This Solicitation opportunity from Ohio was posted on October 19, 2026. The submission period has ended. Browse the details below for market research, or find similar active opportunities.

Central Sterile Supply - Offsite CSS Sterile Processing Expansion

Closed
https://dam.assets.ohio.gov/image/upload/ofcc.ohio.gov/Project_Opportunities/RFQs/2026/RFQ-OSU-266064.pdfState & Local

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

Active Opportunities Like This One

NAICS: 236220
New
SLED
Building 262 Renovations FLETC Glynco
Solicitation # 70LGLY27RSSB00001
The Building 262 Renovation project at the Federal Law Enforcement Training Center (FLETC) in Glynco, Georgia, is a total small business set-aside solicitation for a single firm fixed price contract. The scope of work involves a comprehensive interior modernization of Building 262, as well as associated buildings 261 and 263. Key deliverables include the replacement of corridor and classroom flooring with composite modular materials, full restroom remodeling including new vanities and lavatories, and the installation of raised flooring with integrated electrical distribution for classrooms. Additional requirements include updating doors and life-safety components, repainting interior surfaces, replacing variable air volume (VAV) systems, upgrading lighting controls, and correcting plumbing deficiencies. The period of performance is scheduled from January 11, 2027, to March 11, 2028, with a total duration of 425 calendar days after the Notice to Proceed. Proposals are due by November 18, 2026, and will be evaluated based on three equally important factors: past performance, corporate relevant experience, and price. Awardees must provide payment and performance bonds, and bidders are required to furnish a bid guarantee of 20 percent of the bid price or 3 million dollars. All work must comply with ADA accessibility guidelines and the FLETC Hazardous Waste Management Plan. Personnel are subject to background checks, including FBI fingerprinting and DHS non-disclosure agreements, to ensure the security of the federal facility.
Bristol Alliance of Companies

POSTED

about 3 hours ago

DEADLINE

in 19 days
NAICS: 236220
New
SLED
Repair Auto Maintenance Bldg 575
Solicitation # N40085-27-R-9000
Solicitation N40085-27-R-9000 is a fixed-price construction project for the repair and modernization of the Auto Maintenance Facility, Building 575, at Marine Corps Base Camp Lejeune, North Carolina. The comprehensive scope of work includes selective demolition, building envelope repairs, new roofing with a 20-year warranty, and exterior wall system updates. Interior improvements encompass reconfiguration, new finishes, epoxy mortar flooring, and the installation of a full NFPA-compliant fire suppression system. Critical infrastructure upgrades include new HVAC systems, exhaust extraction, compressed air systems, electrical distribution, lighting, low-voltage systems, and building automation controls. Additionally, the project requires site improvements such as paving removal and replacement, drainage upgrades, and hazardous materials abatement. The project has an estimated value between 10 million and 25 million dollars with a performance period of 730 days after award. Proposals are due by November 23, 2026, and will be evaluated based on the lowest price for two primary line items: building renovation and paving work. Bonding requirements are tiered, with proposals over 150 thousand dollars requiring bid, payment, and performance bonds. The contract is subject to the Davis-Bacon Act and Buy American requirements. Awarded contractors must adhere to strict quality control through a three-phase system and submit monthly invoices via Wide Area Work Flow with required NAVFAC certifications.
Bristol Alliance of Companies

POSTED

about 3 hours ago

DEADLINE

in 24 days
NAICS: 236220
New
Construction of the Recharge Master Plan Update Basin Improvements Project Montclair Basin Improvements
Solicitation # construction-recharge-master-plan-update-basin-improvements-project-montclair-basin-improvements-2
The Construction of the Recharge Master Plan Update Basin Improvements Project Montclair Basin Improvements is a solicitation issued by RT Contractor Corp for the Inland Empire Utilities Agency. This project, categorized under NAICS code 236220, is specifically set aside for Disadvantaged Business Enterprise (DBE) subcontractors. The place of performance is located in California, with the project area specifically identified as Riverside or Los Angeles. The solicitation was posted on October 30, 2026, with a response deadline of November 4, 2026. A critical component of this contract is strict adherence to DBE Good Faith Effort (GFE) requirements to secure project financing. Bidders must demonstrate comprehensive outreach, including posting solicitations in an online publication for 30 consecutive days and in a print newspaper for at least one day prior to the bid opening. Additionally, proof of utilizing the Small Business Administration and the Minority Business Development Agency must be included in the bid package. Failure to provide this proof or complete the GFE before the opening date will result in the bid being deemed non-responsive. While most documentation is due at the time of submission, outreach logs and correspondence may be submitted up to three business days after the bid closing date.
RT CONTRACTOR CORP

POSTED

about 3 hours ago

DEADLINE

in 4 days
NAICS: 236220
New
P084 NEXT GENERATION TORPEDO INTEGRATION LAB & P1016 Consolidated RDT&E Systems Facility – Newport, RI
Solicitation # p084-next-generation-torpedo-integration-lab-p1016-consolidated-rdte-systems-facility-newport-ri
J&J Contractors, Inc. is seeking pricing for the construction of the Next Generation Torpedo Integration Lab and the P1016 Consolidated RDT&E Systems Facility in Newport, Rhode Island. The project involves the development of a 12,920 square foot multi-story steel frame laboratory and office facility featuring a shallow foundation, metal standing seam roof, and exterior walls composed of masonry and metal panels. Comprehensive site improvements are required, including landscaping, parking, exterior lighting, telecommunications, and the installation of underground stormwater retention and utility systems. An additional option for the P1016 Consolidated RDT&E Systems Facility includes the construction of a 17,978 square foot laboratory with similar structural specifications and the demolition of Building 1272T, a 548 square meter engineering facility. Bids are requested across a wide range of scopes, including demolition, abatement, structural steel, mechanical, electrical, and plumbing. This is a small business set-aside solicitation subject to Davis Bacon Wage Rates and is exempt from sales tax. Interested parties must contact the primary point of contact to receive bid documents via Building Connected before the November 30, 2026 deadline.
J&J CONTRACTORS, INC.

POSTED

about 3 hours ago

DEADLINE

in about 1 month
NAICS: 236220
New
Water Damage Restoration
Solicitation # G26-005
Solicitation G26-005 is a request for a single lump sum contract to perform multi-floor water damage restoration in Building 17 at the Grafton Job Corps Center in North Grafton, Massachusetts. Operated by Adams and Associates, Inc. for the U.S. Department of Labor, the project aims to restore dormitory rooms, vanity areas, hallways, offices, and conference rooms to their original condition following a fire sprinkler discharge on June 13, 2026. The scope of work includes architectural repairs such as drywall replacement, painting, ceiling tile and flooring installation, rubber wall base installation, and necessary plumbing and electrical work. The total period of performance is 105 days, with substantial completion required within 90 days of the Notice to Proceed and final completion within an additional 15 days. This is an SBA set-aside opportunity open to Small Businesses, including VOSB, SDVOSB, WOSB, and HUBZone certified firms. Award will be based on Best Value, evaluated through price (60 points), quality (20 points), past performance (10 points), and schedule (10 points). Prospective bidders must attend a mandatory site visit on November 3, 2026, and submit proposals by November 17, 2026. Requirements include a valid Massachusetts Contractor's License, proof of specific automobile and general liability insurance, and compliance with the Davis-Bacon Act, OSHA, EPA, and NFPA-101 life safety codes. Payment terms are Net 30.
Grafton Job Corps

POSTED

about 3 hours ago

DEADLINE

in 17 days
NAICS: 236220
New
Springdale JCC –Dormitory Interior Renovation & Repairs
Solicitation # springdale-jcc-dormitory-interior-renovation-repairs
The Springdale Job Corps Center, operated by Career Systems Development Corporation for the U.S. Department of Labor, is soliciting proposals for the interior renovation and repair of the North Wing dormitory in Troutdale, Oregon. The project focuses on restoring water-damaged interior spaces to safe residential use, specifically targeting sixteen residential rooms and bathrooms, common areas, and mechanical rooms. The scope of work includes drywall installation, joint finishing, and painting for approximately 300 square feet of floor area, as well as the temporary disconnection and re-installation of HVAC equipment such as furnaces and water heaters. This solicitation is set aside for small businesses, including VOSB, SDVOSB, WOSB, and HUBZone certified firms. The project is subject to the Davis Bacon Act, requiring compliance with wage determination OR20260100 and the submission of weekly certified payrolls. Awarded contractors must provide payment and performance bonding for the full project value within ten days of award, along with general liability insurance of at least one million dollars per occurrence and three million dollars general aggregate. Proposals must include detailed relevant experience, a comprehensive work plan addressing project phasing and occupied-building protection, and itemized pricing by room and trade. Final acceptance by CSD requires a minimum one-year workmanship warranty and successful testing of all restored mechanical, plumbing, electrical, and life-safety systems.
Career Systems Development Corporation

POSTED

about 3 hours ago

DEADLINE

in 20 days
NAICS: 236220
New
P1102 Weapons Magazine and Ordnance Operations Facility, Naval Submarine Base New London, Groton, Connecticut
Solicitation # p1102-weapons-magazine-ordnance-operations-facility-naval-submarine-base-new-london-groton
J & J Contractors, Inc. is seeking pricing for the P1102 Weapons Magazine and Ordnance Operations Facility project at the Naval Submarine Base New London in Groton, Connecticut. This comprehensive construction project has a duration of 1828 calendar days and involves the creation of six Containerized Long Weapons Storage units, two Box G magazines, and one Box H earth-covered high-explosive magazine. The scope includes the construction of an Ordnance Operations building, a Truck Inspection facility, and a Sentry building, alongside the demolition of 18 existing magazines and two other buildings. Technical requirements encompass a wide range of trades, including demolition, abatement, structural steel, electrical, plumbing, and mechanical work. Key site features include rigid inclusions, load transfer mats, grounding and lightning protection, and intrusion detection systems. Site preparation involves rock excavation, grading, and mitigation for impacted wetlands, as well as the installation of access roads, paving, and telecommunications infrastructure. This solicitation is set aside for various small business categories, and interested parties should contact Rahul Maheshwari for bid documents.
J & J Contractors, Inc

POSTED

about 3 hours ago

DEADLINE

in about 2 hours

AI Contract Overview

Show more

Project OSU-266064 involves the expansion of sterile processing capabilities at the Central Sterile Supply facility located at 2814 Kenn Road, Columbus, Ohio. The scope of work includes the installation of two steam sterilizers, two washers, and two steam generators, with the generators located in the penthouse to support increased steam loads. The project requires the selected Construction Manager at Risk to manage preconstruction services, including constructability reviews, cost estimation, and the development of a Guaranteed Maximum Price, as well as full construction and closeout services. Equipment installation is anticipated by March 23, 2027. The selection process is a two-stage approach, beginning with a qualifications-based RFQ to create a short list of at least three candidates, followed by a best-value RFP process combining qualifications and fees. The Construction Manager must adhere to Ohio State University sustainability and safety standards, utilize the e-Builder project management system, and comply with Wexner Medical Center policies regarding background checks and vaccinations. Key requirements include participation in the EDGE program, adherence to prevailing wage laws, and the implementation of an open-book pricing method for all subcontracts. Submission of the Statement of Qualifications via Form F110-330 is required by October 30, 2026.

General Info

Construction manager needed for sterile processing expansion at OSU's Central Sterile Supply facility.

Place of Performance

Not specified

Set-Aside

NONE

Documents

1
PDF, High priority: read this firstrfq
High

AI Contract Breakdown

Uniform Contract Format

Sign up to view the full breakdown with detailed analysis of each section.

Timeline

PhaseClosed
Posted

Solicitation

Response Deadline

Deadline has passed

Submission Closed

Find active opportunities like this

Get full access to discover similar active contracts, track opportunities, and build proposals with AI assistance.

Organization & Contact Information

Show more
AgencyThe Ohio State University
Contacts1 person available
OfficeN/A
Organization / AgencyThe Ohio State University
Office AddressN/A
Contacts
Jamie WadeProject Manager

Full Description

Show more
Project number: OSU-266064
This project located at Central Sterile Supply, 2814 Kenn Road, Columbus, Ohio 43210, consists of the addition of two steam sterilizers, two washers, and two steam generators. The new sterilizers will be installed adjacent to the existing sterilizers on the north side of the first floor and shall be connected to existing power, steam mains, and water connections. The steam main serving the sterilizers shall require adding two new steam generators to account for the increased steam load. These steam generators shall be installed in the penthouse adjacent to or across from the existing steam generators and shall be connected to all required utilities. The two new washers shall be installed adjacent to the existing washers on the south side of the first floor and shall also be connected to existing power and water connections. Timelines with ordering and delivery of the washers and sterilizers will need to be timed closely to the installation of all equipment. Anticipated equipment installation is March 23, 2027. Professional design services are being acquired by the Contracting Authority under a separate contract. The Program of Requirements (“POR”) will be developed as a part of this project by the Architect/Engineer (“A/E”). All aspects of the project and related issues will be implemented and operated consistent with the Contracting Authority/Owner’s policies and procedures. This project includes asset tagging. The Primary firm submitting for the project is required to have the expertise capable of meeting this prerequisite and is responsible to support their subcontractors to meet this requirement. The Asset Tagging Process Diagram, Asset Worksheet Template, and LOD Matrix can be accessed via the OSU FOD website (https://fod.osu.edu/resources) under Design Guidelines, Specifications, Standards; Specifications and Standards; Building Information Modeling (BIM).
Scope of Services: The project and construction budget as listed in this RFQ is estimated. The project has been approved for design and construction services. This request is for Construction Manager at Risk (“CM”) to assist with preconstruction to establish the schematic design concept, begin design development, and construction documents. The university may amend the CM contract upon approval for bidding, construction contract administration and post-construction services. The selected Construction Manager at Risk, as a portion of its required Scope of Services and prior to submitting its proposal, will discuss and clarify with the Contracting Authority/Owner, the breakdown of the Agreement detailed cost components, to address the Owner’s project requirements and refine the project schedule. Participate in the Encouraging Diversity, Growth & Equity (EDGE) Program as required by statute and the Agreement. Submit the Statements of Qualifications (Form F110-330) via email to Central_Sterile_Supply_- contact@example.gov. In the subject line, include the project number and name for the RFQ you are responding to. See Section G of this RFQ for additional submittal instructions. Submit all questions regarding this RFQ in writing to Jamie Wade at contact@example.gov with the project number and name included in the subject line (no phone calls please). Questions will be answered and posted to Opportunities page on the OFCC website at Project Opportunities on a regular basis until one week before the response deadline. The name of the party submitting a question will not be included on the Q&A document. As required by the Agreement, and as properly authorized, provide the following categories of services: provide constructability review comments on documents produced by the A/E during the Schematic Design, Design Development, and Construction Document stages; develop and maintain estimates of probable construction cost, Target Value Budget/Target Value Design, project schedules, and construction schedules; lead and manage the Subcontractor Prequalification and Bidding process, Construction and Closeout Stage. Refer to the Ohio Facilities Construction Manual for additional information about the type and extent of services required for each. A copy of the standard Agreement can be obtained at the OFCC website at Construction Manager at Risk Agreements. The selected CM will be required to sign the standard agreement. No modifications to the requirements in the agreement will be accepted. Required Professional Liability Insurance will be per General Conditions Articles 10.3.7 and 10.3.8. The project shall follow the applicable University Sustainability Standards: https://fod.osu.edu/sites/default/files/div_18.pdf. The project team (Owner / A/E / CM) will be required to utilize e-Builder, the University’s Project Management System, for all compatible services required by the University. The preconstruction and construction services are generally described below. Subcontracts including but not limited to Plumbing, Fire Protection, HVAC, Electrical and AV/Technology will be awarded by the CM to prequalified vendors using a competitive process. The parties will engage in an "open book" pricing method in which all subcontracted work shall be based upon competitive pricing that will be reviewed by the Contracting Authority/Owner, the A/E and the CM. The Contracting Authority/Owner shall have access to all books, records, documents and other data in the CM's possession related to itself, its subcontractors and material suppliers pertaining to bidding, pricing or performance of the Agreement. Preconstruction Services: The CM will work cooperatively with the Contracting Authority/Owner, A/E, and Project Team, and will provide, among other services, schedule development, estimate development, Guaranteed Maximum Price (GMP) proposal, subcontractor prequalification and bidding, constructability review, permits, budgeting, Target Value Budget/Target Value Design, and preconstruction planning throughout the preconstruction stages. When the drawings and specifications are at the stage of completion specified in the Agreement, such partially completed documents (the "Basis Documents") shall be provided to the CM, together with the A/E's detailed listing of any incomplete design elements and the A/E’s statement of intended scope with respect to such incomplete elements (the "Design Intent Statement"). Contingent upon the Contracting Authority’s approval of the GMP, the parties will enter into an amendment to the Agreement establishing the Contract Sum (“GMP Amendment”). If the proposed Contract Sum exceeds the Project Budget established for construction, then the Contracting Authority may terminate the agreement with the CM and seek proposals from other firms for completion of the Project. Construction Services: The CM shall construct the Project pursuant to the construction documents and in accordance with the schedule requirements. The CM shall hold all subcontracts and shall be fully responsible for the means and methods of construction, project safety, project completion within the schedule agreed upon in the preconstruction phase, compliance with all applicable laws and regulations including monitoring compliance with all EDGE, equal employment, and prevailing wage requirements, and submitting monthly reports of these activities to the Contracting Authority. All subcontracts shall be on the subcontract form prescribed by OAC Section 153:1-03-02. The Contracting Authority reserves the right to approve the CM’s selection of subcontractors and any supplemental terms to the form subcontract. The Ohio State University is dedicated to providing a safe and healthy environment for students, patients, staff, visitors and contractors. While not exclusive, guidelines governing safety expectations for construction/ renovation projects within Ohio State buildings are set forth in the Building Design Standards Appendix V and are summarized here: https://fod.osu.edu/resources, under the section titled “Construction Site Safety Requirements.” Closeout Services: The closeout for this project is required to be delivered in an electronic cloud-based format using e- Builder Project Management System and adhere to The Ohio State University Project Closeout Standards. The Ohio State University Project Closeout Standards can be accessed via the OSU FOD vender resource website (https://fod.osu.edu/resources) under Post Construction / Close Out. The CM will comply with applicable OSU Wexner Medical Center policies, including the Identification Badge Policy, which incorporates the Non-discretionary Vaccination Policy/Employee Health Infection Control and Background Check Policies, as identified at https://wexnermedical.osu.edu/utility/footer/vendor-interaction. The CM is responsible for all costs incurred related to compliance with these policies. For purposes of completing the Relevant Project Experience Matrix in Section F of the Statement of Qualifications (Form F110-330), below is a list of relevant scope of work requirements for this RFQ: 1. Role on Project CMR 2. Experience with projects in hospital/sterile environments 3. Experience managing healthcare projects with expedited timelines driven by medical equipment delivery, installation and operational readiness. For the purpose of the selection of 10 Relevant Projects in Section F of the Statement of Qualification (Form F110-330), projects must have been completed by the Construction Management Firm.

More opportunities from The Ohio State University

Same awarding agency

NAICS: 236220
New
SLED
Wooster - Fisher Aud Renovation
Solicitation # RFQ-OSU-200473
The Ohio State University is seeking a Construction Manager at Risk for the renovation of the Fisher Auditorium building on the CFAES Wooster Campus to create the Campus Commons. The project involves renovating approximately 18,000 square feet of space to include a library, learning lab, bookstore, offices, food service, dining, and lounge areas, while maintaining the original auditorium. A potential 3,000 square foot addition on the north side is being considered to improve campus circulation and accessibility. The project requires a collaborative BIM-enabled environment following university standards, including specific use cases for model authoring, clash prevention, and asset tagging. The procurement process is divided into two stages, beginning with a qualifications-based RFQ to establish a short list of at least three candidates, followed by a best-value RFP stage considering both qualifications and fees. The selected CM will initially provide preconstruction services, including constructability reviews, target value budgeting, and schedule development, with the possibility of a contract amendment for full construction and closeout services. Key requirements include participation in the EDGE program, use of the e-Builder project management system, and adherence to university sustainability and safety standards. Preconstruction services are slated to begin in March 2027, with substantial completion of all work targeted for April 2029.
Commercial and Institutional Building Construction

POSTED

3 days ago

DEADLINE

in 17 days
View Details

Find Active Opportunities Like This

Get AI-powered intelligence on the opportunities still open

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 750+ contractors already using CLEATUS