Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, November 11 at 2:00 PM ET

Register Free →

City of Santa Cruz Routine Maintenance Project

Forecast
EPIMS-SCR-46003-R3State & Local

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

AI Contract Overview

Show more

The City of Santa Cruz has executed Lake and Streambed Alteration Agreement EPIMS-SCR-46003-R3 with the California Department of Fish and Wildlife, pursuant to Fish and Game Code section 1602. This agreement authorizes routine maintenance activities across numerous project sites within Santa Cruz County, including Moore Creek, San Lorenzo River, Pasatiempo Creek, and the Delaveaga Golf Course Irrigation Reservoir, among many others. The primary objectives of the project are to maintain adequate flood capacity and utility access, preserve existing stormwater and wastewater infrastructure, reduce fire fuel, remove non-native vegetation, and perform debris removal from illegal encampments. Authorized work is strictly limited to specific maintenance tasks such as the removal of obstructions, sediment, and invasive vegetation; the planting of native riparian plants; the repair of bank stabilization structures; and the maintenance of culverts and water infrastructure. The project was approved by the California Department of Fish and Wildlife on June 27, 2024, following a determination that the activities would not have a significant environmental effect within the department's jurisdiction. The City of Santa Cruz serves as the lead agency for the project, with Filipina Warren acting as the primary contact, while Alexis Harrison serves as the contact for the Department of Fish and Wildlife Bay Delta Region.

General Info

Santa Cruz agreement authorizes routine maintenance of local lakes and streambeds for flood control.

Agency

California → City of Santa Cruz

Place of Performance

CA

Set-Aside

NONE

Documents

0

No documents available

Documents will appear here when they are available.

AI Contract Breakdown

Uniform Contract Format

Sign up to view the full breakdown with detailed analysis of each section.

Timeline

PhaseForecast
Posted

forecast

Prepare for this forecast

Research the agency, track this forecast, and prepare your capture plan before the solicitation opens.

Organization & Contact Information

Show more
AgencyCalifornia → City of Santa Cruz
Contacts2 people available
OfficeN/A
Organization / Agency
California → City of Santa Cruz
Office AddressN/A
Contacts
Alexis HarrisonEnvironmental Scientist
Filipina WarrenLead Agency Contact

Full Description

Show more
The California Department of Fish and Wildlife (CDFW) has executed Lake and Streambed Alteration Agreement (EPIMS-SCR-46003-R3), pursuant to Fish and Game Code section 1602, the project Applicant, City of Santa Cruz, as represented by Filipina Warren. Routine maintenance activities authorized under this Agreement are strictly limited to specific categories, including removal of obstructions around structures and facilities; removal of sediment, debris, vegetation, and logs in channel beds; vegetation control on banks; planting of native riparian vegetation; removal of invasive vegetation; repair of hard bank stabilization structures; maintenance of culverts; burrowing rodent mitigation; installation of baffle plates; and maintenance of stormwater and wastewater infrastructure. The primary purpose of annual routine maintenance activities is to maintain adequate flood capacity and utility access, maintain existing stormwater and wastewater infrastructure, reduce fire fuel, remove non-native vegetation, and remove debris from illegal encampments.

Similar Contracts

Same NAICS industry code

NAICS: 237990
New
SLED
9801 - Madison LakeWay - SkyLine Improvements
Solicitation # 9801
Contract 9801 for the Madison LakeWay – SkyLine Improvements is a solicitation by the City of Madison for the construction of a half-mile linear parkway along the shoreline of Lake Monona adjacent to John Nolen Drive. The project scope is divided into a Base Bid, covering the installation of north and south pile-supported timber-framed boardwalks, pedestrian-scale lighting, enhanced paths, bicycle amenities, wayfinding signage, and extensive landscaping, and an Alternate Bid Item for the construction of the SkyLine Pier. The project also requires significant traffic control, including the implementation of vehicular and bicycle detours and the installation of curb, gutter, and colored concrete medians. The contract will be awarded to the lowest bidder based on unit prices and a grand total. Bidders must provide a bid bond of at least 5 percent of the bid and comply with strict Small Business Enterprise (SBE) participation goals and reporting requirements. Additionally, contractors must adhere to Best Value Contracting apprenticeship standards and non-discrimination policies. Technical requirements include the use of a Wisconsin-registered Professional Engineer for precast and connection designs, adherence to ADA guidelines for signage, and the provision of site mock-ups for masonry, metal, and wood elements. Construction must commence within seven calendar days of receiving a written notice to proceed.
City of Madison

POSTED

about 1 hour ago

DEADLINE

in about 1 month
View Details
NAICS: 237990
New
Federal
Maintenance Dredging of the Isle au Haut Thoroughfare near Isle au Haut, Maine
Solicitation # W912WJ27BA003
Solicitation W912WJ27BA003 is a 100 percent small business set-aside for the maintenance and advance maintenance dredging of the Isle au Haut Thoroughfare Federal Navigation Project in Maine. The project involves mechanically dredging approximately 3,355 cubic yards of highly compacted coarse sand, gravel, cobbles, and small boulders from a 1,200-foot long channel to a depth of -7 feet Mean Lower Low Water, with an additional one-foot allowable overdepth for a maximum depth of -8 feet. All dredged material will be transported and placed at the Flake Island Disposal Site to enhance juvenile lobster and cod habitats. The estimated price range for this effort is between 1,000,000 and 3,000,000 dollars. Performance is strictly governed by an environmental window from September 15, 2026, to March 15, 2027, with all dredging and disposal activities required to be completed by March 1, 2027. The mandatory performance period is 120 calendar days after the receipt of the Notice to Proceed. Award is based on a sealed bidding process under NAICS 237990, requiring performance and payment bonds. Contractors must utilize the Procurement Integrity Enterprise Environment for submissions and adhere to a three-phase quality control process, including preparatory, initial, and follow-up inspections, with all documentation managed via a Construction Management Platform.
W2SD Endist New England

POSTED

about 6 hours ago

DEADLINE

in 4 days
View Details
NAICS: 237990
New
Federal
Y--Timucuan Ecological and Historic Preserve TIMU-335
Solicitation # 140P2026R0081
Solicitation 140P2026R0081 is a Small Business Set-Aside, Firm-Fixed-Price contract issued by the National Park Service for the stabilization of the Kingsley Plantation shoreline at the Timucuan Ecological and Historic Preserve in Jacksonville, Florida. The project, estimated between $1 million and $5 million, involves repairing and extending a seawall damaged by Hurricane Ian. The scope of work includes selective demolition, the installation of a new weatherable rigid vinyl sheet pile wall with tie rods and deadman walls, the addition of a structural FRP composite sheet pile wall extension to the east, and various civil works such as excavation, limestone riprap installation, and spartina sea grass restoration. The mandatory performance period is 259 calendar days, with work required to begin within 10 days of award. Award selection will be based on the Best Value Continuum Tradeoff Process, where non-price factors—including technical approach, schedule, management approach, safety, project experience, key personnel experience, and past performance—are combined to be significantly more important than price. Due to the sensitive location, the contractor must adhere to strict environmental protection procedures to protect marine mammals, sea turtles, and endangered species, and must comply with the Marine Mammal Protection Act and the Endangered Species Act. Key personnel requirements include a Project Manager, Job Site Superintendent, Quality Control Manager, and Safety Manager. Invoicing is processed electronically through the U.S. Department of the Treasury's Invoice Processing Platform, requiring a signed cover letter from the Contracting Officer's Representative.
Dsc Contracting Services Division

POSTED

about 6 hours ago

DEADLINE

in 7 days
View Details

Earlier notices in this NAICS code

Posted before this notice, open and closed

Prepare for this forecast

Research this forecast and prepare for the solicitation

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 750+ contractors already using CLEATUS