Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, October 28 at 2:00 PM ET

Register Free →

This Solicitation opportunity from Department Of Defense was posted on August 29, 2014. The submission period has ended. Browse the details below for market research, or find similar active opportunities.

CHICAGOLAND UNDERFLOW PLAN (CUP) MCCOOK RESERVOIR TUNNEL SYSTEM REPAIRS located in the COOK COUNTY, ILLINOIS

Closed
W912P6-14-R-0010Federal

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

Active Opportunities Like This One

NAICS: 237990
New
Federal
Design and Construction of Levee Access Manholes for Fairfax-Jersey Creek Levee Unit (Kansas City, Kansas)
Solicitation # W912DQ26RA065
The U.S. Army Corps of Engineers, Kansas City District, is soliciting design-build construction services for the installation of access manholes at the Fairfax-Jersey Creek Levee Unit on the Missouri River in Kansas City, Kansas. The project scope involves designing and constructing manholes, with estimated depths between 10 and 25 feet, to facilitate the video inspection of approximately 27,000 feet of existing perforated corrugated metal seepage collector pipe. To maintain levee integrity, the government strictly prohibits invasive mass excavation methods such as trenching, requiring the use of minimally invasive excavation techniques. Key deliverables include a Drilling and Invasive Program Plan approved by a licensed professional engineer or geologist, temporary flood protection plans, and final as-built drawings. This is a firm-fixed-price contract with an estimated magnitude between $1,000,000 and $5,000,000, though the total award amount shall not exceed $3,400,000. The acquisition is categorized under NAICS code 237990 with a small business size standard of $45 million. The selection process is conducted in two phases; Phase 1 focuses on qualifications and technical approach without pricing, from which up to three qualified offerors will be selected for Phase 2. Evaluation factors include design concepts, performance confidence, technical approach and qualifications, and small business participation, with non-price factors being significantly more important than price. Proposals must be submitted via the PIEE Solicitation Portal and adhere to strict documentation requirements, including the use of specific government templates for vendor information, experience, and technical qualifications.
W071 Endist Kansas City

POSTED

about 15 hours ago

DEADLINE

in 5 days
NAICS: 237990
New
Federal
PASS-A-GRILLE-PASS, MAINTENANCE DREDGING, PINELLAS COUNTY, FLORIDA
Solicitation # GROUP1-27-R-J001
Solicitation GROUP1-27-R-J001 is a total small business set-aside for maintenance dredging at Pass-a-Grille Pass in Pinellas County, Florida, issued by the U.S. Army Corps of Engineers, Jacksonville District. This firm fixed price task order is limited to contractors previously awarded under solicitation W912EP25R0010. The scope of work involves excavating material from the pass and transporting it to the Pass-a-Grille Beach Placement Area located north of the channel. Hopper dredging is strictly prohibited. Incidental requirements include environmental and water quality monitoring, beach fill quality control, tilling, vibration monitoring, and Munitions and Explosives of Concern construction support. The project has a price target range between $5,000,000 and $10,000,000, with a performance period of 120 calendar days following the Notice to Proceed, and work must commence within 60 calendar days of that notice. The government will utilize the Lowest Price Technically Acceptable process for award, evaluating offerors based on the technical acceptability and availability of their identified dredge and their past performance under the associated MATOC. Proposals must be submitted in PDF format via the PIEE Solicitation Module by 2:00 PM EST on November 20, 2026. Key compliance requirements include adherence to the Davis-Bacon Act, the provision of performance and payment bonds within 10 days of award, and the submission of qualified bird monitor credentials. Technical specifications require beach fill to be clean sand free of debris or toxic materials, with strict monitoring at both the borrow and placement areas to ensure quality standards are met.
W074 Endist Jacksnvlle

POSTED

about 15 hours ago

DEADLINE

in about 1 month
NAICS: 237990
New
Federal
Two Phase Design and Construction of the Port Monmouth Phase II, Contract 1 Mitigation Project
Solicitation # W912DS26RA032
Solicitation W912DS26RA032 is a competitive two-phase design-build procurement issued by the US Army Corps of Engineers, New York District, for the Port Monmouth Phase II Contract 1 Mitigation project in Middletown, New Jersey. With an estimated project magnitude between $15 million and $30 million, the scope involves the design and construction of wetland and upland restoration at the Pews Creek and Compton Creek mitigation sites. The project aims to reduce storm damages from coastal erosion and flooding in Raritan Bay, specifically focusing on restoring approximately 24.83 acres of wetlands and channels and 8.76 acres of uplands. The State of New Jersey Department of Environmental Protection serves as the non-Federal sponsor. The procurement follows a best-value tradeoff process in accordance with FAR 36.3, where non-price evaluation factors are approximately equal in importance to price. Phase One focuses on qualifying offerors based on specialized experience and past performance to shortlist up to five firms for Phase Two. Final award will be a firm fixed-price contract. Key requirements include strict adherence to New Jersey environmental standards, the provision of performance and payment bonds, and compliance with the Davis-Bacon Act. Following multiple amendments, the final response deadline for proposals was extended to October 21, 2026.
W2SD Endist New York

POSTED

about 15 hours ago

DEADLINE

in about 15 hours
NAICS: 237990
New
Federal
Stove Prairie Campground Gate Replacement
Solicitation # 117346
The USDA Forest Service, CSA Intermountain, is soliciting quotes for the disposal and replacement of a broken 32-foot double lane closure gate at Stove Prairie Landing in Bellvue, Colorado. This project is a total small business set-aside under NAICS code 237990, with an estimated project magnitude between $25,000 and $100,000. The award will be a firm fixed-price contract. The selected contractor must provide all labor, materials, and equipment for mobilization and the installation of the gate, ensuring all signage meets MUTCD standards and concrete work adheres to specific AASHTO sampling and testing requirements. Work must commence within 10 calendar days of the notice to proceed and be completed by August 31, 2027. Evaluation will be based on best value, focusing on the offeror's technical approach and price. Applicants must submit a 1-3 page technical narrative and a construction schedule, such as a Gantt chart, along with their pricing documentation. All quotes must be submitted via email to Contract Specialist Jordan Carlsen by November 11, 2026, at 14:00 EST. The contract requires the provision of performance and payment bonds and mandates that all invoicing be processed through the electronic Invoice Processing Platform (IPP) system. The government will conduct inspections at all reasonable times before final acceptance in accordance with FAR 52.246-12.
Csa Intermountain 8 Usda-Fs

POSTED

about 15 hours ago

DEADLINE

in 22 days
NAICS: 237990
New
SLED
Madera Unified School District Outdoor Education FacilityThe Madera Unified School District is proposing the construction and operation of the Outdoor Educational Facility Project located at the intersection of Almond Avenue and Stadium Road in Madera, California. This project involves the development of a 25.61-acre complex designed for district educational programs, youth sports, community events, and general public recreation. The facility will feature five ball fields, three soccer fields, five sand volleyball courts, a parking lot with approximately 313 spaces, and two support buildings comprising an office, training, and storage facility, as well as a ticket booth and restroom building. The scope also includes roadway, sidewalk, and utility improvements along the project frontage and the expansion of a City-owned stormwater basin. The project is governed by the California Environmental Quality Act (CEQA), with a Draft Initial Study and Mitigated Negative Declaration indicating that the project will not cause significant environmental harm provided specific mitigation measures are implemented. Key requirements include the use of full cut-off lighting fixtures, strict adherence to nesting bird protection windows between February and August, archaeological monitoring for excavations exceeding three feet, and paleontological discovery protocols. The project is managed by Rosalind Cox, Director of Facilities Planning, and involves coordination for potential annexation of portions of the site into the City of Madera.
Madera Unified School District

POSTED

about 20 hours ago

DEADLINE

N/A

General Info

NAICS

237990 - Other Heavy and Civil Engineering Construction

Place of Performance

MCCOOK RESERVOIR TUNNEL, COOK COUNTY, ILLINOIS, IL, USA

Set-Aside

SBA

Documents

44

Amendment 0005 to Solicitation W912P6-14-R-0010

PDF, High priority: read this first1 page · amendment
High

Amendment 0006 to Solicitation W912P6-14-R-0010

PDF, High priority: read this first2 pages · amendment
High

Amendment 0011 for W912P6-14-R-0010

PDF, High priority: read this first1 page · amendment
High

Appendix C - Maintenance and Inspection Schedule

DOC, High priority: read this first5 pages · specifications
High

Appendix C - Synopses of Manufacturer's O&M

DOC, High priority: read this first7 pages · specifications
High

Appendix D - Tunnel Entry Requirements

DOC, High priority: read this firstspecifications
High

Appendix E - Confined Space Entry Requirements

PDF, High priority: read this firstspecifications
High

Appendix E - Inspection Checklists

DOC, High priority: read this first1 page · specifications
High

Appendix F - Contract Specifications

DOC, High priority: read this first1 page · specifications
High

General Decision Number IL140009 - Cook County, Illinois

PDF, High priority: read this first14 pages · wage-determination
High

M-09 Dewatering and Drainage System Flow Diagram

PDF, High priority: read this first1 page · specifications
High

M-11 - Chicago Land Underflow Plan (CUP)

PDF, High priority: read this first1 page · specifications
High

M-20 McCook DTS Repairs - Lubrication System Plan

PDF, High priority: read this first1 page · specifications
High

Section 01 10 00 - General Provisions

PDF, High priority: read this first9 pages · specifications
High

Section 01 10 00 - General Requirements

PDF, High priority: read this first5 pages · specifications
High

Section 01 52 02 - Temporary Construction Facilities

PDF, High priority: read this first8 pages · specifications
High

W912P6-14-R-0010 Amendment 0001

PDF, High priority: read this firstamendment
High

W912P6-14-R-0010 Amendment 0002

PDF, High priority: read this first2 pages · amendment
High

W912P6-14-R-0010 Amendment 0003

PDF, High priority: read this first9 pages · amendment
High

W912P6-14-R-0010 Amendment 0004

PDF, High priority: read this first2 pages · amendment
High

W912P6-14-R-0010 Amendment 0007 - Chicagoland Underflow Plan

PDF, High priority: read this first2 pages · amendment
High

W912P6-14-R-0010 Amendment 0008 - Chicagoland Underflow Plan

PDF, High priority: read this first6 pages · amendment
High

W912P6-14-R-0010 Amendment 0009

PDF, High priority: read this first4 pages · amendment
High

W912P6-14-R-0010 Amendment 0010 - Chicagoland Underflow Plan

PDF, High priority: read this first21 pages · amendment
High

W912P6-14-R-0010 McCook DTS Repairs Drawings

PDF, High priority: read this first73 pages · specifications
High

W912P6-14-R-0010 McCook Reservoir DTS Repairs

PDF, High priority: read this first720 pages · ifb
High

W912P614R0010 Section 01 22 00 - Measurement and Payment

PDF, High priority: read this first13 pages · specifications
High

W912P6-14-R-0010 Section 01 45 00.00 - Quality Control

PDF, High priority: read this firstspecifications
High

W912P614R0010 Section 40 05 13 - Pipelines, Liquid Process Piping

PDF, High priority: read this first21 pages · specifications
High

Appendix B - As-Built Information

DOC, Low priority1 page · specifications
Low

Appendix H - Elevator Alimak Manlift Certification

DOC, Low priority1 page · specifications
Low

Appendix I - Manufacturers Product Submittals

DOC, Low priority1 page · specifications
Low

Appendix J - Map of Project Site

DOC, Low priority1 page · specifications
Low

Appendix J - Map with respect to Chicago

DOC, Low priority1 page · specifications
Low

McCook Distribution Tunnel System - O&M Manual Table of Contents

DOC, Low priority7 pages · specifications
Low

McCook Reservoir Distribution Tunnel System O&M Manual

DOC, Low priority53 pages · sow
Low

Appendix+A+-+PCA+Amendment.pdf

PDF

Appendix+A+-+PCA.pdf

PDF

Appendix+to+Ch+9+-+TARP+ERP.pdf

PDF

Attendance_Rosters.pdf

PDF

drawing+of+distribution+chamber.pdf

PDF

drawing+of+overall+site+plan.pdf

PDF

W912P614R0010_AMD0010_McCookDTS_Repairs_Specification_22_11_23.01.pdf

PDF18 pages

W912P614R0010_McCookDTS_Repairs_ReferenceDwgs.pdf

PDF

AI Contract Breakdown

Uniform Contract Format

Contract not broken down yet

CLEATUS splits the solicitation into Uniform Contract Format (UCF) sections: scope, pricing, deliverables, and evaluation criteria.

Timeline

19 updates
PhaseClosed
Posted

Presolicitation

Notice updated

Notice type changed from Presolicitation to Special Notice. Response deadline changed from Apr 1, 2014 to Feb 28, 2014. The notice title changed. Set-aside removed. The notice description changed.

Notice updated

Notice type changed from Special Notice to Presolicitation. Response deadline changed from Feb 28, 2014 to May 30, 2014. The notice title changed. Set-aside added: Total Small Business Set-Aside (FAR 19.5). The notice description changed.

Notice updated

Response deadline changed from May 30, 2014 to Jun 30, 2014. The notice description changed.

Notice updated

Response deadline changed from Jun 30, 2014 to Jul 18, 2014. The notice description changed. The point of contact changed.

Notice updated

The notice description changed.

Notice updated

The notice description changed.

Notice updated

Notice details unchanged. Attachments may have changed.

Notice updated

Response deadline changed from Jul 18, 2014 to Jul 28, 2014. The notice description changed.

Notice updated

The notice description changed.

Notice updated

The notice description changed.

Notice updated

Notice details unchanged. Attachments may have changed.

Notice updated

Notice details unchanged. Attachments may have changed.

Notice updated

Notice details unchanged. Attachments may have changed.

Notice updated

Notice details unchanged. Attachments may have changed.

Deadline changed

Response deadline changed from Jul 28, 2014 to Aug 4, 2014.

Notice updated

Notice details unchanged. Attachments may have changed.

Notice updated

The notice description changed.

Deadline changed

Response deadline changed from Aug 4, 2014 to Aug 12, 2014.

Notice updated

The notice description changed.

Response Deadline

Deadline has passed

Type Changed

Presolicitation → Solicitation

Submission Closed

Find active opportunities like this

Start your free trial to discover similar active contracts, track opportunities, and build proposals with AI assistance.

Organization & Contact Information

Show more
AgencyDepartment Of Defense → W072 Endist Chicago
Contacts2 people available
OfficeCHICAGO, IL, 60604-1437, USA
Office AddressCHICAGO, IL, 60604-1437, USA
Contacts
Greg M. HermsenContracting Specialist
Regina G. BlairChief, Contracting Branch

Full Description

Show more
This Pre-Solicitation Notice is being issued by the United States Army Corps of Engineers - Chicago District to inform interested/potential contractors of the District's imminent issue of a Request for Proposal Package for its construction project, entitled "CHICAGOLAND UNDERFLOW PLAN (CUP) MCCOOK RESERVOIR TUNNEL SYSTEM REPAIRS located in the COOK COUNTY, ILLINOIS. PROJECT INFORMATION: The MTS will consist of repair and/or replace various electrical and mechanical systems, Valve Chamber drainage improvements, concrete repairs, re-coating of valves, piping and other equipment, partitioning a room within the Control Building and other miscellaneous work. ACQUISITION INFORMATION: Competition for this acquisition is set aside for Small Business Concerns. The Classification Code for this procurement is North American Industry System Code 237990, with a small business size standard in dollars of $33.5M. The magnitude of cost for construction is between $5M and $10M. The Request for Proposal (RFP) Package will be downloadable from the INTERNET ONLY. The project specification files are Portable Document Format (PDF) files and can be viewed, navigated or printed using Adobe Acrobat Reader. Interested Offerors can download the RFP Package from: http://www.Fbo.gov. The RFP Package will be available at the aformentioned Internet site no earlier than 4:30 pm CDT on 30 May 2014, with proposals due by 4:30p.m. CDT on 30 June 2014. IN THE CASE OF A DISCREPANCY BETWEEN THE DATES PUBLISHED IN THIS NOTICE AND THOSE CALLED OUT IN THE RFP DOCUMENT, THE DATES IN THE RFP DOCUMENT OVERRIDES THOSE PUBLISHED HEREIN THIS NOTICE; THIS IS RELATIVE TO THE RFP ISSUANCE DATE AND THE DUE DATE FOR PROPOSALS. In order for contractors to be awarded contracts with the Department of Defense, the contractor must be registered in the System for Contract Management (SAM); Contractors can access the SAM database for free at http://www.sam.gov. The Government intends to award a firm-fixed price construction contract from this acquisition. FAXED OR ELECTRONIC BIDS WILL NOT BE ACCEPTED. Request for solicitation packages made by telephone, fax or e-mail will not be honored. The Point of Contact for this acquisition is Kim M. Beard at (312) 846-5378. -- Please include Solicitation Number W912P6-14-R-0010 on all correspondence.

More opportunities from Department Of Defense → W072 Endist Chicago

Same awarding agency

NAICS: 236220
Federal
PRESOLICITATION NOTICE FOR GATE HOIST MACHINERY PAINTING AND HOIST HOUSE REHABILITATION FOR FOX RIVER DAMS, WISCONSIN
Solicitation # W912P626BA026
The U.S. Army Corps of Engineers Chicago District is preparing to solicit a contract for the repainting of gate hoisting machinery and the rehabilitation of hoist houses across nine dams on the Fox River in Wisconsin, including Kaukauna, Little Chute, Cedars, Appleton Lower, Menasha, Appleton Upper, DePere, Little Kaukauna, and Rapid Croche Dams. The scope of work includes surface preparation and painting of all gate hoisting equipment as well as comprehensive structural upgrades to each hoist house such as replacing shingle roofing with metallic sheet roofing, installing heavy duty commercial doors with modified framing, swapping exterior vinyl siding for galvalume, renewing soffit and fascia, and adding insulation to ceiling and wall cavities. All work must comply with USACE EM 385-1-1 safety and construction standards, and the contract will be executed under a single-year performance period beginning after award. This acquisition is strictly reserved for small business concerns as defined by the North American Industry Classification System code 236220, with a size standard of $45 million in annual receipts. Interested vendors must be actively registered in the System for Award Management (SAM) at the time of proposal submission and must also register in the DoD’s Procurement Integrated Enterprise Environment (PIEE) system to access the official solicitation, which will be released in the fourth quarter of fiscal year 2026. Proposals submitted via telephone, fax, or email will not be accepted. All correspondence must reference the solicitation number W912P626BA026, and inquiries should be directed to the primary point of contact, Ericka Hillard. Contractors are encouraged to review the USACE Contract Changes Playbook for guidance on equitable adjustments and change order processes under the contract.
Commercial and Institutional Building Construction

POSTED

3 months ago

DEADLINE

N/A
View Details

Find Active Opportunities Like This

Get AI-powered intelligence on the opportunities still open

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 750+ contractors already using CLEATUS