This Solicitation opportunity from California was posted on June 30, 2026. The submission period has ended. Browse the details below for market research, or find similar active opportunities.

CI 5725 Street Lighting on Avenida De Los Arboles

Closed
20260629008State & Local

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

Active Opportunities Like This One

NAICS: 237130
New
SLED
Installation of Buried Fiber Optic Cable Stanton North Substation to Hoskins Substation
Solicitation # 26085
The Nebraska Public Power District is soliciting bids for Request for Bid No. 26085 to install approximately six miles of underground fiber optic cable between the Stanton North and Hoskins Substations in northeast Nebraska. The scope of work encompasses all labor, materials, and supervision required for staking, material coordination, property owner contacts, and right-of-way restoration. Specifically, the contractor will install 48-strand buried fiber optic cable provided by the contractor and 48-strand all-dielectric fiber provided by the District. The project must adhere to RUS Form 515a and IEEE Standard 1333-1994 for guided boring. Work is expected to be awarded by November 25, 2026, with a final completion deadline of April 15, 2027. Bids are due by November 13, 2026, and must include a completed pricing spreadsheet and current all-inclusive equipment and labor rates. Evaluation factors for the award include quoted price, conformance with specifications, past schedule performance, and the bidder's financial responsibility and experience. To qualify, bidders must certify the completion of at least three similar buried fiber optic installation projects within the last five years. Payment terms specify that 95 percent of the price is paid within 30 days of acceptable performance, with 5 percent retained until final acceptance. An optional pre-bid teleconference is scheduled for November 5, 2026, to review contract specifications.
Nebraska Public Power District

POSTED

about 3 hours ago

DEADLINE

in 15 days
NAICS: 237130
New
SLED
De Palma Road Electrical Conduit Installation Project
Solicitation # TLARC-819
The County of Riverside is soliciting bids for the De Palma Road Electrical Conduit Installation Project (Project No. D4-0072) located in the Community of Horsethief Canyon, California. The project involves the excavation and backfill of approximately 1,000 feet of trenching, the installation of 685 feet of 1.5-inch and 350 feet of 3-inch electrical conduit and handholes, and the installation of 6-inch Type D concrete curb per County Standard No. 204. All work must adhere to Southern California Edison plans and be completed within 30 working days from the commencement date specified in the County's written order. The estimated project cost is 209,000 dollars. The contract will be awarded to the lowest responsive and responsible bidder. Bidders must submit their proposals by December 2, 2026, at 1:30 P.M. Pacific Time, including a non-collusion declaration and a bid guarantee of 10 percent of the total bid. The awarded contractor must provide performance and payment bonds, comply with California State Labor Code prevailing wage requirements, and adhere to specific affirmative action plans based on contract value and employee count. Payments will be made monthly, with the Owner paying 90 percent of the value of labor and materials incorporated into the work and 75 percent of materials stored on site, subject to certification by the Architect.
COUNTY OF RIVERSIDE

POSTED

about 9 hours ago

DEADLINE

in about 1 month
NAICS: 237130
New
SLED
Installation Of Street Lighting On Raymond Avenue From Maple Street To North City Limits
Solicitation # 2026-IFB-CIV-0549
The City of Pasadena Department of Public Works is soliciting bids under solicitation number 2026-IFB-CIV-0549 for the installation of a new street lighting system on Raymond Avenue, extending from Maple Street to the North City Limits. The project requires the contractor to furnish and install concrete street lighting standards, foundations, LED luminaires and fixtures, conduits, conductors, pull boxes, and other appurtenant work. Key technical deliverables include 29W or 50W LED replacements, galvanized steel conduits, and 6 foot Type S Scroll Arms. The contractor must provide all necessary labor, materials, and equipment, ensuring compliance with the ADA, CBC, Title 24, and PROWAG accessibility guidelines. Bids must be submitted electronically via the City of Pasadena eProcurement Portal by 2:00 pm on November 17, 2026. Qualified bidders must provide evidence of experience with two similar governmental projects and submit several mandatory documents, including Form AA-1, Form AA-2 for labor exceeding 25,000 dollars, a non-collusion declaration, and a DHS contract disclosure. A bid security of five percent of the total bid price is required, and the successful awardee must provide material and faithful performance bonds for 100 percent of the base bid. Work must commence within 15 calendar days of the Notice to Proceed and be completed within 20 working days. Invoicing is handled through the city's Vendor Invoice Portal, with payments issued on Tuesdays and Thursdays.
City of Pasadena Department of Public Works

POSTED

about 9 hours ago

DEADLINE

in 19 days
NAICS: 237130
New
SLED
115kV Transmission Line 1266 Rebuild Stanton North Substation to Dead-End Structure 79
Solicitation # 26-012
Nebraska Public Power District is soliciting sealed bids for Contract No. 26-012 to rebuild approximately 4.05 miles of the 115kV transmission line 1266, extending from the Stanton North substation to Dead-End Structure 79. The scope of work requires the contractor to provide all labor, supervision, equipment, and miscellaneous materials to replace all structures, conductors, shield wires, and hardware. Key technical deliverables include the installation of 28 wood H-Frame tangent structures and one tubular steel monopole dead-end on a drilled pier, upgrading the conductor to 954 kcmil 45/7 ASCR Rail, and installing 0.551 diameter fiber optic ground wire and EHS steel shield wire. The project also involves tree clearing, site preparation, and the removal of existing structures and conductors. Bids are due by 2:00 p.m. CST on December 2, 2026, and must be submitted as sealed hard copies to the Procurement Department in Columbus, Nebraska. The award will be based on the lowest cost and best bid, with evaluation factors including technical conformance, schedule capability, financial standing, and past performance history. Prospective bidders are encouraged to attend an optional pre-bid teleconference and site visit on November 23, 2026. Required submission documents include a signed proposal page, a completed price quotation table, a W-9 form, and bid security in the form of a certified check, irrevocable letter of credit, or bid bond. The successful contractor must provide a performance bond and maintain workers compensation and commercial general liability insurance.
Nebraska Public Power District

POSTED

about 19 hours ago

DEADLINE

in about 1 month
NAICS: 237130
New
SLED
Traffic Signal Synchronization Project Along Hamner Ave And Archibald Ave
Solicitation # 26-119CIP
The City of Eastvale, California, is soliciting bids for the Traffic Signal Synchronization Project Along Hamner Avenue and Archibald Avenue under solicitation number 26-119CIP. The project involves the installation of traffic signal controllers, field ethernet switches, fiber optic trunk and breakout cables, and conflict monitor units, as well as the implementation of hybrid detection systems. The scope includes significant infrastructure work such as installing PVC conduits, pull boxes, and performing pavement restoration. All work must be completed within 50 working days from the commencement date and must adhere to the standards of the County of Riverside, Caltrans, and the Americans with Disabilities Act. The contract will be awarded to the apparent low bidder based on the total bid price, including the base bid and specific alternates. To be eligible, the prime contractor must hold a current California Class A General Engineering Contractor license. Required submission documents include a signed bid form, bid security, a statement of qualifications, and a non-collusion declaration, all submitted via the PlanetBids portal. The selected contractor will be required to provide construction performance, labor and material payment, and warranty bonds. Payment will be administered on a lump sum basis according to an approved schedule of values, with final payment contingent upon the submission of project record drawings and the execution of a release of claims.
City of Eastvale

POSTED

2 days ago

DEADLINE

in 14 days
NAICS: 237130
New
Federal
CSSC Utility Feed Transformer Replacement
Solicitation # W912P627SSA001
The U.S. Army Corps of Engineers, Chicago District, is conducting market research via Sources Sought Notice W912P627SSA001 to identify qualified small business contractors for the turnkey removal and replacement of two utility feed transformers at the Chicago Sanitary and Ship Canal Fish Dispersal Barrier facility in Lockport, Illinois. The project involves the removal and disposal of two existing 4,000/5,000 kVA transformers and the installation, testing, and commissioning of two new operational replacements. The contractor will be responsible for all labor, materials, equipment, rigging, and supervision, while existing concrete pads, cabling, and switchgear will be reused. The estimated magnitude of construction is between 500,000 and 1,000,000 dollars, with an estimated project schedule of 365 calendar days. Interested firms must demonstrate technical capabilities in medium-voltage electrical work, including pre-energization electrical acceptance testing in accordance with NETA ATS and IEEE C57 standards. Key requirements include the ability to supply biobased dielectric insulating fluid and steel enclosures with recovered materials, as well as strict adherence to USACE EM 385-1-1 and NFPA 70E safety standards. Applicants must provide their small business status under NAICS code 237130, proof of bonding capacity, and up to three relevant project examples from the last five years. Responses, which should not include price quotes, are due by November 5, 2026, and must be submitted using the provided response template.
W072 Endist Chicago

POSTED

2 days ago

DEADLINE

in 7 days

AI Contract Overview

Show more

The City of Thousand Oaks is soliciting bids for Project CI 5725, which involves the installation of infrastructure for 17 new streetlights along a one-mile segment of Avenida De Los Arboles in Thousand Oaks, California. The scope of work includes the installation of approximately 3,650 linear feet of underground conduits and pullboxes, with final streetlight construction to be performed by Southern California Edison. Extensive restoration is required, including a full-width street overlay on Calle Abedul, trench repairs, and the reconstruction of concrete sidewalks, curb and gutter, curb ramps, driveways, a retaining wall, and landscaping. The engineer's estimate for this project is 539,000 dollars, and contractors must possess a Class A General Engineering License to be eligible. Bids are due by 4:00 PM on July 29, 2026, and must be submitted via the OpenGov portal. Requirements include a 10 percent bid bond, which can be provided electronically through Surety2000 or as a hard copy. This solicitation is categorized under NAICS code 237130 and is managed by the City of Thousand Oaks Engineering department.

General Info

Thousand Oaks seeks Class A contractors for streetlight infrastructure installation by July 29, 2026.

Place of Performance

Thousand Oaks, CA, 91362, USA

Set-Aside

NONE

Documents

4

CI 5725 - Street Lighting on Avenida de los Arboles Project Plans

PDF, High priority: read this firstspecifications
High

CI 5725 - Street Lighting on Avenida De Los Arboles (Spec No. 2025/2026-23)

PDF, High priority: read this firstrfb
High

Spec 2025/2026-23 Addendum No. 1 - Street Lighting on Avenida De Los Arboles

PDF, High priority: read this firstamendment
High

RFQ 2026-03 Professional Land Surveying and Map Checking Services - Planholder List

PDF, Low priorityother
Low

AI Contract Breakdown

Uniform Contract Format

Contract not broken down yet

CLEATUS splits the solicitation into Uniform Contract Format (UCF) sections: scope, pricing, deliverables, and evaluation criteria.

Timeline

PhaseClosed
Posted

Solicitation

Response Deadline

Deadline has passed

Submission Closed

Find active opportunities like this

Get full access to discover similar active contracts, track opportunities, and build proposals with AI assistance.

Organization & Contact Information

Show more
AgencyCalifornia → City of Thousand Oaks
Contacts1 person available
OfficeN/A
Office AddressN/A
Contacts
Norasaze NanaEngineering Associate

Full Description

Show more
Bid #2025/2026-23: The project involves installing infrastructure for 17 new streetlights along a one-mile segment of Avenida De Los Arboles. The work includes installing approximately 3,650 LF of underground conduits and pullboxes. Restoration work includes a full-width street overlay on Calle Abedul, trench repairs, and reconstruction of curb ramps, concrete sidewalks, curb and gutter, driveways, a retaining wall, and landscaping. Southern California Edison (SCE) will perform the final streetlight construction.

More opportunities from California → City of Thousand Oaks

Same awarding agency

NAICS: 237110
SLED
Collections Square Maintenance Hole Upgrades Phase II
Solicitation # 2026/2027-05
The City of Thousand Oaks is soliciting bids for the Collections Square Maintenance Hole Upgrades Phase II (Project CI 5786, Solicitation 2026/2027-05), focusing on the rehabilitation of manhole structures at four sites within private property easements in the Lynn Ranch area. The scope of work includes replacing rectangular precast concrete lids with new hatches or round frames and covers, performing minor excavation, backfill, and surface restoration, and applying an internal lining product. This lining process involves pressure washing the interiors, repairing voids with cementitious products, applying a spray liner, and conducting holiday testing. The project must be completed within 75 calendar days from the Notice to Proceed, with a base schedule of 90 days that accounts for three inclement weather days. The contract will be awarded to the lowest responsive and responsible bidder. Requirements for submission include electronic bids via the designated portal by November 18, 2026, and the provision of bid security, with the successful bidder required to furnish performance and payment bonds equal to 100 percent of the contract price. Contractors must adhere to California prevailing wage laws, ADA compliance, and specific waste management and safety standards. Payment is structured as monthly progress payments at 95 percent of the work value, with a final 5 percent retention paid within 60 days of the Notice of Completion. Key deliverables include three-week lookahead schedules and final as-built documentation.
Water and Sewer Line and Related Structures Construction

POSTED

9 days ago

DEADLINE

in 20 days
View Details

Earlier notices in this NAICS code

Posted before this notice, open and closed

Find Active Opportunities Like This

Get AI-powered intelligence on the opportunities still open

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 750+ contractors already using CLEATUS