars and consists of a five-year base ordering period with one five-year option, totaling a potential ten-year performance period. The procurement is divided into a Small Business Pool and a Full and Open Pool, with the latter available to both large and small businesses. Awards are based on the Highest Technically Rated Offeror (HTRO) methodology, where candidates must meet a Minimum Technical Threshold Rating (MTTR) of 8,190 points for Appendix C or 7,140 points for Appendix D. Evaluation focuses exclusively on technical experience, including relevant construction, design, certifications, and staffing, with no cost or price evaluation at the IDIQ level. Contractors are required to provide all labor, materials, and equipment necessary for project completion and must adhere to strict quality control standards, including the submission of a QC plan within 15 days of the notice to proceed. Performance and payment bonds are mandatory. Proposals must be submitted electronically via the PIEE Solicitation module by 1600 CST on September 11, 2026. All work must comply with Tinker AFB Facility Standards, AFMC mishap prevention programs, and federal regulations including the Buy American Act and ADA requirements.
FA8137 Afsc Pzioc

POSTED

3 days ago

DEADLINE

in 19 days
View Details