Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, October 28 at 2:00 PM ET

Register Free →

S--CFD - Septic Service - adding a third location fo

Awarded
140R4026Q0044Federal

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

AI Contract Overview

Show more

The contract involves septic pumping and disposal services at the Morrow Point and Blue Mesa Powerplants under a five-year period, encompassing one base year and four option years, with services required quarterly at Morrow Point and biannually at Blue Mesa. The contractor must handle two septic tanks—2,500 gallons and 2,100 gallons—providing all labor, equipment, transportation, and disposal in full compliance with federal, state, and local environmental and OSHA regulations. Each service must be followed by a completion report detailing the date, volume pumped, disposal location, and tank condition, with disposal documentation provided upon request. The work must restore the site to its original condition after each visit, and all performance occurs within the Curecanti Field Division, including locations at Crystal Dam, Morrow Point, and Blue Mesa. The contract is a total small business set-aside under NAICS code 562991, with a size standard of $9 million in annual receipts, and requires offerors to submit electronic proposals as a single PDF under 10 pages, sent via email by May 8, 2026, to the designated contract specialist. Payment will be made electronically through the Invoice Processing Platform (IPP), and the contract includes clauses for installment payments, electronic funds transfer, service contract labor standards, minimum wage compliance, paid sick leave, whistleblower protections, and supply chain security restrictions, including prohibitions on certain telecommunications equipment and foreign-owned software. The contracting officer is Russell Oaks, with Samantha Colt as the point of contact; the contracting officer’s representative and COTR will be designated after award. The contract type is unspecified, but it is structured as a firm-fixed-price task order with indefinite delivery, and delivery terms are FOB destination. No formal packaging, marking, or bar-code standards are prescribed beyond country-of-origin labeling, and invoicing is exclusively through IPP, with no WAWF authorization. All proposals must include completed representations and certifications per FAR 52.212-3, and award will be based on technical merit and past performance without specified weighting.

General Info

Septic pumping and disposal services contract for Blue Mesa and Morrow Point, small business set-aside.

Contract Value

$23,000

NAICS

562991 - Septic Tank and Related Services

Place of Performance

UT, USA

Set-Aside

NONE

Award Issued Date

Documents

3

Amendment 0001 to Solicitation 140R4026Q0044

PDF, High priority: read this firstamendment
High

Solicitation 140R4026Q0044 - Septic Service Waste Treatment

PDF, High priority: read this firstrfq
High

Solicitation 140R4026Q0044 - Septic Tank Pumping Services

PDF, High priority: read this firstrfq
High

AI Contract Breakdown

Uniform Contract Format

Sign up to view the full breakdown with detailed analysis of each section.

Timeline

2 updates
PhaseAwarded
Posted

Combined Synopsis

Notice updated

Notice details unchanged. Attachments may have changed.

Notice updated

Response deadline changed from May 8, 2026 to Jul 7, 2026. The notice title changed. The notice description changed.

Awarded

Contract was awarded

Ready to pursue this opportunity?

Start your free trial to track this contract, build proposals with AI assistance, and manage your pipeline.

Organization & Contact Information

Show more
AgencyDepartment Of The Interior → Upper Colorado Regional Office
Contacts1 person available
OfficeSALT LAKE CITY, UT, 84138, USA
Office AddressSALT LAKE CITY, UT, 84138, USA

Full Description

Show more
Septic pumping and disposal at Blue Mesa, Morrow Point and Crystal Dam sites.

Similar Contracts

Same NAICS industry code

NAICS: 562991
New
SLED
Professional Maintenance and Asset Management of Water Storage Tanks
Solicitation # 2027-11
Dorchester County, South Carolina, is soliciting proposals for professional maintenance and asset management services for ten potable water storage tanks, including the Ridgeville and Academy towers. The scope of work encompasses comprehensive engineering inspections, cleaning, disinfection, preventative maintenance, repairs, and coating services to ensure the structural integrity, safety, and operational reliability of the facilities. The selected consultant must provide a detailed maintenance and asset management program with tank-specific schedules and coordinate all operational interruptions, such as tank outages or draining, with Dorchester County Water and Sewer. The contract is structured for an initial one-year term with options to renew for up to four additional one-year terms, requiring firm annual maintenance fees for the full five-year period. Proposals will be evaluated by a committee based on firm qualifications and experience, project understanding and technical approach, and project team qualifications. Submissions must be uploaded electronically via the OpenGov Procurement Portal by November 13, 2026. Awardees are required to provide performance and payment bonds, insurance certificates, and certify compliance with various federal and state regulations, including the Americans with Disabilities Act and South Carolina's Illegal Immigration Act. Payment for approved invoices is due within thirty days and must itemize the seven percent South Carolina sales and use tax.
Water & Sewer

POSTED

about 21 hours ago

DEADLINE

in about 1 month
View Details
NAICS: 562991
New
International
Septic Pump-Out Services, Bruce Peninsula National Park
Solicitation # 5P300-26-0067/A
Parks Canada Agency is soliciting Standing Offers for as-needed septic pump-out services, transportation, and sewage disposal at Bruce Peninsula National Park. The initial term runs from January 1, 2027, to December 31, 2027, with options to extend for four additional one-year periods through December 31, 2031. Services are primarily required during the operational season from May 1 to November 30, during which the contractor must be available seven days a week, including statutory holidays. Key service areas include the Cyprus Lake Campground, Singing Sands Comfort Station, and various other park facilities, with all sewage to be disposed of at the Municipality of Northern Bruce Peninsula Sewage Lagoon or another approved site. The contract requires strict adherence to response times, with requests received before 12:00 p.m. ET serviced the same day and those received after completed by the following calendar day. Award selection is based on the lowest evaluated price, provided the offer is compliant and meets Canadian goods and services thresholds. Bidders must maintain all necessary federal, provincial, and municipal licenses and provide a site-specific safety plan covering hazard identification and spill response. Bids must be submitted via email to [email hidden] or by fax to [phone hidden] by November 10, 2026, as submissions via SAP Ariba, courier, or in-person will not be accepted.
Parks Canada Agency

POSTED

2 days ago

DEADLINE

in 13 days
View Details
NAICS: 562991
New
SLED
CHP Marin Area office - Portable Luxury Restroom Trailer Rental and Maintenance Services - IFB #26C350009
Solicitation # 26C350009
The Department of the California Highway Patrol is soliciting bids for Invitation for Bids Number 26C350009 to provide portable luxury restroom trailer rental and maintenance services for the CHP Marin Area office. The anticipated contract term runs from December 1, 2026, to November 30, 2028. The scope of work requires the provision of two luxury trailers: one featuring three stalls, including an ADA-compliant stall, and another featuring two stalls, both with sinks in each stall. The contractor must provide cleaning and pumping services three times per week, ensuring all waste disposal adheres to federal, state, and local regulations. The contract will be awarded to the responsive and responsible bidder offering the lowest adjusted cost. Evaluation includes a pass/fail responsiveness review and verification of mandatory qualifications, including a valid business license, county environmental health permits, disposal site discharge permits, and motor carrier permits for vehicles over 10,001 lbs. Bidders must also be registered with the DIR and certify they are in good standing within California. While the DVBE participation requirement is waived, incentives are available for certified small, micro, and DVBE businesses. Submission requirements are strict, requiring a single original bid package delivered in a sealed envelope by November 6, 2026. All required attachments, including the bid form, client references, and certification clauses, must be signed in ink. Special requirements include mandatory security clearances and driver license checks for all personnel accessing CHP facilities, compliance with prevailing wage rates, and the provision of liability and workers' compensation insurance.
Department of the California Highway Patrol

POSTED

5 days ago

DEADLINE

in 9 days
View Details

More opportunities from Department Of The Interior → Upper Colorado Regional Office

Same awarding agency

NAICS: 237110
Federal
Y--EAST CANAL EFFICIENCY IMPROVEMENTS
Solicitation # 140R4026R0025
Solicitation 140R4026R0025 is a total small business set-aside for the East Canal Efficiency Improvements project on the Uncompahgre Project in Delta County, Colorado. Managed by the Department of the Interior's Bureau of Reclamation, Upper Colorado Regional Office, the project has an estimated magnitude between 5 million and 10 million dollars. The scope of work involves the construction of water supply facilities, specifically the installation of approximately 170 feet of parallel 54-inch HDPE pipe for a double barrel siphon, as well as 48-inch and 42-inch polypropylene profile wall piping. Additional requirements include the construction of concrete hydraulic structures, metalwork for diversion pipeline inlets, flow measuring equipment installation, earthwork, and clearing and grubbing. Work is subject to seasonal restrictions tied to irrigation shutdown and startup dates to avoid interference with agricultural operations. The period of performance is scheduled from January 25, 2027, to November 1, 2028, with performance required to begin within 21 days of award. Proposals are due by November 20, 2026, and will be evaluated based on a best value cost/technical tradeoff process considering technical approach, construction schedule, project team composition, past performance, and price. Awardees must provide performance and payment bonds within 10 calendar days of award and maintain liability insurance for work on government installations. Invoicing must be processed through the Invoice Processing Platform (IPP). The project is governed by FAR 52.246-12 for inspection of construction, with final acceptance occurring only at the jobsite after successful installation and testing.
Water and Sewer Line and Related Structures Construction

POSTED

8 days ago

DEADLINE

in 23 days
View Details
NAICS: 238210
Federal
R--CLWTP FISMA Compliance
Solicitation # 140R4026Q0108
The Department of the Interior, Bureau of Reclamation, is seeking a firm-fixed-price contract for professional technical services to bring the Navajo-Gallup Water Supply Project Cutter Lateral Water Treatment Plant SCADA system into FISMA compliance. The scope of work includes resolving information security and privacy weaknesses identified in the Plan of Action and Milestones, updating system documentation, and restoring communication links with the Navajo Tribal Utility Authority Escrito Mesa data concentrator. There is also an optional requirement for the programming and integration of the new DZ Booster Pump Station. The project requires the contractor to provide project management, a Quality Control Plan, and a Communication Plan while ensuring that critical water treatment processes remain uninterrupted. This is a sole source procurement under FAR 6.103-1 and FAR 12.201-1, with Jacobs Engineering identified as the uniquely qualified firm due to their prior design, construction, and operational knowledge of the facility. The base period of performance is from November 30, 2026, to May 30, 2028, with the optional booster plant integration scheduled from November 29, 2027, to May 30, 2028. Performance will take place in Farmington, New Mexico. Award will be based on the most advantageous offer considering price and technical capability, though technical and past performance factors are weighted as significantly less important than cost.
Electrical Contractors and Other Wiring Installation Contractors

POSTED

9 days ago

DEADLINE

in 2 days
View Details
NAICS: 237110
Federal
Y--Turnout Buildings
Solicitation # 140R4026B0002
Solicitation 140R4026B0002 is a sealed bid Invitation for Bid issued by the Bureau of Reclamation for the construction of potable water delivery turnout buildings and associated improvements as part of the Navajo-Gallup Water Supply Project in northwest New Mexico. The project, estimated between $18 million and $23 million, involves work at seven sites, including Sanostee, Newcomb, and Naschitti. The scope of work encompasses the installation of precast concrete buildings and foundations, buried piping, valves, fiberoptic infrastructure, and controls integration with existing SCADA systems. Additional site improvements include gravel surfacing, steel fencing, and access roads for specific locations. The period of performance is scheduled from December 16, 2026, to April 16, 2029. The contract is a small business set-aside under NAICS code 237110. Award will be granted to the responsible, compliant offeror with the lowest total bid price, calculated across seven price schedules excluding certain taxes. Key contractual requirements include strict adherence to Davis-Bacon Act wage determinations for San Juan and McKinley Counties, compliance with the Americans with Disabilities Act, and the submission of a Small Business Subcontracting Plan. The contractor is responsible for quality control and geotechnical investigations, while the government maintains quality assurance. Failure to complete the work within the specified timeframe will result in liquidated damages of $4,536.00 per calendar day. Bids are due by November 10, 2026.
Water and Sewer Line and Related Structures Construction

POSTED

15 days ago

DEADLINE

in 13 days
View Details
NAICS: 237110
Federal
Y--NGWSP Cutter Lateral Reach 21 Booster Plant
Solicitation # 140R4026B0003
The Navajo Gallup Water Supply Project Cutter Lateral Reach 21 Booster Plant is a construction project managed by the U.S. Bureau of Reclamation, Upper Colorado Basin Region. Located in San Juan County, New Mexico, approximately 26 miles south of Bloomfield, the project is part of a larger infrastructure effort to provide municipal and industrial water to the Navajo Nation, Jicarilla Apache Nation, and the city of Gallup. The scope of work includes the construction of a pre-engineered concrete booster pump station with associated foundations, electrical equipment, and fencing; the installation of a secondary regulation tank at the Regulation Tank No. 3 site; the implementation of SCADA and radio communications systems; and site restoration involving retaining walls, swales, and regrading to prevent erosion and scour. This procurement is conducted as a small business set-aside under NAICS code 237110, with an estimated project magnitude between $10 million and $25 million. The contract will be awarded to the responsible offeror with the lowest priced bid, provided they are compliant with solicitation terms and provide a bid guarantee of at least 20 percent of the bid price. Performance and payment bonds for 100 percent of the contract price are required. The period of performance allows for a start date within 21 calendar days of award, with total completion required within 392 calendar days. The project adheres to FAR Part 14, the Davis-Bacon Act for prevailing wages, and Buy American requirements for construction materials.
Water and Sewer Line and Related Structures Construction

POSTED

28 days ago

DEADLINE

in 2 days
View Details

Earlier notices in this NAICS code

Posted before this notice, open and closed

Ready to Pursue This Opportunity?

Get AI-powered intelligence on this solicitation and the ones like it

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 750+ contractors already using CLEATUS