Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, November 11 at 2:00 PM ET

Register Free →

This Combined Synopsis/Solicitation opportunity from Department Of Homeland Security was posted on February 28, 2025. The submission period has ended. Browse the details below for market research, or find similar active opportunities.

CGC MIDGETT - Dual Point Biennial Maintenance

Awarded
70Z085Q11258Federal

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

Active Opportunities Like This One

NAICS: 336611
New
DIBBS
TRAINING SET, FIRE FIGH
Solicitation # SPE8E6-27-T-0421
Solicitation SPE8E6-27-T-0421 is a fixed-price procurement by the Defense Logistics Agency for 39 kits of Fire Fighting and Damage Control training sets, identified by NSN 6930-01-585-8179. The contract is designated as a Service-Disabled Veteran-Owned Small Business Set-Aside, though some sections of the documentation contain conflicting notes regarding small business status. Key delivery requirements include a 76-day delivery window after award, with a need ship date of October 9, 2026, and an original required delivery date of March 30, 2027. Shipping is FOB Origin, with the destination being the DLA Distribution DDSP New Cumberland Facility in Pennsylvania. The contractor must adhere to strict packaging and marking standards, specifically MIL-STD-2073-1E for packaging and MIL-STD-129 for marking. Palletization must comply with DLA requirement RP001. Special material restrictions are in place, prohibiting the intentional addition of mercury or mercury-containing compounds, except where functionally required and specified by NAVSEA. The contract incorporates various federal regulations, including the Buy American and Balance of Payments Program, safeguarding of covered defense information, and hazardous material labeling per 29 CFR 1910.1200. Inspection and acceptance will occur at the destination, and all invoicing must be processed electronically through the Wide Area WorkFlow system.
DDSP NEW CUMBERLAND FACILITY

POSTED

about 4 hours ago

DEADLINE

in 12 days
NAICS: 336611
New
DIBBS
LAMINATED CONDUCTO
Solicitation # SPE7M2-27-T-0463
Solicitation SPE7M2-27-T-0463 is a small business set-aside issued by the DLA Weapons Support Nuclear Reactor Program for the procurement of 13 units of Laminated Conducto, identified by NSN 6145-01-524-6075. The requirement is classified under NAICS code 336611. Key delivery milestones include a need ship date of April 26, 2027, and an original required delivery date of January 5, 2028, with a delivery lead time of 167 days after receipt of order. Shipping is designated as FOB Origin, with the destination for both inspection and acceptance being the DLA Distribution DDSP New Cumberland Facility in Pennsylvania. The contract mandates strict adherence to technical and quality requirements found in the DLA Master List, specifically referencing RA001, RC001, RP001, and RQ011. Packaging and marking must comply with MIL-STD-2073-1E and MIL-STD-129, while palletization must follow RP001. A critical environmental restriction prohibits the intentional addition of mercury or mercury-containing compounds to the hardware, except for specific functional exceptions. Administrative requirements include the use of the Wide Area WorkFlow system for electronic invoicing and payment. The solicitation incorporates various FAR and DFARS clauses covering cybersecurity, the Buy American Act, and the prohibition of covered defense telecommunications equipment.
DLA WEAPONS SUPPORT NUCLEAR REACTOR PROGRAM

POSTED

about 4 hours ago

DEADLINE

in 12 days
NAICS: 336611
New
DIBBS
LADDER, EXTENSION
Solicitation # SPE8E9-27-T-0349
Solicitation SPE8E9-27-T-0349, issued by the Department of Defense DLA Troop Support Construction and Equipment MRO SVC I, is for the procurement of one extension ladder under NSN 5440-01-537-4071. The delivery is required within 167 days after receipt of order, with a need ship date of April 26, 2027, and a final delivery date of September 24, 2027. The item is to be delivered to the DLA Distribution Depot at Hill AFB, Utah. All quotes must be submitted via the DLA Internet Bid Board System by November 9, 2026. The contract mandates strict adherence to quality and packaging standards, requiring compliance with ASTM D3951 for packaging, MIL-STD-129 for marking, and MIL-STD-130N for identification. Manufacturers must maintain an inspection system complying with SAE AS9003 or ISO 9001. Inspection and acceptance will occur at the origin. Due to the nature of the technical data, eligible offerors must possess an approved US/Canada Joint Certification Program certification and approval from the DLA controlling authority to access export-controlled data subject to ITAR or EAR regulations. Administrative requirements include the use of the Wide Area WorkFlow system for invoicing and payment. The procurement is subject to various federal regulations, including the Buy American Act, the Berry Amendment, and DFARS 252.204-7012 for safeguarding covered defense information. Evaluation for award may include a HUBZone price evaluation preference, and offerors must certify their small business status and compliance with prohibitions on covered defense telecommunications equipment.
CONSTRUCTION & EQUIPMENT MRO SVC I

POSTED

about 4 hours ago

DEADLINE

in 12 days
NAICS: 336611
New
Federal
Fuel Injection Pump Overhaul
Solicitation # N5005427Q0016
Solicitation N5005427Q0016 is a combined synopsis and solicitation for the overhaul of 32 LPD-17 class MPDE Fuel Injection Pumps for the USS San Antonio. The Department of Defense, through the Mid Atlantic Regional Maintenance Center in Norfolk, Virginia, intends to award this contract on a sole source basis to Fairbanks Morse under the authority of FAR 13.106-1(b)(1)(i). The work must be performed at the OEM facility in accordance with OEM procedures and the MPDE maintenance handbook, including joint inspections of disassembled components and a final receipt inspection upon return to the SIMA Diesel shop. The period of performance is scheduled from November 9, 2026, to November 30, 2026, with delivery to MARMC in Norfolk, Virginia. This procurement is conducted using Simplified Acquisition Procedures for commercial items under FAR Part 13 and FAR 12.6. Interested parties must be registered in the System for Award Management and submit quotes via email to the primary point of contact by November 2, 2026. Required quote elements include pricing, business size, payment terms, and a demonstration of technical capability to meet all specifications. The contract incorporates various federal and defense clauses, including Buy American certifications, cybersecurity requirements under DFARS 252.204-7012, and FOB Destination shipping terms.
Mid Atlantic Reg Maintenance Ctr

POSTED

about 9 hours ago

DEADLINE

in 5 days
NAICS: 336611
New
Federal
U.S. NAVY VESSEL VOYAGE REPAIR AVAILABILITY (VRA)
Solicitation # N6817127QN004
Solicitation N6817127QN004 is a Request for Quotation issued by NAVSUP Fleet Logistics Center Sigonella, Site Naples, for a Vessel Voyage Repair Availability (VRA) for the USNS T Whitney (LCC 20) in Gaeta, Italy. The scope of work includes 10 Category A work items and 3 Not Separately Priced (NSP) items, focusing on hull and structural steel repairs, communication and navigation calibration, auxiliary machinery piping and hose hydrostatic testing, HVAC duct repairs, and habitability outfitting. The period of performance is scheduled from December 1, 2026, through December 15, 2026. This is a Firm-Fixed-Price contract that is not set aside for small businesses. Award will be granted based on the Lowest Price Technically Acceptable (LPTA) criteria, requiring offerors to be rated as acceptable in technical capability before price evaluation. Key technical requirements include providing proof of an ISO9001 or 14001 Quality Management System, ABS welding certifications for mild carbon steel, and the use of a certified Marine Chemist or Industrial Hygienist for gas free certifications. Amendment 0001 specifically clarifies that costs for asbestos removal and disposal for the fire room LP drain piping repairs must be excluded from initial bids and will instead be handled via Condition Found Reports and Change Orders. Invoicing must be processed electronically through Wide Area Work Flow (WAWF).
Navsup Flc Sigonella Naples Office

POSTED

about 9 hours ago

DEADLINE

in 5 days
NAICS: 336611
New
Federal
PIPE/TUBING
Solicitation # 70Z04027Q60718Y00
The U.S. Coast Guard Surface Forces Logistics Center is seeking quotes for a Firm Fixed Price Purchase Order under solicitation 70Z04027Q60718Y00 for various industrial piping and tubing materials. The requirement includes seven specific items: 4 inch stainless steel 304L seamless pipe, 4 inch rectangular aluminum tubing, 1 inch copper tubing, 2 inch seamless steel pipe, 10 inch carbon steel DOM tubing, 6 inch rectangular 6061-T6 aluminum tubing, and 8.625 inch seamless 321 stainless steel pipe. All items have a requested delivery date of May 17, 2027. This is a total small business set-aside under NAICS code 336611, and the award will be based on best value, considering the ability to provide the complete requirement, adherence to the timeframe, and price. Eligible vendors must have an active SAM.gov registration and submit quotes that include all delivery and freight charges, as shipping is required FOB Destination. Deliveries must be made to the U.S. Coast Guard Yard Baltimore Facilities Management in Maryland, adhering to MIL-STD-2073-1E for packaging and MIL-STD-129R for marking and barcoding. Payments are NET 30 and must be processed through the IPP.gov portal. The solicitation is governed by FAR Part 12 for commercial products and services, including specific clauses regarding telecommunications and video surveillance prohibitions and DEI discrimination.
CG-SEA-C23

POSTED

about 9 hours ago

DEADLINE

in 15 days
NAICS: 336611
New
Federal
3389 Large Class Hopper Dredge (LCHD-ESS)
Solicitation # W912BU26RA031
Solicitation W912BU26RA031 is a request for proposals for the design, construction, testing, and delivery of one Large Class Hopper Dredge (LCHD-ESS) to replace the aging Dredge ESSAYONS for the U.S. Army Corps of Engineers, Portland District. The vessel will support missions across Washington, Oregon, California, Alaska, and Hawaii. Key technical specifications include a 6,500 cubic yard hopper capacity, diesel-electric power, azimuthing thruster propulsion, and a loaded draft of 26 feet or less. The vessel must be Jones Act compliant, meet PANAMAX beam requirements, and adhere to ABS classing. Delivery is FOB destination at U.S. Moorings in Portland, Oregon, with a total period of performance of 1,675 calendar days divided into four phases: Planning and Scheduling, Engineering, Construct and Test, and Sea Trials and Delivery. The government will award a fixed-price commercial supply contract with economic price adjustment based on best overall value. Evaluation factors include Technical Approach, Past Performance, Small Business Participation, and Price, with the combined non-price factors weighted approximately equal to price. Proposals must be submitted electronically via the PIEE Solicitation Module by April 15, 2027. Requirements include a bid guarantee, as well as performance and payment bonds equal to 5% of the original contract price. Additionally, the contractor must maintain CMMC Level 2 (Self) cybersecurity status for systems processing federal contract information. To encourage competition, the government has included a stipend provision of up to $1.5 million for eligible unsuccessful offerors.
W2SD Endist Philadelphia

POSTED

about 9 hours ago

DEADLINE

in 6 months

AI Contract Overview

Show more

This contract involves comprehensive vessel repair and maintenance services for the US Coast Guard Cutter MIDGETT (WMSL 757) at a Coast Guard facility in Honolulu, HI, with a performance period from April 9, 2025, to July 1, 2025. The scope includes general vessel repairs, fire detection system work, electrical cable testing, and preservation requirements, all adhering to Coast Guard standards, specifications, and technical publications. The contractor is responsible for obtaining all necessary materials, excluding government-furnished property, and must coordinate closely with Coast Guard personnel, including providing qualified technical representatives to ensure compliance with manufacturer procedures and safety standards. Key tasks involve performing biannual inspections, system disassembly, repairs, testing, and operational demonstrations, including launching the boat with the dual point davit system, weight testing, hook certification, and post-repair operational tests. The work also entails detailed preservation efforts, touch-up painting, and documentation submissions such as condition inspection reports and failure reports. The contract emphasizes strict adherence to safety, interference management, and operational testing protocols, with a focus on maintaining vessel readiness and safety standards, all under a small business set-aside procurement process.

General Info

Contract Value

$316,122

NAICS

336611 - Ship Building and Repairing

Place of Performance

Honolulu, HI, 96819, USA

Set-Aside

SBA

Award Issued Date

Documents

1

USCGC MIDGETT (WMSL 757) Dual Point Davit Biennial Maintenance SOW

DOCX, High priority: read this firstsow
High

AI Contract Breakdown

Uniform Contract Format

Contract not broken down yet

CLEATUS splits the solicitation into Uniform Contract Format (UCF) sections: scope, pricing, deliverables, and evaluation criteria.

Timeline

PhaseAwarded
Posted

Combined Synopsis

Awarded

Contract was awarded

Submission Closed

Find active opportunities like this

Get full access to discover similar active contracts, track opportunities, and build proposals with AI assistance.

Organization & Contact Information

Show more
AgencyDepartment Of Homeland Security → Sflc Procurement Branch 2(00085)
Contacts1 person available
OfficeALAMEDA, CA, 94501, USA
Office AddressALAMEDA, CA, 94501, USA

Full Description

Show more
General Requirements? SCOPE???? Intent. This standard specification invokes general requirements for conducting vessel repairs performed by commercial contractors at a Coast Guard facility for Coast Guard vessels.???? REFERENCES???? COAST GUARD DRAWINGS??? Coast Guard Drawing 418A-WMSL-100-001, Rev B, General Arrangements? Coast Guard Drawing 418A-WMSL-801-001, Rev A, Booklet of General Plans? Coast Guard Drawing 750-WMSL-436-011, Rev E, Fire Detection Sys Deck Plan (ASC436009)? Coast Guard Drawing 750-WMSL-436-013, Rev C, Fire Detection Sys Cable Running Sheets (ASC436010)? Coast Guard Drawing 750-WMSL-436-014, Rev -, Fire Detection and Control System Schematic (ASC436028)?? COAST GUARD PUBLICATIONS??? Surface Forces Logistics Center Standard Specification 0000 (SFLC Std Spec 0000), 2022, General Requirements? Surface Forces Logistics Center Standard Specification 3041 (SFLC Std Spec 3041), 2022, Shipboard Electrical Cable Test? Surface Forces Logistics Center Standard Specification 3042 (SFLC Std Spec 3042), 2022, Shipboard Electrical Cable Removal, Relocation, Splice, Repair, and Installation? Surface Forces Logistics Center Standard Specification 6310 (SFLC Std Spec 6310), 2022, Requirements for Preservation of Ship Structures? Coast Guard Technical Publication (TP) 9919, SWBS 436, Feb 2022, Fire and Smoke Detection System (For Hull 757)?? OTHER REFERENCES??? National Fire Protection Association (NFPA) 72, 2022 Edition, National Fire Alarm and Signaling Code? ?? ???????? 3. REQUIREMENTS??? 3.1 General. The Contractor must conform to all requirements specified in SFLC Std Spec 0000 and in this item, as applicable, during the performance of this availability. The requirements of this WI apply to all work under the scope of this contract, whether explicitly stated in all following work items or not, and to all other work subsequently authorized by changes, modifications, or extensions to the contract.??? ? 3.2 Materials. The Contractor must obtain all of the materials required to complete this job with the exception of the Government-furnished Property shown in Paragraph 1.2 of Work Item.???? ? 3.3. Period of Performance. The period of performance window for this work starts on 09 April 2025 and ends on 01 July 2025.??? ? 3.4. Location. The Contractor must perform the work while the USCGC MIDGETT (WMSL 757) is alongside the pier on 400 Sand Island Pkwy Honolulu, HI 96819-4326.???? 58300_RTK_1023_418 Dual Point Davit, Biennial Maintenance, Perform 1. SCOPE 1.1 Intent. This work item describes the requirements for the Contractor to perform Biennial Maintenance on Dual Point Davit listed in Table 1. TABLE 1 - DUAL POINT DAVIT NAMEPLATE DATA description LOCATION davit total gross weight Allied Systems Dual Point Davit with Control Console Models: DDP11000CTS & SP2200 Weather Deck, STBD Side, Frame 47 29,000 lbs 1.2 Government-furnished property. MTI ITEM DESCRIPTION NSN/PN QTY ESTIMATED COST ($/UNIT) Y CB-OTH Mark IV (Coast Guard Drawing 26B-CB-IV-801-001) N/A 1 ea. N/A Y Hook Model APR-356-CBH 2 ea. 5000.00 2. REFERENCES Coast Guard Drawings Coast Guard Drawing 418A-WMSL-100-001, Rev B, General Arrangements Coast Guard Drawing 418A-WMSL-801-001 Rev A, Booklet of General Plan COAST GUARD PUBLICATIONS Coast Guard Technical Publication (TP) LR-H5-0002-V0, SWBS 583, Oct 2023, Boat Davit - Models DDP11000CTS & SP2200 (Hull 757) Coast Guard Technical Publication (TP) 9618, SWBS 583, Sept 2023, Boat Davit - Models DDP11000CTS & SP2200 (S/N: 2328-753, 2329-751, 2332-750) Coast Guard Technical Publication (TP) 9619, SWBS 583, 06 Dec 2016, Boat Davit - Models DDP11000CTS & SP2200 (S/N: 2348) (Hull 754) Coast Guard Technical Publication (TP) 9899 SWBS 583, Apr 2021, Marine Crane - Models DDP11000CTS & SP2200 (S/N: 2366) (Hull 755) Coast Guard Technical Publication (TP) 9900, SWBS 583, Apr 2021, Marine Crane - Models DDP11000CTS & SP2200 - S/N 2382 (Hull 756) Surface Forces Logistics Center Standard Specification 0000 (SFLC Std Spec 0000), 2022, General Requirements Surface Forces Logistics Center Standard Specification 5000 (SFLC Std Spec 5000), 2022, Auxiliary Machine Systems Surface Forces Logistics Center Standard Specification 6310 (SFLC Std Spec 6310), 2022, Requirements for Preservation of Ship Structures Other References International Maritime Organization (IMO) International Convention for the Safety of Life At Sea (SOLAS), 2009 as amended in 2010 and 2011 International Maritime Organization (IMO) International Life Saving Appliances Code (LSA), 2010 edition ANSI/EASA Standard AR100-2020, Recommended Practice for the Repair of Rotating Electrical Apparatus 3. REQUIREMENTS 3.1 General. 3.1.1 CIR. The Contractor must submit a CIR for the inspections listed in the following paragraph(s): 3.2 Biannual maintenance inspection and repair task particulars (Task #1 and #2) 3.2.1 Hook certification. 3.1.2 Tech Rep. The Contractor must provide the services of a Qualified Technical Representative who is familiar with the Dual Point Davit (i.e. Allied System Co. Model No. DDP11000CTS) to accomplish the following on site: Advise on manufacturer's proprietary system information. Ensure compliance with manufacturer's procedures and standards during system disassembly, inspection, repair, reassembly, and testing as applicable. 3.1.2.1 Ensure the Tech Rep has experience with the system/equipment stated above and demonstrated on their r'sum. 3.1.2.2 Submit the name and r'sum of the Tech Rep to the COR at the Arrival Conference. 3.1.2.3 Point of contact: Heath Munger contact@example.gov Allied Systems Company +1 (555) 000-0000 3.1.3 Protective measures. The Contractor must furnish and install all protective measures in accordance with SFLC Std Spec 0000, paragraph 3.3.3 (Vessel component, space, and equipment protection). 3.1.3.1 Protection of fine surfaces. The Contractor must protect all fine surfaces in accordance with SFLC Std. Spec 5000. 3.1.3.2 Hydraulic system contamination protection. The Contractor must maintain existing hydraulic cleanliness in accordance with SFLC Std. Spec 5000. 3.1.4 Interferences. The Contractor must handle all interferences in accordance with SFLC Std Spec 0000, paragraph 3.3.5 (Interferences). Known interferences include, but are not limited to the following: Piping Electrical Cables Capstan NOTE Coast Guard personnel will operate all shipboard machinery and equipment. 3.1.5 Operational test, initial. Prior to commencement of work, the Contractor must witness Coast Guard personnel perform an initial operational test of all items or shipboard devices to be disturbed, used, repaired, or altered, to demonstrate existing operational condition. Submit a CFR. 3.1.6 Materials. The Contractor must furnish and install parts listed in Table 2. TABLE 2 - LIST OF PARTS QUANTITY PART NUMBER DESCRIPTION SOURCE OF SUPPLY 1 593533 Kit, Element Replacement Allied System Co. 214 S.W. Oregon Street, Sherwood OR 97140 1 593532 Kit, Element Replacement 2 70196 Return Filters 2 74130 Seal Kits 2 71975 Filter Breather 1 71754 Tank Cover Gasket 2 71042 Wire Rope 2 73441 Hub 3.2 Biannual maintenance inspection and repair task particulars. The Contractor with Tech Rep support must perform the tasks designated in Table 3 below and Figure 1 in accordance with SFLC Std Spec 5000 and CG Tech Pub as applicable. TABLE 3 - Recurring Maintenance task ADDITION REQUIREMENTS # TASK TYPE QTY COMPONENT OR ASSEMBLY APPENDIX AND PARA. FROM SFLC STD 5000 OTHER 1 Operate and Inspect 1 Dual Point Davit System 3.2.1 (Operate and Inspect) Appendix A (General Inspection Requirements) Submit CIR. 2 Service and Inspect 1 Hydraulic Winch Assembly (Constant Tension and Normal) which are powered by Main Hydraulic Pump/Motor Assembly (ST1) and Back Up powered by Emergency (ST2), Accumulators. 3.2.2 (Service and Inspect) D2.3 (Brakes and clutches. D2.4 (Open gearing and gear reducers) Submit CFR. 3 Disassemble and Inspect 2 Power Sheave Assembly 3.2.3 (Disassemble and Inspect) Renew the hub with CFE. If hubs are not available, clean, inspect, and reinstall hubs. 4 Hydraulic Lube Oil Analysis 1 Hydraulic System C2.1.3.1 Submit a CIR. 5 Renew 2 Wire Rope Assembly (Allied System Part No. 71042) D2.2 (Wire rope assemblies) Wire rope particulars: Nominal diameter: 5/8 inch Minimum Breaking Strength: 56,040 lbs. Total length of each wire rope required: 110 ft. End fitting type: Fiege. Submit a CFR. 6 NDE 1 Dual Point Davit System 3.2.5 (NDE) Areas to NDE: all weld joints and boom and turret structures. Submit a CFR. 7 Groom and Lubricate 1 Dual Point Davit System 3.2.6 (Groom and Lubricate) 8 Weight Test 1 Dual Point Davit System B2.7.2 (Dual Point Davits) B2.7.2.1 No-load Operational Test B2.7.2.2 Static Load Test B2.7.2.3 Winch/Brake/Modified static load Test B2.7.2.4 Dynamic Load Test B2.7.2.5 Rated Load test Test weight particulars: Working Load Limit (11,000 lb.). "Modified static / brake" test load: 16,500 pounds (150% of WLL) - Modified Dynamic Test Load: 12,650 pounds (115% of WLL) 9 Electric Motors 1 Normal RIHB Boat Davit and Emergency RIHB Davit HPU Motors Perform Insulation Resistance Test in accordance with ANSI/EASA AR 100-2020.and Para 6.5.4.3 of TP 9618. Submit a CFR. 10 Fabricate and Install 1 Label plate B2.9 (Label Plates) 11 Partially Preserve 1 Dual Point Davit Assembly (including pedestal, foundation, and all previously/normally painted components or surfaces) 3.2.4 (Partial Preservation) 12 Service and Inspect? 1? Control Panel? 3.2.2 (Service and Inspect)? Verify all mechanical and electrical signals to the control panel. Submit a CFR.? 3.2.1 Hook certification. The Contractor with Tech Rep support must inspect the hooks and verify their certification. Submit a CIR. Hooks (i.e. P/N: Model APR-356-CBH) must be renewed at every 48 months with GFP. Renew hooks if certification is expired. 3.2.1.1 Mandatory Turn-in Item (MTI) removal. If required to be renewed, the Contractor must remove the existing MTI hooks and turn over to the COR. 3.3 Special requirements for various components. If a Change Request has been authorized for additional work on any of the components listed in Table 4 below, the Contractor must perform work in accordance with the corresponding Appendix or paragraph of SFLC Std Spec 5000. TABLE 4 - SPECIAL REQUIREMENTS Component Appendix & Paragraph in sflc std spec 5000 Fluids C2.1 Hose assemblies C2.2 Piping and tubing C2.3 Valves and manifolds C2.4 Gages C2.5 Gas charged accumulators C2.6 Heat exchangers and fluid coolers C2.7 Systems C2.8 Fastener assemblies D2.1 Wire rope assemblies D2.2 Brakes and clutches D2.3 Open gearing and gear reducers D2.4 NOTE Coast Guard personnel will operate all shipboard machinery and equipment. 3.4 Operational test, post repairs. After completion of work, the Contractor must thoroughly test, in the presence of the Coast Guard Inspector and demonstrate all items or shipboard devices that have been disturbed, used, repaired, altered, or installed to be in satisfactory operating condition. Submit a CFR. 3.4.1 The Contractor with Tech Rep support must perform a dockside test, consisting of launching the GFP boat to test Constant Tension Function, Wire Rope Tension, CT Select Button, Control function, CT Engage, Brake Release etc. Submit a CFR. 3.5 Touch-up preservation. The Contractor must prepare and coat all new and disturbed exterior and interior surfaces to match existing adjacent surfaces, in accordance with SFLC Std Spec 6310. Abide by all touch-up requirements outlined in SFLC Std Spec 6310. NOTE Government will provide 72 Hours of advance notice to the Contractor for sea trial support by the Tech Rep. 3.6 Sea trial. The Contractor must provide Tech Rep support to test operational capability of the Dual Point Davit with GFP in accordance with TP. Estimated time for sea trial is eight hours. Perform an at sea test launching the GFP boat to test Constant Tension Function, Wire Rope Tension, CT Select Button, Control function, CT Engage, Brake Release etc. Ensure all functions are in satisfactory operating conditions. Submit a CFR. 4. NOTES FIGURE 1: DUAL POINT DAVIT MAINTENANCE TABLE General Requirements? SCOPE???? Intent. This standard specification invokes general requirements for conducting vessel repairs performed by commercial contractors at a Coast Guard facility for Coast Guard vessels.???? REFERENCES???? COAST GUARD DRAWINGS??? Coast Guard Drawing 418A-WMSL-100-001, Rev B, General Arrangements? Coast Guard Drawing 418A-WMSL-801-001, Rev A, Booklet of General Plans? Coast Guard Drawing 750-WMSL-436-011, Rev E, Fire Detection Sys Deck Plan (ASC436009)? Coast Guard Drawing 750-WMSL-436-013, Rev C, Fire Detection Sys Cable Running Sheets (ASC436010)? Coast Guard Drawing 750-WMSL-436-014, Rev -, Fire Detection and Control System Schematic (ASC436028)?? COAST GUARD PUBLICATIONS??? Surface Forces Logistics Center Standard Specification 0000 (SFLC Std Spec 0000), 2022, General Requirements? Surface Forces Logistics Center Standard Specification 3041 (SFLC Std Spec 3041), 2022, Shipboard Electrical Cable Test? Surface Forces Logistics Center Standard Specification 3042 (SFLC Std Spec 3042), 2022, Shipboard Electrical Cable Removal, Relocation, Splice, Repair, and Installation? Surface Forces Logistics Center Standard Specification 6310 (SFLC Std Spec 6310), 2022, Requirements for Preservation of Ship Structures? Coast Guard Technical Publication (TP) 9919, SWBS 436, Feb 2022, Fire and Smoke Detection System (For Hull 757)?? OTHER REFERENCES??? National Fire Protection Association (NFPA) 72, 2022 Edition, National Fire Alarm and Signaling Code? ?? ???????? 3. REQUIREMENTS??? 3.1 General. The Contractor must conform to all requirements specified in SFLC Std Spec 0000 and in this item, as applicable, during the performance of this availability. The requirements of this WI apply to all work under the scope of this contract, whether explicitly stated in all following work items or not, and to all other work subsequently authorized by changes, modifications, or extensions to the contract.??? ? 3.2 Materials. The Contractor must obtain all of the materials required to complete this job with the exception of the Government-furnished Property shown in Paragraph 1.2 of Work Item.???? ? 3.3. Period of Performance. The period of performance window for this work starts on 09 April 2025 and ends on 01 July 2025.??? ? 3.4. Location. The Contractor must perform the work while the USCGC MIDGETT (WMSL 757) is alongside the pier on 400 Sand Island Pkwy Honolulu, HI 96819-4326.???? 58300_RTK_1023_418 Dual Point Davit, Biennial Maintenance, Perform 1. SCOPE 1.1 Intent. This work item describes the requirements for the Contractor to perform Biennial Maintenance on Dual Point Davit listed in Table 1. TABLE 1 - DUAL POINT DAVIT NAMEPLATE DATA description LOCATION davit total gross weight Allied Systems Dual Point Davit with Control Console Models: DDP11000CTS & SP2200 Weather Deck, STBD Side, Frame 47 29,000 lbs 1.2 Government-furnished property. MTI ITEM DESCRIPTION NSN/PN QTY ESTIMATED COST ($/UNIT) Y CB-OTH Mark IV (Coast Guard Drawing 26B-CB-IV-801-001) N/A 1 ea. N/A Y Hook Model APR-356-CBH 2 ea. 5000.00 2. REFERENCES Coast Guard Drawings Coast Guard Drawing 418A-WMSL-100-001, Rev B, General Arrangements Coast Guard Drawing 418A-WMSL-801-001 Rev A, Booklet of General Plan COAST GUARD PUBLICATIONS Coast Guard Technical Publication (TP) LR-H5-0002-V0, SWBS 583, Oct 2023, Boat Davit - Models DDP11000CTS & SP2200 (Hull 757) Coast Guard Technical Publication (TP) 9618, SWBS 583, Sept 2023, Boat Davit - Models DDP11000CTS & SP2200 (S/N: 2328-753, 2329-751, 2332-750) Coast Guard Technical Publication (TP) 9619, SWBS 583, 06 Dec 2016, Boat Davit - Models DDP11000CTS & SP2200 (S/N: 2348) (Hull 754) Coast Guard Technical Publication (TP) 9899 SWBS 583, Apr 2021, Marine Crane - Models DDP11000CTS & SP2200 (S/N: 2366) (Hull 755) Coast Guard Technical Publication (TP) 9900, SWBS 583, Apr 2021, Marine Crane - Models DDP11000CTS & SP2200 - S/N 2382 (Hull 756) Surface Forces Logistics Center Standard Specification 0000 (SFLC Std Spec 0000), 2022, General Requirements Surface Forces Logistics Center Standard Specification 5000 (SFLC Std Spec 5000), 2022, Auxiliary Machine Systems Surface Forces Logistics Center Standard Specification 6310 (SFLC Std Spec 6310), 2022, Requirements for Preservation of Ship Structures Other References International Maritime Organization (IMO) International Convention for the Safety of Life At Sea (SOLAS), 2009 as amended in 2010 and 2011 International Maritime Organization (IMO) International Life Saving Appliances Code (LSA), 2010 edition ANSI/EASA Standard AR100-2020, Recommended Practice for the Repair of Rotating Electrical Apparatus 3. REQUIREMENTS 3.1 General. 3.1.1 CIR. The Contractor must submit a CIR for the inspections listed in the following paragraph(s): 3.2 Biannual maintenance inspection and repair task particulars (Task #1 and #2) 3.2.1 Hook certification. 3.1.2 Tech Rep. The Contractor must provide the services of a Qualified Technical Representative who is familiar with the Dual Point Davit (i.e. Allied System Co. Model No. DDP11000CTS) to accomplish the following on site: Advise on manufacturer's proprietary system information. Ensure compliance with manufacturer's procedures and standards during system disassembly, inspection, repair, reassembly, and testing as applicable. 3.1.2.1 Ensure the Tech Rep has experience with the system/equipment stated above and demonstrated on their r'sum. 3.1.2.2 Submit the name and r'sum of the Tech Rep to the COR at the Arrival Conference. 3.1.2.3 Point of contact: Heath Munger contact@example.gov Allied Systems Company +1 (555) 000-0000 3.1.3 Protective measures. The Contractor must furnish and install all protective measures in accordance with SFLC Std Spec 0000, paragraph 3.3.3 (Vessel component, space, and equipment protection). 3.1.3.1 Protection of fine surfaces. The Contractor must protect all fine surfaces in accordance with SFLC Std. Spec 5000. 3.1.3.2 Hydraulic system contamination protection. The Contractor must maintain existing hydraulic cleanliness in accordance with SFLC Std. Spec 5000. 3.1.4 Interferences. The Contractor must handle all interferences in accordance with SFLC Std Spec 0000, paragraph 3.3.5 (Interferences). Known interferences include, but are not limited to the following: Piping Electrical Cables Capstan NOTE Coast Guard personnel will operate all shipboard machinery and equipment. 3.1.5 Operational test, initial. Prior to commencement of work, the Contractor must witness Coast Guard personnel perform an initial operational test of all items or shipboard devices to be disturbed, used, repaired, or altered, to demonstrate existing operational condition. Submit a CFR. 3.1.6 Materials. The Contractor must furnish and install parts listed in Table 2. TABLE 2 - LIST OF PARTS QUANTITY PART NUMBER DESCRIPTION SOURCE OF SUPPLY 1 593533 Kit, Element Replacement Allied System Co. 214 S.W. Oregon Street, Sherwood OR 97140 1 593532 Kit, Element Replacement 2 70196 Return Filters 2 74130 Seal Kits 2 71975 Filter Breather 1 71754 Tank Cover Gasket 2 71042 Wire Rope 2 73441 Hub 3.2 Biannual maintenance inspection and repair task particulars. The Contractor with Tech Rep support must perform the tasks designated in Table 3 below and Figure 1 in accordance with SFLC Std Spec 5000 and CG Tech Pub as applicable. TABLE 3 - Recurring Maintenance task ADDITION REQUIREMENTS # TASK TYPE QTY COMPONENT OR ASSEMBLY APPENDIX AND PARA. FROM SFLC STD 5000 OTHER 1 Operate and Inspect 1 Dual Point Davit System 3.2.1 (Operate and Inspect) Appendix A (General Inspection Requirements) Submit CIR. 2 Service and Inspect 1 Hydraulic Winch Assembly (Constant Tension and Normal) which are powered by Main Hydraulic Pump/Motor Assembly (ST1) and Back Up powered by Emergency (ST2), Accumulators. 3.2.2 (Service and Inspect) D2.3 (Brakes and clutches. D2.4 (Open gearing and gear reducers) Submit CFR. 3 Disassemble and Inspect 2 Power Sheave Assembly 3.2.3 (Disassemble and Inspect) Renew the hub with CFE. If hubs are not available, clean, inspect, and reinstall hubs. 4 Hydraulic Lube Oil Analysis 1 Hydraulic System C2.1.3.1 Submit a CIR. 5 Renew 2 Wire Rope Assembly (Allied System Part No. 71042) D2.2 (Wire rope assemblies) Wire rope particulars: Nominal diameter: 5/8 inch Minimum Breaking Strength: 56,040 lbs. Total length of each wire rope required: 110 ft. End fitting type: Fiege. Submit a CFR. 6 NDE 1 Dual Point Davit System 3.2.5 (NDE) Areas to NDE: all weld joints and boom and turret structures. Submit a CFR. 7 Groom and Lubricate 1 Dual Point Davit System 3.2.6 (Groom and Lubricate) 8 Weight Test 1 Dual Point Davit System B2.7.2 (Dual Point Davits) B2.7.2.1 No-load Operational Test B2.7.2.2 Static Load Test B2.7.2.3 Winch/Brake/Modified static load Test B2.7.2.4 Dynamic Load Test B2.7.2.5 Rated Load test Test weight particulars: Working Load Limit (11,000 lb.). "Modified static / brake" test load: 16,500 pounds (150% of WLL) - Modified Dynamic Test Load: 12,650 pounds (115% of WLL) 9 Electric Motors 1 Normal RIHB Boat Davit and Emergency RIHB Davit HPU Motors Perform Insulation Resistance Test in accordance with ANSI/EASA AR 100-2020.and Para 6.5.4.3 of TP 9618. Submit a CFR. 10 Fabricate and Install 1 Label plate B2.9 (Label Plates) 11 Partially Preserve 1 Dual Point Davit Assembly (including pedestal, foundation, and all previously/normally painted components or surfaces) 3.2.4 (Partial Preservation) 12 Service and Inspect? 1? Control Panel? 3.2.2 (Service and Inspect)? Verify all mechanical and electrical signals to the control panel. Submit a CFR.? 3.2.1 Hook certification. The Contractor with Tech Rep support must inspect the hooks and verify their certification. Submit a CIR. Hooks (i.e. P/N: Model APR-356-CBH) must be renewed at every 48 months with GFP. Renew hooks if certification is expired. 3.2.1.1 Mandatory Turn-in Item (MTI) removal. If required to be renewed, the Contractor must remove the existing MTI hooks and turn over to the COR. 3.3 Special requirements for various components. If a Change Request has been authorized for additional work on any of the components listed in Table 4 below, the Contractor must perform work in accordance with the corresponding Appendix or paragraph of SFLC Std Spec 5000. TABLE 4 - SPECIAL REQUIREMENTS Component Appendix & Paragraph in sflc std spec 5000 Fluids C2.1 Hose assemblies C2.2 Piping and tubing C2.3 Valves and manifolds C2.4 Gages C2.5 Gas charged accumulators C2.6 Heat exchangers and fluid coolers C2.7 Systems C2.8 Fastener assemblies D2.1 Wire rope assemblies D2.2 Brakes and clutches D2.3 Open gearing and gear reducers D2.4 NOTE Coast Guard personnel will operate all shipboard machinery and equipment. 3.4 Operational test, post repairs. After completion of work, the Contractor must thoroughly test, in the presence of the Coast Guard Inspector and demonstrate all items or shipboard devices that have been disturbed, used, repaired, altered, or installed to be in satisfactory operating condition. Submit a CFR. 3.4.1 The Contractor with Tech Rep support must perform a dockside test, consisting of launching the GFP boat to test Constant Tension Function, Wire Rope Tension, CT Select Button, Control function, CT Engage, Brake Release etc. Submit a CFR. 3.5 Touch-up preservation. The Contractor must prepare and coat all new and disturbed exterior and interior surfaces to match existing adjacent surfaces, in accordance with SFLC Std Spec 6310. Abide by all touch-up requirements outlined in SFLC Std Spec 6310. NOTE Government will provide 72 Hours of advance notice to the Contractor for sea trial support by the Tech Rep. 3.6 Sea trial. The Contractor must provide Tech Rep support to test operational capability of the Dual Point Davit with GFP in accordance with TP. Estimated time for sea trial is eight hours. Perform an at sea test launching the GFP boat to test Constant Tension Function, Wire Rope Tension, CT Select Button, Control function, CT Engage, Brake Release etc. Ensure all functions are in satisfactory operating conditions. Submit a CFR. 4. NOTES FIGURE 1: DUAL POINT DAVIT MAINTENANCE TABLE

More opportunities from Department Of Homeland Security → Sflc Procurement Branch 2(00085)

Same awarding agency

NAICS: 811210
Federal
TRS-3D /AN/SPS-75 Radar repairs/ overhaul services
Solicitation # 70Z08526RRJ001B00
The United States Coast Guard Surface Forces Logistics Center is soliciting repair and overhaul services for the AN/SPS-75 Air Search Radar System, specifically for the 418-foot Legend-class National Security Cutter fleet. This is a sole-source acquisition awarded to Northern Defense Industries, LLC, as they are the only authorized U.S. service provider for these proprietary OEM parts and technical data. The scope of work includes the disassembly, inspection, testing, repair, preservation, packaging, and marking of various critical components, such as power supplies, circuit card assemblies, and radar set subassemblies. All repairs must adhere to Original Equipment Manufacturer specifications to maintain operational readiness and system warranties. The contract is structured as a requirements contract with fixed-price delivery orders, consisting of a base period and three one-year ordering periods, with an additional six-month extension option. Performance is primarily conducted at the contractor's facilities, with a strict requirement for items to be preserved for at least two years of warehouse storage and packaged according to military standards. Award is based on technical capability and fair and reasonable pricing, with evaluations focusing on resources, quality assurance, and past performance. Administrative requirements include electronic invoicing via the Invoice Processing Platform and the provision of a dedicated Project Manager to serve as the primary point of contact.
Electronic and Precision Equipment Repair and Maintenance

POSTED

2 months ago

DEADLINE

in about 1 month
View Details
NAICS: 333995
Federal
APPLETON CYLINDER
Solicitation # 70Z08526Q40200B00
Solicitation 70Z08526Q40200B00 is a combined synopsis and request for quote issued by the U.S. Coast Guard Surface Forces Logistics Center for the procurement of specific brand name components from Appleton Marine Inc. This is a Brand Name Only solicitation with no substitutions authorized; therefore, interested vendors must be authorized distributors and provide an authorized distributor letter from the Original Equipment Manufacturer with their quotation. The requirement is a total small business set-aside under NAICS code 333995 and will result in a firm-fixed-price purchase order. The procurement consists of three line items: three Jib Cylinders (NSN 3040 01-F12-2745), four Luff Cylinders (NSN 3040 01-F12-2743), and ten Sheaves (NSN 3020 01-F12-2750). Strict packaging and marking standards apply, including MIL-STD-2073-1E Method 10 for cylinders and ASTM D5118 fiberboard boxes for sheaves, with all items requiring marking per MIL-STD-129R and barcoding per ISO/IEC-16388-2007. Delivery is required by September 30, 2026, to the USCG Surface Forces Logistics Center in Baltimore, Maryland, with shipping terms set as FOB Destination. Offers will be evaluated based on price and the ability to meet the brand name and authorized distributor requirements. Successful contractors must submit invoices through the Invoice Processing Platform with payment terms of Net 30. All submissions must include the vendor's Unique Entity Identifier and CAGE code, and offerors must maintain current representations and certifications in the System for Award Management.
Fluid Power Cylinder and Actuator Manufacturing

POSTED

3 months ago

DEADLINE

in 9 months
View Details

Earlier notices in this NAICS code

Posted before this notice, open and closed

Find Active Opportunities Like This

Get AI-powered intelligence on the opportunities still open

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 750+ contractors already using CLEATUS