Change Order Unit Price Work

Closed
State & Local

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

Active Opportunities Like This One

NAICS: 237990
New
SLED
San Vicente and Mt. Olivette Reservoir Improvements Project - Construction
Solicitation # SP2797-CT
The San Vicente and Mt. Olivette Reservoir Improvements Project (SP2797-CT) is a construction solicitation issued by the City of Santa Monica's Public Works Engineering Division. The project involves addressing civil, mechanical, structural, and electrical deficiencies for four water reservoirs located at the Mt. Olivette Reservoir and the San Vicente Reservoir. With a project estimate of $27,344,000, the work requires a contractor holding a Class A General Engineering license. The estimated contract duration is 730 calendar days, although some contract documents reference a term of 520 days from the notice to proceed. Liquidated damages for delays are set at $13,200 per day. Bids must be submitted electronically via the OpenGov Procurement portal, with a final deadline of October 29, 2026, at 3:00 PM PT. Submission requirements include a bid guarantee of at least 10 percent of the bid amount and certification of a mandatory pre-bid job walk. Awarded contractors must provide Labor and Material Payment and Performance Bonds for 100 percent of the contract sum. The scope of work includes strict adherence to local noise ordinances, prevailing wage requirements, and technical specifications for potable water materials and electrical labeling. Performance is subject to inspection by the City and its designated engineers at both the project site and the place of manufacture.
D500 PUBLIC WORKS - ENGINEERING DIVISION

POSTED

about 8 hours ago

DEADLINE

in 9 days
NAICS: 237990
New
SLED
FDC-214-102565.1
Solicitation # FDC-214-102565
Project FDC-214-102565.1 involves the demolition of an existing concrete dam and associated infrastructure at Ryerson Station State Park in Richhill Township, Greene County, Pennsylvania. Managed by the Pennsylvania Department of Conservation and Natural Resources, the scope of work encompasses site preparation, including the installation and removal of erosion and sediment control measures and the implementation of a traffic control plan. Technical requirements include stripping and stockpiling topsoil, surface water control, dewatering subgrades, excavation, and the placement of select fill. The project concludes with site restoration, including topsoil application and seeding in all disturbed areas. All work must adhere to specific ASTM International standards for soil analysis and compaction, and the contractor is required to provide a complete set of as-built drawings upon completion. The contract will be awarded to the lowest responsible and responsive bidder, with an engineer's estimate exceeding 1 million dollars. Bidders must meet mandatory participation goals of 19 percent for Small Disadvantaged Businesses and 3 percent for Veteran Business Enterprises. Required securities include a bid guaranty, a 100 percent performance bond, a 100 percent material and labor payment bond, and a 50 percent maintenance bond. Contractors must comply with extensive Pennsylvania state labor laws, including the Prevailing Wage Act and the Construction Workplace Misclassification Act. Payments are processed via Automated Clearing House, and the contractor is responsible for engaging an independent testing laboratory for quality control services, subject to oversight by the Department's quality assurance program.
Commonwealth of Pennsylvania - Department of Conservation and Natural Resources

POSTED

about 15 hours ago

DEADLINE

in 15 days

AI Contract Overview

Show more

The City of Danville in Virginia is seeking a subcontractor for change order unit price work. The scope of the project involves the execution of minor excavation, backfill, and milling services. This opportunity is categorized under NAICS code 237990 and will be performed within the city of Danville. The solicitation was posted on January 13, 2026, and the deadline for responses is February 25, 2026. Interested parties can find further details and submission guidelines through the provided vendor portal link.

General Info

Place of Performance

Danville, VA, USA

Set-Aside

NONE

Documents

This scope was carved out of IFB 25-26-055.

The full solicitation package (1 document), including the RFP, is on the prime solicitation, not on this scope.

View the prime solicitation

IFB-25-26-055 Whitewater Park

AI Contract Breakdown

Uniform Contract Format

No documents to break down

The breakdown needs solicitation documents. None were found from this contract's source.

Timeline

PhaseClosed
Posted

subcontract

Response Deadline

Deadline has passed

Submission Closed

Find active opportunities like this

Start your free trial to discover similar active contracts, track opportunities, and build proposals with AI assistance.

Organization & Contact Information

Show more
AgencyVirginia → City of Danville
ContactsNo contacts available
OfficeN/A
Organization / AgencyVirginia → City of Danville
Office AddressN/A
ContactsNo contact information available

Full Description

Show more
Execution of unit-priced change order work including minor excavation, backfill, and milling.

More opportunities from Virginia → City of Danville

Same awarding agency

NAICS: 237310
New
SLED
IFB-26-27-024-Curb Market Parking Lot Improvements
Solicitation # IFB-26-27-024
The City of Danville, Virginia, is soliciting bids for the Curb Market Parking Lot Improvements project. The scope of work includes the removal and disposal of existing asphalt, reconditioning and grading of the aggregate base, placement of new asphalt pavement, and the installation of new pavement markings and parking appurtenances. Additionally, the contractor is responsible for adjusting drainage features, constructing new perimeter chain-link fencing and gates, and managing traffic and pedestrian control. The contract will be awarded to the lowest responsible and responsive bidder, with consideration also given to the proposed completion time. Bids must be submitted by November 3, 2026, at 2:00 PM. Required submission materials include the official bid proposal, evidence of financial resources and practical knowledge, a Virginia SCC registration number, and a City of Danville business license. A 5% bid bond is required, and the successful awardee must provide performance and labor and material bonds for 100% of the contract amount within ten calendar days of receiving contract documents. Work must commence within five calendar days of a written Notice to Proceed. The contract includes a 5% retainage withheld from each invoice until final acceptance. Liquidated damages for delays are set at $250 per day. The City maintains a 24-month warranty period following acceptance, during which defects are considered evidence of non-compliance. Contractors must certify that all employees scheduled for the project have not been convicted of a felony in the past seven years and are not on active parole or probation. All work must adhere to the Federal Occupational Safety and Health Act and applicable local, state, and federal laws.
Highway, Street, and Bridge Construction

POSTED

1 day ago

DEADLINE

in 6 days
View Details
NAICS: 237990
New
SLED
IFB-26-27-025-Ballou Park Pickleball Court Improvements
Solicitation # IFB-26-27-025
The City of Danville, Virginia, is soliciting bids for the Ballou Park Pickleball Court Improvements project under solicitation IFB-26-27-025. The scope of work involves converting an existing tennis court area into new pickleball courts, which includes demolition of existing fencing and lighting, reconditioning the aggregate base, and installing a new asphalt pavement system with an acrylic athletic court surfacing system and striping. Additional deliverables include the installation of net posts and accessories, 8-foot perimeter and 4-foot divider chain-link fencing, two 34 by 16 foot shade pavilions, and improvements to accessible parking and pedestrian routes. Sealed bids are due by November 4, 2026, at 2:00 PM, and may be submitted either electronically via the eVA portal or in paper format to the Purchasing Department. The contract will be awarded to the lowest responsible and responsive bidder, with evaluation factors including price, proposed completion time, financial resources, and practical knowledge of the work. The project must commence within five calendar days of the Notice to Proceed and be completed within 120 consecutive calendar days. The selected contractor must provide a 5 percent bid bond, as well as 100 percent performance and payment bonds. Compliance with the Federal Occupational Safety and Health Act, non-discrimination laws, and drug-free workplace requirements is mandatory. The contractor is also required to indemnify the City against all claims and liabilities and must remedy any defects in workmanship appearing within one year of final acceptance. All work is subject to the final inspection and approval of the Project Manager.
Other Heavy and Civil Engineering Construction

POSTED

1 day ago

DEADLINE

in 7 days
View Details
NAICS: 237310
New
SLED
IFB-26-27-020-FY-2027 Neighborhood Street Resurfacing Program
Solicitation # 26-27-020
The City of Danville, Virginia, is soliciting sealed bids under IFB 26-27-020 for its FY2027 Neighborhood Street Resurfacing Program. The scope of work involves asphalt concrete pavement planing and resurfacing for multiple city streets, including incidental tasks such as traffic control, shoulder renovation, and coordination with other contractors. The contract will be awarded to the lowest responsive and responsible bidder, with responsibility requiring VDOT prequalification in accordance with Section 102.01 of the VDOT Specifications. Bids must be submitted by December 3, 2026, via the eVA portal as a signed static PDF or as a sealed paper submission. The project requires strict adherence to VDOT Specifications, VDOT Standard Drawings, and the City of Danville's Standard Requirements and Instructions for Bidding Version 3.0. Awarded contractors must provide a 5% bid bond, as well as performance and labor and material bonds each totaling 100% of the contract price, within ten calendar days of receiving the contract documents. Insurance requirements include worker's compensation, comprehensive general liability, a minimum of 1,000,000 dollars in automobile liability, and an umbrella policy of at least 3,000,000 dollars. Work must commence within five calendar days of a written Notice to Proceed. The Project Manager holds final authority over the inspection and approval of all materials and work.
Highway, Street, and Bridge Construction

POSTED

6 days ago

DEADLINE

in about 1 month
View Details
NAICS: 541512
SLED
(Re-Bid) RFP-26-27-022 Data Networking Aviation Training Facility Building Hangars 100&300
Solicitation # RFP-26-27-022
The City of Danville is seeking a qualified contractor for the installation of data networking requirements at the Aviation Training Facility, Hangar 100, and Hangar 300 in Virginia. These facilities are shared by Danville Community College and Averett University. The project involves a total of three structures and requires the installation of Cat 6e cabling supporting up to 10 Gigabits per second, with access point locations specified in the E-201 Power Plan. The estimated grant budget for this project is 92,000 dollars. Work is scheduled to be completed in phases, with Phase 1 beginning in mid-December 2026 and hardware installation occurring between late January and early February 2027, with an overall completion deadline of April 30, 2027. Eligible bidders must hold a Virginia Low Voltage (LVS) Contractor’s License and comply with the Virginia Uniform Building Code and VDOT specifications. All information technology deliverables must adhere to Revised Section 508 Standards and WCAG 2.1 Level AA, requiring the submission of a Voluntary Product Accessibility Template and a Vendor Accessibility Roadmap prior to final acceptance. The contract requires a 5 percent bid bond and 100 percent performance and payment bonds. Award will be granted to the lowest responsible and responsive vendor, with consideration given to completion time and overall contractor qualifications. Liquidated damages are set at 300 dollars per calendar day, and a 5 percent retainage will be withheld. Proposals are due by November 3, 2026.
Computer Systems Design Services

POSTED

8 days ago

DEADLINE

in 7 days
View Details

Earlier notices in this NAICS code

Posted before this notice, open and closed

Find Active Opportunities Like This

Get AI-powered intelligence on the opportunities still open

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 750+ contractors already using CLEATUS