Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, August 5 at 2:00 PM EDT

Register Free →

CITY-1554, Citywide Catch Basin Retrofits - Phase 3

Active
State & Local

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

AI Contract Overview

Show more

The City of Industry in California is preparing to retrofit 63 existing catch basins citywide by installing Connector Pipe Screens and Automatic Retractable Screens as part of Phase 3 of its catch basin improvement initiative. This project aims to enhance stormwater management by filtering debris and preventing blockages in the drainage system, thereby reducing pollution and improving infrastructure efficiency. The work will be conducted throughout the city, with all performance occurring in Industry, CA, specifically within the 91744 zip code area. The initiative is forecasted to be publicly posted on July 22, 2026, though formal solicitation details have not yet been released. Point of contact for inquiries is Mathew Hudson, Director of Public Works, who can be reached via phone or email provided by the City.

General Info

Retrofit 63 catch basins in City of Industry with screens to improve stormwater drainage and reduce pollution.

Agency

California → City of Industry

NAICS

237990 - Other Heavy and Civil Engineering ConstructionView NAICS

Place of Performance

Industry, CA, 91744

Set-Aside

NONE

Documents

(1)

CITY-1554 Citywide Catch Basin Retrofits - Phase 3 Notice of Exemption

PDFspecial-notice

AI Contract Breakdown

Uniform Contract Format

What is UCF?

Uniform Contract Format (UCF) uses AI to break down any contract into standardized sections—scope, pricing, deliverables, and evaluation criteria.

Timeline

Posted

forecast

Ready to pursue this opportunity?

Start your free trial to track this contract, build proposals with AI assistance, and manage your pipeline.

Organization & Contact Information

Show more
AgencyCalifornia → City of Industry
Contacts1 person available
OfficeN/A
Organization / Agency
California → City of Industry
Office AddressN/A
Contacts
Mathew HudsonDirector of Public Works

Full Description

Show more
This project is to retrofit 63 existing catch basins to add Connector Pipe Screens (CPS) and Automatic Retractable Screens (ARS) throughout the City.

Similar Contracts

Same NAICS industry code

NAICS: 237990
New
SLED
AIRFIELD 2030 ALL PROJECTS (AIP / AUI / CIRCUITS / FOD) CombinedThe contract encompasses a broad range of airfield infrastructure improvements at the Port of Seattle, focusing on modernization, safety, and operational reliability. Key efforts include replacing aging airfield lighting circuits with low megger readings with new LED fixtures and signs to enhance visibility and energy efficiency. Concurrently, failing pavement sections and critical underground utilities will be removed and replaced to ensure structural integrity and prevent service disruptions. Wildlife hazard mitigation is addressed through the removal of turf edge dams along runways, taxiways, and access roads, installation of anti-perching devices on signage to deter birds, and the regrading of low-lying areas coupled with new storm drainage infrastructure to eliminate ponding that attracts wildlife. Additionally, deteriorating flush fire hydrant access hatches will be replaced to ensure rapid and unimpeded access for emergency response teams. The work is part of the larger AIRFIELD 2030 initiative and falls under NAICS code 237990, with all performance obligations tied to the Port of Seattle’s aviation facilities. The contract is forecasted under the Aviation Project Management Group and will be managed by Yanet Maldonado, the primary point of contact, who can be reached via phone or email for inquiries. There is no formal solicitation number yet, and the contract is currently in the pre-solicitation phase with a posted date of July 23, 2026. No set-aside provisions are specified, and the location of performance is centered on the Port of Seattle’s airfield assets. All components of this project are designed to enhance safety, regulatory compliance, and long-term operational resilience of the airfield infrastructure.
Aviation Project Management Group

POSTED

about 8 hours ago

DEADLINE

N/A
View Details
NAICS: 237990
New
SLED
2027 Airfield Project - Contract 2The contract, titled 2027 Airfield Project - Contract 2, issued by the Port of Seattle through its Aviation Project Management Group, encompasses a wide range of airfield infrastructure improvements aimed at enhancing safety, efficiency, and compliance. Key tasks include replacing airfield lighting circuits that exhibit low megger readings with new LED lighting fixtures and signs to improve visibility and reduce maintenance costs. Concurrently, failing pavement sections and critical utility systems will be replaced to ensure structural integrity and operational reliability across the airfield. Wildlife hazard mitigation measures are also included, such as the removal of turf edge dams along runways, taxiways, and access roads, installation of anti-perching devices on signage, and the regrading of areas with ponding issues alongside the installation of new storm drainage infrastructure to reduce bird attraction and improve water runoff. Additionally, the project involves replacing deteriorated flush fire hydrant access hatches to ensure rapid and unimpeded access for emergency response. The work is classified under NAICS code 237990 and is forecasted for future award, with the solicitation posted on July 23, 2026. Primary point of contact is Moraa Omwega, reachable via email and phone, with David Neds serving as the Project Manager for technical oversight. The contract is intended for performance at the Port of Seattle’s airfield facilities, though exact location details are not specified in the metadata, and interested parties are directed to the official portal for further details.
Aviation Project Management Group

POSTED

about 8 hours ago

DEADLINE

N/A
View Details