Y--IFB Award for Shoreline protection at Camp Cronin fishing area and repair East shore Arm breakwater, Point Judith Harbor of refuge federal navigation project (FNP), Narragansett, Rhode Island.

Awarded
W912WJ-14-B-0010Federal

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

Active Opportunities Like This One

NAICS: 237990
New
SLED
Carlson Field Athletic Complex: Construction of new Pickleball Courts
Solicitation # BCP-REC-26
The Town of Hingham, Massachusetts, is soliciting sealed bids for the construction of eight new pickleball courts at the Carlson Field Athletic Complex, with an estimated project cost of $1,300,000. The scope of work includes site preparation such as the removal of trees and shrubs, re-grading, and the installation of the courts, posts, nets, walkways, benches, shade shelters, and ADA pathways. Additionally, the project requires a new asphalt parking lot and the installation of solid AF-6 Acoustifence Panels around the entire perimeter for sound attenuation. The contractor is responsible for maintaining construction fencing and erosion control, coordinating closely with the Town and the demolition contractor, Pasquazzi Bros, Inc. The contract will be awarded to the lowest responsible and eligible bidder who possesses at least seven years of experience constructing sports courts or similar athletic facilities. Bidders must provide a statement of qualifications, including three similar public project examples and three references, one of which must be a Massachusetts municipality from the last two years. This is a lump sum, fixed-price contract with no escalation for fuel, labor, or materials. Compliance with Massachusetts prevailing wage laws, OSHA regulations, and the Massachusetts Building Code is mandatory. Bids must be submitted electronically via the OpenGov portal by November 3, 2026, at 9:00 am, and must include a 5% bid security.
Recreation

POSTED

about 12 hours ago

DEADLINE

in 4 days

AI Contract Overview

Show more

This project involves the construction of an ocean shoreline stone revetment at the Camp Cronin fishing area and emergency repairs to the adjacent East Shore Arm Breakwater of the Point Judith Harbor of Refuge Federal Navigation Project in Narragansett, Rhode Island. These efforts aim to restore infrastructure damaged during Hurricane Sandy. The scope of work for the revetment includes excavation and the placement of various materials, including gravel bedding, filter materials, and armor stone weighing up to 12 tons, as well as the resetting of existing cobble and boulders. Breakwater repairs require the delivery and placement of armor stone weighing up to 15 tons to fill gaps and restore original profiles and cross-sections. Due to the nature of the site, the project demands extremely tight tolerances for stone placement and substantial manipulation of materials to ensure proper interlocking and design grades. All work must be executed under challenging conditions, as the site is directly exposed to ocean waves, wind, and restricted tidal environments.

General Info

Contract Value

$9,928,053.49

NAICS

237990 - Other Heavy and Civil Engineering Construction

Place of Performance

MA, USA

Set-Aside

NONE

Awardee

RC&D, INC.

Award Issued Date

Documents

2

BidAbstractFullBreakdown.pdf

PDF

BidSummary.pdf

PDF

AI Contract Breakdown

Uniform Contract Format

Contract not broken down yet

CLEATUS splits the solicitation into Uniform Contract Format (UCF) sections: scope, pricing, deliverables, and evaluation criteria.

Timeline

7 updates
PhaseAwarded
Posted

Presolicitation

Notice updated

Response deadline changed from Apr 24, 2014 to Jul 9, 2014. The notice description changed.

Notice updated

Notice details unchanged. Attachments may have changed.

Deadline changed

Response deadline changed from Jul 9, 2014 to Jul 17, 2014.

Deadline changed

Response deadline changed from Jul 17, 2014 to Jul 29, 2014.

Notice updated

Notice details unchanged. Attachments may have changed.

Deadline changed

Response deadline changed from Jul 29, 2014 to Aug 1, 2014.

Notice updated

Notice details unchanged. Attachments may have changed.

Type Changed

Presolicitation → Solicitation

Awarded

Contract was awarded

Submission Closed

Find active opportunities like this

Get full access to discover similar active contracts, track opportunities, and build proposals with AI assistance.

Organization & Contact Information

Show more
AgencyDepartment Of Defense → W2SD Endist New England
ContactsNo contacts available
OfficeCONCORD, MA, 01742-2751, USA
Office AddressCONCORD, MA, 01742-2751, USA
ContactsNo contact information available

Full Description

Show more
The work of this project involves constructing an ocean shoreline stone revetment at the Camp Cronin fishing area in Narragansett, Rhode Island, and constructing emergency repairs to the adjacent East Shore Arm Breakwater of the Point Judith Harbor of Refuge Federal Navigation Project, also in Narragansett, Rhode Island. The existing shoreline and breakwater were both damaged during Hurricane Sandy in October 2012. The shoreline revetment work tasks to construct the revetment involve excavation; furnishing and placing gravel bedding, stone filter materials, underlayer stone (up to 2,600 pounds in weight per stone), 2 ton stone (up to 2.2 tons in weight per stone), armor stone (up to 12 tons in weight per stone), cobble fill, crushed stone, and parking lot fill. Removing, stockpiling, and resetting existing cobble and boulders currently at the site of the work is required. Repairs to the breakwater will require the furnishment, delivery, and placement of new armor stone (up to 15 tons per stone) to replace stones displaced during Hurricane Sandy, and the filling in of existing gaps and low points along the breakwater. The repairs shall be performed to restore the breakwaters to their original profiles and cross-sections. The tolerances required for the placement of stone in both profiles and cross-sections is extremely tight. Repairs will require substantial moving and manipulation of both new and existing stones to achieve both the required interlocking placement and design grades. The revetment and breakwater construction site is directly exposed to ocean waves, wind, and tides, and work shall be performed in wet and restricted tidal conditions.

More opportunities from Department Of Defense → W2SD Endist New England

Same awarding agency

NAICS: 541330
New
Federal
Architectural-Engineering Services for Hazardous, Toxic, and Radioactive Waste Services for Various Locations within the U.S. Army Corps of Engineers New England District Mission Boundaries and Other North Atlantic Division Mission Boundaries
Solicitation # W912WJ27RA001
The U.S. Army Corps of Engineers New England District is establishing a Multiple Award Task Order Contract (MATOC) pool for Architect-Engineering services to support Hazardous, Toxic, and Radioactive Waste (HTRW) projects. The total value of the pool is up to $49,000,000.00, with awards anticipated for a minimum of three small businesses and up to three unrestricted contracts. Work will primarily be performed within the six New England states, New York, and New Jersey, but may extend to other areas within the North Atlantic Division mission area, including Pennsylvania, Delaware, Maryland, Virginia, West Virginia, and the District of Columbia. The scope of work includes CERCLA investigations, the development of Quality Assurance Project Plans, advanced risk assessments, remedial designs, and construction cost estimates using MII. All work must comply with the DERP statute, CERCLA, the National Oil and Hazardous Substances Pollution Contingency Plan, and applicable DoD and Army policies. The selection process is conducted under the Brooks Act, with primary evaluation factors focusing on experience in CERCLA investigations, handling emerging contaminants such as PFAS and 1,4 Dioxane, and the ability to meet state regulatory requirements in regions like Massachusetts, Connecticut, and New Jersey. Large firms are evaluated on their ability to execute $4 million per year, while small businesses are evaluated on a $1 million annual capacity. Secondary tiebreaker factors include geographic proximity to the mission area, the extent of small business participation for large firms, and the volume of DoD contract awards in the previous 12 months. Submissions must be made electronically via the PIEE Solicitation module by January 29, 2027, and must adhere to strict page limits of 65 pages for large firms and 50 pages for small businesses.
Engineering Services

POSTED

about 17 hours ago

DEADLINE

in 3 months
View Details
NAICS: 237990
New
Federal
Construction Services for Confined Aquatic Disposal Cell Construction and Maintenance Dredging of the Providence River Federal Navigation Project, Providence, Rhode Island.
Solicitation # W912WJ27X1CUP
The U.S. Army Corps of Engineers, New England District, is seeking information from small and large businesses for a dredging project in Providence, Rhode Island, under NAICS code 237990. The project is estimated to cost between 80 million and 100 million dollars, with a solicitation expected around March 15, 2027. Construction is slated to begin in September 2027 and span approximately two years, divided into two dredging seasons ending August 31, 2029. The scope involves the mechanical dredging of approximately 5.5 million cubic yards of material using closed clamshell buckets. The work is divided into two primary sequences. First, the contractor must construct a new Confined Aquatic Disposal (CAD) cell at Edgewood Shoals North, which includes digging an access channel and excavating 3.2 million cubic yards of material for disposal at four designated sites. Second, the contractor will perform maintenance dredging of the Providence River and Harbor Federal Navigation Project to a depth of -40 feet MLLW plus two feet of allowable overdepth, removing approximately 2.3 million cubic yards of material to be placed in the newly constructed CAD cell. Strict operational requirements include maintaining a production rate of 300,000 cubic yards every 30 calendar days, working 24 hours a day, 7 days a week. All activities must adhere to prescribed environmental windows to protect aquatic wildlife, and extensions to these windows are not permitted. Interested firms must demonstrate experience with mechanical dredging at the required production rate and open water placement in New England during winter months. Capabilities packages are due by December 3, 2026.
Other Heavy and Civil Engineering Construction

POSTED

1 day ago

DEADLINE

in about 1 month
View Details

Earlier notices in this NAICS code

Posted before this notice, open and closed

Find Active Opportunities Like This

Get AI-powered intelligence on the opportunities still open

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 750+ contractors already using CLEATUS