This Solicitation opportunity from Ohio was posted on October 19, 2026. The submission period has ended. Browse the details below for market research, or find similar active opportunities.
Central Sterile Supply - Offsite CSS Sterile Processing Expansion
Contract Overview
Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.
Active Opportunities Like This One
AI Contract Overview
Project OSU-266064 involves the expansion of sterile processing capabilities at the Central Sterile Supply facility located at 2814 Kenn Road, Columbus, Ohio. The scope of work includes the installation of two steam sterilizers, two washers, and two steam generators, with the generators located in the penthouse to support increased steam loads. The project requires the selected Construction Manager at Risk to manage preconstruction services, including constructability reviews, cost estimation, and the development of a Guaranteed Maximum Price, as well as full construction and closeout services. Equipment installation is anticipated by March 23, 2027. The selection process is a two-stage approach, beginning with a qualifications-based RFQ to create a short list of at least three candidates, followed by a best-value RFP process combining qualifications and fees. The Construction Manager must adhere to Ohio State University sustainability and safety standards, utilize the e-Builder project management system, and comply with Wexner Medical Center policies regarding background checks and vaccinations. Key requirements include participation in the EDGE program, adherence to prevailing wage laws, and the implementation of an open-book pricing method for all subcontracts. Submission of the Statement of Qualifications via Form F110-330 is required by October 30, 2026.
General Info
Place of Performance
Not specifiedSet-Aside
Timeline
Submission Closed
Organization & Contact Information
Full Description
This project located at Central Sterile Supply, 2814 Kenn Road, Columbus, Ohio 43210, consists of the addition of two steam sterilizers, two washers, and two steam generators. The new sterilizers will be installed adjacent to the existing sterilizers on the north side of the first floor and shall be connected to existing power, steam mains, and water connections. The steam main serving the sterilizers shall require adding two new steam generators to account for the increased steam load. These steam generators shall be installed in the penthouse adjacent to or across from the existing steam generators and shall be connected to all required utilities. The two new washers shall be installed adjacent to the existing washers on the south side of the first floor and shall also be connected to existing power and water connections. Timelines with ordering and delivery of the washers and sterilizers will need to be timed closely to the installation of all equipment. Anticipated equipment installation is March 23, 2027. Professional design services are being acquired by the Contracting Authority under a separate contract. The Program of Requirements (“POR”) will be developed as a part of this project by the Architect/Engineer (“A/E”). All aspects of the project and related issues will be implemented and operated consistent with the Contracting Authority/Owner’s policies and procedures. This project includes asset tagging. The Primary firm submitting for the project is required to have the expertise capable of meeting this prerequisite and is responsible to support their subcontractors to meet this requirement. The Asset Tagging Process Diagram, Asset Worksheet Template, and LOD Matrix can be accessed via the OSU FOD website (https://fod.osu.edu/resources) under Design Guidelines, Specifications, Standards; Specifications and Standards; Building Information Modeling (BIM).
Scope of Services: The project and construction budget as listed in this RFQ is estimated. The project has been approved for design and construction services. This request is for Construction Manager at Risk (“CM”) to assist with preconstruction to establish the schematic design concept, begin design development, and construction documents. The university may amend the CM contract upon approval for bidding, construction contract administration and post-construction services. The selected Construction Manager at Risk, as a portion of its required Scope of Services and prior to submitting its proposal, will discuss and clarify with the Contracting Authority/Owner, the breakdown of the Agreement detailed cost components, to address the Owner’s project requirements and refine the project schedule. Participate in the Encouraging Diversity, Growth & Equity (EDGE) Program as required by statute and the Agreement. Submit the Statements of Qualifications (Form F110-330) via email to Central_Sterile_Supply_- contact@example.gov. In the subject line, include the project number and name for the RFQ you are responding to. See Section G of this RFQ for additional submittal instructions. Submit all questions regarding this RFQ in writing to Jamie Wade at contact@example.gov with the project number and name included in the subject line (no phone calls please). Questions will be answered and posted to Opportunities page on the OFCC website at Project Opportunities on a regular basis until one week before the response deadline. The name of the party submitting a question will not be included on the Q&A document. As required by the Agreement, and as properly authorized, provide the following categories of services: provide constructability review comments on documents produced by the A/E during the Schematic Design, Design Development, and Construction Document stages; develop and maintain estimates of probable construction cost, Target Value Budget/Target Value Design, project schedules, and construction schedules; lead and manage the Subcontractor Prequalification and Bidding process, Construction and Closeout Stage. Refer to the Ohio Facilities Construction Manual for additional information about the type and extent of services required for each. A copy of the standard Agreement can be obtained at the OFCC website at Construction Manager at Risk Agreements. The selected CM will be required to sign the standard agreement. No modifications to the requirements in the agreement will be accepted. Required Professional Liability Insurance will be per General Conditions Articles 10.3.7 and 10.3.8. The project shall follow the applicable University Sustainability Standards: https://fod.osu.edu/sites/default/files/div_18.pdf. The project team (Owner / A/E / CM) will be required to utilize e-Builder, the University’s Project Management System, for all compatible services required by the University. The preconstruction and construction services are generally described below. Subcontracts including but not limited to Plumbing, Fire Protection, HVAC, Electrical and AV/Technology will be awarded by the CM to prequalified vendors using a competitive process. The parties will engage in an "open book" pricing method in which all subcontracted work shall be based upon competitive pricing that will be reviewed by the Contracting Authority/Owner, the A/E and the CM. The Contracting Authority/Owner shall have access to all books, records, documents and other data in the CM's possession related to itself, its subcontractors and material suppliers pertaining to bidding, pricing or performance of the Agreement. Preconstruction Services: The CM will work cooperatively with the Contracting Authority/Owner, A/E, and Project Team, and will provide, among other services, schedule development, estimate development, Guaranteed Maximum Price (GMP) proposal, subcontractor prequalification and bidding, constructability review, permits, budgeting, Target Value Budget/Target Value Design, and preconstruction planning throughout the preconstruction stages. When the drawings and specifications are at the stage of completion specified in the Agreement, such partially completed documents (the "Basis Documents") shall be provided to the CM, together with the A/E's detailed listing of any incomplete design elements and the A/E’s statement of intended scope with respect to such incomplete elements (the "Design Intent Statement"). Contingent upon the Contracting Authority’s approval of the GMP, the parties will enter into an amendment to the Agreement establishing the Contract Sum (“GMP Amendment”). If the proposed Contract Sum exceeds the Project Budget established for construction, then the Contracting Authority may terminate the agreement with the CM and seek proposals from other firms for completion of the Project. Construction Services: The CM shall construct the Project pursuant to the construction documents and in accordance with the schedule requirements. The CM shall hold all subcontracts and shall be fully responsible for the means and methods of construction, project safety, project completion within the schedule agreed upon in the preconstruction phase, compliance with all applicable laws and regulations including monitoring compliance with all EDGE, equal employment, and prevailing wage requirements, and submitting monthly reports of these activities to the Contracting Authority. All subcontracts shall be on the subcontract form prescribed by OAC Section 153:1-03-02. The Contracting Authority reserves the right to approve the CM’s selection of subcontractors and any supplemental terms to the form subcontract. The Ohio State University is dedicated to providing a safe and healthy environment for students, patients, staff, visitors and contractors. While not exclusive, guidelines governing safety expectations for construction/ renovation projects within Ohio State buildings are set forth in the Building Design Standards Appendix V and are summarized here: https://fod.osu.edu/resources, under the section titled “Construction Site Safety Requirements.” Closeout Services: The closeout for this project is required to be delivered in an electronic cloud-based format using e- Builder Project Management System and adhere to The Ohio State University Project Closeout Standards. The Ohio State University Project Closeout Standards can be accessed via the OSU FOD vender resource website (https://fod.osu.edu/resources) under Post Construction / Close Out. The CM will comply with applicable OSU Wexner Medical Center policies, including the Identification Badge Policy, which incorporates the Non-discretionary Vaccination Policy/Employee Health Infection Control and Background Check Policies, as identified at https://wexnermedical.osu.edu/utility/footer/vendor-interaction. The CM is responsible for all costs incurred related to compliance with these policies. For purposes of completing the Relevant Project Experience Matrix in Section F of the Statement of Qualifications (Form F110-330), below is a list of relevant scope of work requirements for this RFQ: 1. Role on Project CMR 2. Experience with projects in hospital/sterile environments 3. Experience managing healthcare projects with expedited timelines driven by medical equipment delivery, installation and operational readiness. For the purpose of the selection of 10 Relevant Projects in Section F of the Statement of Qualification (Form F110-330), projects must have been completed by the Construction Management Firm.
More opportunities from The Ohio State University
Same awarding agency
Find Active Opportunities Like This
Get AI-powered intelligence on the opportunities still open
Every page of the solicitation package shredded into a compliance breakdown
AI-powered matching based on your capabilities and past performance
Competitor and incumbent history on the requirement
Automated alerts on amendments, Q&A deadlines, and award
Join 750+ contractors already using CLEATUS