Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, September 2 at 2:00 PM EDT

Register Free →

This Solicitation opportunity from California was posted on July 6, 2026. The submission period has ended. Browse the details below for market research, or find similar active opportunities.

City Fleet Electrification, Phase 2

Closed
20260703009State & Local

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

Active Opportunities Like This One

NAICS: 237130
New
Federal
SP-364 Replace Underground Cabling in SP Area
Solicitation # N4008526R0249
Solicitation N4008526R0249 is an 8(a) set-aside Indefinite Delivery/Indefinite Quantity contract issued by the Naval Facilities Engineering Systems Command Mid-Atlantic. The project, titled SP-364 Replace Underground Cabling in SP Area, involves replacing underground electrical cabling from SW 111 at SP-35 to manholes serving buildings SP-254, 257, 362, 364, and 366, as well as installing above-ground junction boxes near SP-254 and 257. Performance will take place at Naval Station Norfolk, Virginia, with a total completion period of 330 calendar days from the date of the task order award. Award will be granted to the eligible offeror submitting the lowest price based on the total sum of Contract Line Item 0001AA and the extensions of items 0001AB through 0001AE. The contractor must provide a project superintendent with at least 10 years of construction experience, including 5 years on projects of similar complexity, and a site-based Quality Control Manager. Key requirements include adherence to USACE EM 385-1-1 safety standards, the submission of a Government-approved Salvage Plan, and compliance with NETA ATS and various ASTM standards for electrical and materials testing. Invoicing is managed via Wide Area Work Flow (WAWF) using specific NAVFAC forms, and payments are governed by FAR 52.232-5 and FAR 52.232-27. Proposals must be submitted electronically through the PIEE Solicitation Module by September 7, 2026, at 1400 EDT.
Navfacsyscom Mid-Atlantic

POSTED

about 21 hours ago

DEADLINE

in 10 days

AI Contract Overview

Show more

The City of Livermore is soliciting bids for Phase 2 of its Fleet Electrification project, which involves installing 96 Level 2 and 4 Level 3 DC Fast EV chargers across five citywide locations. The scope encompasses all associated electrical infrastructure including trenching, underground ductbanks, conductors, switchgear, transformers, and panelboards, alongside site work such as demolition, concrete foundations, ADA improvements, asphalt and pavement restoration, signing, striping, and chain-link fencing. Material and equipment must adhere to specific approved models, including ChargePoint CP6621B-80A-L5.5, CP6611B-80A-L5.5, 6613B-80A-L5.5 for Level 2 chargers and Kempower C801-P160-UN-5 for Level 3 units. All work must comply with Cal-OSHA, CalTrans, and City Standard Specifications, with inspections governed by NFPA 70, NFPA 70E, NETA ATS-2023, UL, NECA, and ANSI Z535.4 standards. Electrical installations require arc flash labeling per NFPA 70E, proper labeling per UL 969, and adherence to manufacturer instructions when more stringent than code. The contractor must hold a valid California C-10 Electrical license with A or B classification, be registered with the Department of Industrial Relations, and ensure all on-site electricians are EVITP certified with submitted documentation. A revocable $135,000 unforeseen conflicts contingency fund is included, along with fixed pricing for mobilization at $100,000 and operations and maintenance documentation at $54,000, yielding an estimated contract value of $289,000. Bid submissions are due by August 11, 2026, through the City Clerk’s Office or designated online portals, with proposals required in PDF format, free of passwords, and following specific naming conventions. No federal FAR clauses apply; instead, local provisions govern contractual obligations. Key compliance areas include FAA Form 7460-1 for the LVK Site, a zero-tolerance FOD policy, temporary fencing requirements near airfield areas, and mandatory online driver safety training. Payment mechanisms are based on monthly applications supported by a Schedule of Values, with no federal accounting codes or electronic invoicing systems

General Info

Livermore seeks bids to install 96 Level 2 and 4 DC fast chargers with full electrical and site infrastructure.

Agency

California → City of LivermoreView Agency

NAICS

237130 - Power and Communication Line and Related Structures ConstructionView NAICS

Place of Performance

Livermore, CA, 94550, USA

Set-Aside

NONE

Documents

(4)

Addendum No. 1 to City Fleet Electrification Phase 2 Project BL202514

PDFamendment

Planholders List for Solicitation 1784227280806

PDFplanholders-list

BL202514 City Fleet Electrification Phase 2 Project Specifications Bid Set

PDFspecifications

Addendum No. 1 to City Fleet Electrification Phase 2 Project BL202514

PDFamendment

AI Contract Breakdown

Uniform Contract Format

Sign up to view the full breakdown with detailed analysis of each section.

Timeline

PhaseClosed
Posted

Solicitation

Response Deadline

Deadline has passed

Submission Closed

Find active opportunities like this

Start your free trial to discover similar active contracts, track opportunities, and build proposals with AI assistance.

Organization & Contact Information

Show more
AgencyCalifornia → City of Livermore
Contacts2 people available
OfficeN/A
Organization / Agency
California → City of Livermore
View Agency Profile
Office AddressN/A
Contacts
Bashir AnastasP.E., Project Engineer
Far LeversP.E, Assistant City Engineer

Full Description

Show more
Bid #BL202514: The project involves the installation of 96 Level 2 electric vehicle chargers and 4 Level 3 DC Fast Chargers at five citywide locations. The scope includes all associated electrical infrastructure, such as trenching, underground ductbanks, conductors, switchgear, transformers, and panelboards. Site work includes demolition, concrete foundations and pads, ADA improvements, asphalt and pavement restoration, signing, striping, and chain-link fencing.