Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, September 30 at 2:00 PM EDT

Register Free →

Shelterwood Crossings Project (Notification of Lake or Streambed Alteration, No. EPIMS-SON-52695-R3)

Active
State & Local

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

AI Contract Overview

Show more

The Shelterwood Crossings Project, identified by Lake and Streambed Alteration Agreement EPIMS Notification No. EPIMS-SON-52695-R3, is an agreement executed by the California Department of Fish and Wildlife with Shelterwood Collective. Located at five unnamed tributaries to Bearpen Creek in Sonoma County, California, the project involves the removal and replacement of four existing culverts with upsized corrugated metal pipe (CMP) to improve flow conveyance and reduce erosion. Additionally, the scope includes replacing a 20-foot-long culvert with a rock ford at map point 1.11, which involves removing existing concrete wingwalls, and reconstructing a low water crossing at map point 1.18 within its existing footprint. The project is categorized under a statutory exemption as a Class 2 categorical exemption, as it replaces existing structures with new ones of substantially the same purpose and capacity. Environmental management is a central component of the project, which will result in approximately 236 square feet of permanent riparian habitat impact from culvert extensions and new riprap, alongside approximately 2,460 square feet of temporary riparian impacts. The work also necessitates the removal of five riparian trees. To mitigate environmental disturbance, all construction activities must occur when the tributaries are dry and no surface water is present, with access and staging restricted to existing roads. Administrative oversight is provided by James Hansen, an Environmental Scientist with the California Department of Fish and Wildlife, while Nikola Alexandre serves as the project steward for Shelterwood Collective.

General Info

Shelterwood Collective will replace culverts and improve stream flow in Sonoma County tributaries.

Agency

California → Fish and Wildlife, Region 3 - Bay Delta, Fairfield

NAICS

237990 - Other Heavy and Civil Engineering ConstructionView NAICS

Place of Performance

CA

Set-Aside

NONE

Documents

(1)

EPIMS-SON-52695-R3 Shelterwood Crossings Project Notice of Exemption

PDFnotice-of-exemption

AI Contract Breakdown

Uniform Contract Format

Sign up to view the full breakdown with detailed analysis of each section.

Timeline

Posted

forecast

Ready to pursue this opportunity?

Start your free trial to track this contract, build proposals with AI assistance, and manage your pipeline.

Organization & Contact Information

Show more
AgencyCalifornia → Fish and Wildlife, Region 3 - Bay Delta, Fairfield
Contacts2 people available
OfficeN/A
Organization / Agency
California → Fish and Wildlife, Region 3 - Bay Delta, Fairfield
Office AddressN/A
Contacts
James HansenEnvironmental Scientist
Nikola AlexandreCo-Creator and Stewardship Lead

Full Description

Show more
The California Department of Fish and Wildlife has executed Lake and Streambed Alteration Agreement EPIMS Notification No. EPIMS-SON-52695-R3, pursuant to Section 1602 of the Fish and Game Code, to Shelterwood Collective. The project is limited to the removal and replacement of four existing culverts, removal of an existing culvert and replacement with a rock ford, and the reconstruction of an existing low water crossing, on five different unnamed tributaries to Bearpen Creek. The new culverts will be corrugated metal pipe (CMP) culverts, which will be upsized to properly convey flows and reduce erosion. The rock ford crossing at map point (MP) 1.11 will replace an existing approximately 20-foot-long culvert and include removal of the existing concrete wingwalls. The rock ford crossing at MP 1.18 will be reconstructed within the same footprint as the existing crossing with no new net impact. The project will result in approximately 40 linear feet (100 square feet) of new permanent impacts to riparian habitat from the extension of culverts, and an additional approximately 136 square feet of permanent impacts to riparian habitat in the form of new riprap. In total, the project will result in approximately 236 square feet of permanent impact to riparian habitat. The project will also result in approximately 2,460 square feet of temporary impacts to riparian habitat. A total of five riparian trees will be removed as part of this project. Access and staging will occur via existing roads. Work will occur when tributaries are dry, and no surface water is present.

Similar Contracts

Same NAICS industry code

NAICS: 237990
New
Haleiwa Small Boat Harbor Maintenance Dredging and Revetted Mole Repair
Solicitation # W9128A26BA002
Solicitation W9128A26BA002 is a firm-fixed-price contract issued by the U.S. Army Corps of Engineers Honolulu District for maintenance dredging and revetted mole repair at the Haleiwa Small Boat Harbor in Oahu, Hawaii. The project scope includes mobilization and demobilization, the dredging and ocean disposal of approximately 4,260 cubic yards of material to an approved offshore site south of Oahu, and the repair of the revetted mole involving stone rework, vegetation removal, and the installation of best management practices. The estimated contract value ranges from 1 million to 5 million dollars, with a performance period of 200 calendar days from the receipt of the notice to proceed. This opportunity is set aside for HUBZone small businesses, who receive a 10 percent price evaluation preference. Key requirements include the provision of performance and payment bonds, adherence to the Davis-Bacon Act, and the appointment of key personnel including a Project Manager, Project Superintendent, Quality Control System Manager, and Site Safety and Health Officer. Acceptance of the dredging work is based on multi-beam hydrographic survey data, while stone revetment is subject to visual inspection for defects. Bids must be submitted as sealed physical offers by September 30, 2026, as electronic submissions are not permitted. Liquidated damages for delays are set at 2,297 dollars per calendar day.
Healy Tibbitts Builders, Inc.

POSTED

about 11 hours ago

DEADLINE

in 8 days
View Details
NAICS: 237990
New
SLED
Mayo Park - Pond Creek Bank Improvements
Solicitation # 26-058
The Mayo Park Pond Creek Bank Improvements project is a construction effort by Santa Rosa County, Florida, designed to remedy severe creek bank erosion and enhance storm resiliency. The scope of work involves the excavation of unsuitable materials and the stabilization of approximately 100 linear feet of streambank using natural materials, including logs, tree limbs, stone, select fill, and native plantings. The project also includes an optional component, Bid Alternate A, which covers the repair of a damaged seawall along the western shore of the creek. All work must adhere to Santa Rosa County and FDOT standards, with technical oversight provided by Mott MacDonald. The contract is structured as a lump sum agreement with a substantial completion deadline of 120 calendar days and final completion within 150 calendar days from the notice to proceed. Financial terms include a 5% retainage on payments and liquidated damages of 1,685 dollars per day for delays. Bidders must provide a bid guarantee of 5% of the total price, and performance and payment bonds are required for contracts exceeding 200,000 dollars. The project is subject to various federal and state regulations, including the Build America, Buy America Act, the Davis-Bacon Act for prevailing wages, and Florida Statutes Chapter 119 regarding public records. A reimbursement agreement with the Florida Fish and Wildlife Conservation Commission provides a maximum compensation limit of 375,000 dollars for the stabilization efforts.
Engineering

POSTED

about 14 hours ago

DEADLINE

in 30 days
View Details
NAICS: 237990
New
Federal
LAKE PONTCHARTRAIN & VICINITY (LPV), FORESHORE RISK REDUCTION REPAIRS, REACH-1, 2, 3, & 4 Jefferson Parish, Louisiana (ED 24-006)
Solicitation # W912P826BA009
The U.S. Army Corps of Engineers, New Orleans District, is soliciting bids for the Lake Pontchartrain and Vicinity (LPV) Foreshore Risk Reduction Repairs project in Jefferson Parish, Louisiana. This unrestricted, firm fixed-price contract, identified by solicitation number W912P826BA009 and NAICS code 237990, has an estimated construction magnitude between $25 million and $100 million. The scope of work involves repairing existing foreshore protection and embankments across Reaches 1, 2, 3, and 4. Key activities include site access construction, demolition, clearing and grubbing, excavation, and the placement of embankment, geotextiles, and stone, as well as turf establishment and maintenance. Bids are due by 10:00 a.m. on October 19, 2026, with a question cutoff of October 2, 2026. Award will be made as a whole to a single bidder based on the provided unit prices, provided the bid is reasonable and balanced. The contractor must adhere to USACE EM 385-1-1 (2024) safety standards and FHWA MUTCD guidelines. Notable contract requirements include the use of approved testing laboratories, compliance with the Davis-Bacon Act, and the provision of performance and payment bonds. Liquidated damages for delays are set at $4,295.00 per calendar day. Performance begins following the approval of an Accident Prevention Plan and Contractor Quality Control Plan, with a preliminary project schedule due within 15 days of the Notice to Proceed.
W07V Endist New Orleans

POSTED

about 15 hours ago

DEADLINE

in 28 days
View Details

Ready to Pursue This Opportunity?

Get AI-powered intelligence on this solicitation and the ones like it

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 750+ contractors already using CLEATUS