Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, August 5 at 2:00 PM EDT

Register Free →

Owens Creek Stream Gauge Vegetation Removal

Active
State & Local

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

AI Contract Overview

Show more

Vegetation will be manually removed from the bubbler line and staff gauge within the dry channel of Owens Creek using hand tools and a weed eater, ensuring unobstructed access and accurate operation of the stream gauge station. Work will extend ten feet upstream and downstream of the station, clearing vegetation from the levee road down to the current waterline to maintain functional visibility and routine maintenance access. The effort supports reliable water data collection and is essential for the continued performance of the monitoring station. The project directly benefits local farmers, residents, and nearby jurisdictions by preserving accurate hydrologic information critical for water management and flood preparedness in Merced County, California. The work is under the jurisdiction of the California Department of Water Resources, with primary contact held by Senior Engineer Hossein Aghazeynai.

General Info

Manual vegetation removal from Owens Creek gauge station to ensure accurate water data and maintenance access.

Agency

California Water Resources, Department of

NAICS

237990 - Other Heavy and Civil Engineering ConstructionView NAICS

Place of Performance

Sandy Mush Road and Dan McNamara Road, Merced, CA

Set-Aside

NONE

Documents

(1)

OCD NOE 2026 Owens Creek Stream Gauge Vegetation Removal

PDFnotice-of-exemption

AI Contract Breakdown

Uniform Contract Format

What is UCF?

Uniform Contract Format (UCF) uses AI to break down any contract into standardized sections—scope, pricing, deliverables, and evaluation criteria.

Timeline

Posted

forecast

Ready to pursue this opportunity?

Start your free trial to track this contract, build proposals with AI assistance, and manage your pipeline.

Organization & Contact Information

Show more
AgencyCalifornia Water Resources, Department of
Contacts1 person available
OfficeN/A
Organization / Agency
California Water Resources, Department of
Office AddressN/A
Contacts
Hossein AghazeynaiSenior Engineer, Water Resources

Full Description

Show more
Hand tools and a weed eater will be used to remove vegetation from the bubbler line and staff gauge within the dry channel of the Owens Creek. Vegetation will also be removed 10 feet up- and downstream of the Owens Creek stream gauge station from the levee road down to the current waterline. The work is necessary to maintain access to the station and for proper operation of the station. Local farmers, residents, and local jurisdictions will benefit.

Similar Contracts

Same NAICS industry code

NAICS: 237990
New
SLED
AIRFIELD 2030 ALL PROJECTS (AIP / AUI / CIRCUITS / FOD) CombinedThe contract encompasses a broad range of airfield infrastructure improvements at the Port of Seattle, focusing on modernization, safety, and operational reliability. Key efforts include replacing aging airfield lighting circuits with low megger readings with new LED fixtures and signs to enhance visibility and energy efficiency. Concurrently, failing pavement sections and critical underground utilities will be removed and replaced to ensure structural integrity and prevent service disruptions. Wildlife hazard mitigation is addressed through the removal of turf edge dams along runways, taxiways, and access roads, installation of anti-perching devices on signage to deter birds, and the regrading of low-lying areas coupled with new storm drainage infrastructure to eliminate ponding that attracts wildlife. Additionally, deteriorating flush fire hydrant access hatches will be replaced to ensure rapid and unimpeded access for emergency response teams. The work is part of the larger AIRFIELD 2030 initiative and falls under NAICS code 237990, with all performance obligations tied to the Port of Seattle’s aviation facilities. The contract is forecasted under the Aviation Project Management Group and will be managed by Yanet Maldonado, the primary point of contact, who can be reached via phone or email for inquiries. There is no formal solicitation number yet, and the contract is currently in the pre-solicitation phase with a posted date of July 23, 2026. No set-aside provisions are specified, and the location of performance is centered on the Port of Seattle’s airfield assets. All components of this project are designed to enhance safety, regulatory compliance, and long-term operational resilience of the airfield infrastructure.
Aviation Project Management Group

POSTED

about 8 hours ago

DEADLINE

N/A
View Details
NAICS: 237990
New
SLED
2027 Airfield Project - Contract 2The contract, titled 2027 Airfield Project - Contract 2, issued by the Port of Seattle through its Aviation Project Management Group, encompasses a wide range of airfield infrastructure improvements aimed at enhancing safety, efficiency, and compliance. Key tasks include replacing airfield lighting circuits that exhibit low megger readings with new LED lighting fixtures and signs to improve visibility and reduce maintenance costs. Concurrently, failing pavement sections and critical utility systems will be replaced to ensure structural integrity and operational reliability across the airfield. Wildlife hazard mitigation measures are also included, such as the removal of turf edge dams along runways, taxiways, and access roads, installation of anti-perching devices on signage, and the regrading of areas with ponding issues alongside the installation of new storm drainage infrastructure to reduce bird attraction and improve water runoff. Additionally, the project involves replacing deteriorated flush fire hydrant access hatches to ensure rapid and unimpeded access for emergency response. The work is classified under NAICS code 237990 and is forecasted for future award, with the solicitation posted on July 23, 2026. Primary point of contact is Moraa Omwega, reachable via email and phone, with David Neds serving as the Project Manager for technical oversight. The contract is intended for performance at the Port of Seattle’s airfield facilities, though exact location details are not specified in the metadata, and interested parties are directed to the official portal for further details.
Aviation Project Management Group

POSTED

about 8 hours ago

DEADLINE

N/A
View Details