Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, August 19 at 2:00 PM EDT

Register Free →

Shelterwood Crossings Project (Notification of Lake or Streambed Alteration, No. EPIMS-SON-52695-R3)

Active
State & Local

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

AI Contract Overview

Show more

The California Department of Fish and Wildlife has authorized the Shelterwood Crossings Project through a Lake and Streambed Alteration Agreement designated as EPIMS-SON-52695-R3, issued under Section 1602 of the Fish and Game Code. The project involves the removal and replacement of four existing culverts with new corrugated metal pipe culverts sized to improve flow conveyance and reduce erosion across five unnamed tributaries to Bearpen Creek in Sonoma County. One culvert will be replaced with a rock ford at map point 1.11, including removal of existing concrete wingwalls, while another rock ford at map point 1.18 will be reconstructed within its existing footprint without creating net new impact. Work is scheduled to occur only during dry conditions with no surface water present, using existing roads for access and staging. The project will result in approximately 236 square feet of permanent riparian habitat impact, including 100 square feet from culvert extensions and 136 square feet from new riprap, with an additional 2,460 square feet of temporary disturbance. Five riparian trees will be removed as part of the work. The project qualifies for a categorical exemption under Title 14, Section 15302 of the California Code of Regulations, as it involves the replacement of existing structures with substantially equivalent function and capacity, minimizing environmental disruption. No federal procurement clauses, contract values, pricing details, or formal solicitation elements are included, as this is a regulatory environmental authorization rather than a traditional federal contract. The agreement is administered by the California Department of Fish and Wildlife, Region 3 - Bay Delta, with primary oversight provided by Environmental Scientist James Hansen and Environmental Program Manager Craig J. Weightman. The proponent, Shelterwood Collective, is responsible for implementing all work in compliance with the approved plan and regulatory standards. All activities are confined to the specified locations along Bearpen Creek tributaries, with no delivery, shipping, packaging, invoicing, or payment terms outlined, reflecting the nature of the document as an environmental permitting instrument rather than a procurement contract.

General Info

Culvert replacements and rock fords authorized in Sonoma County to improve flow, with minimal habitat impact and dry-season work only.

Agency

California → Fish and Wildlife, Region 3 - Bay Delta, Fairfield

NAICS

237990 - Other Heavy and Civil Engineering ConstructionView NAICS

Place of Performance

CA

Set-Aside

NONE

Documents

(1)

EPIMS-SON-52695-R3 Shelterwood Crossings Project Notice of Exemption

PDFnotice-of-exemption

AI Contract Breakdown

Uniform Contract Format

Sign up to view the full breakdown with detailed analysis of each section.

Timeline

Posted

forecast

Ready to pursue this opportunity?

Start your free trial to track this contract, build proposals with AI assistance, and manage your pipeline.

Organization & Contact Information

Show more
AgencyCalifornia → Fish and Wildlife, Region 3 - Bay Delta, Fairfield
Contacts2 people available
OfficeN/A
Organization / Agency
California → Fish and Wildlife, Region 3 - Bay Delta, Fairfield
Office AddressN/A
Contacts
James HansenEnvironmental Scientist
Nikola AlexandreCo-Creator and Stewardship Lead

Full Description

Show more
The California Department of Fish and Wildlife has executed Lake and Streambed Alteration Agreement EPIMS Notification No. EPIMS-SON-52695-R3, pursuant to Section 1602 of the Fish and Game Code, to Shelterwood Collective. The project is limited to the removal and replacement of four existing culverts, removal of an existing culvert and replacement with a rock ford, and the reconstruction of an existing low water crossing, on five different unnamed tributaries to Bearpen Creek. The new culverts will be corrugated metal pipe (CMP) culverts, which will be upsized to properly convey flows and reduce erosion. The rock ford crossing at map point (MP) 1.11 will replace an existing approximately 20-foot-long culvert and include removal of the existing concrete wingwalls. The rock ford crossing at MP 1.18 will be reconstructed within the same footprint as the existing crossing with no new net impact. The project will result in approximately 40 linear feet (100 square feet) of new permanent impacts to riparian habitat from the extension of culverts, and an additional approximately 136 square feet of permanent impacts to riparian habitat in the form of new riprap. In total, the project will result in approximately 236 square feet of permanent impact to riparian habitat. The project will also result in approximately 2,460 square feet of temporary impacts to riparian habitat. A total of five riparian trees will be removed as part of this project. Access and staging will occur via existing roads. Work will occur when tributaries are dry, and no surface water is present.

Similar Contracts

Same NAICS industry code

NAICS: 237990
New
SLED
Town of Chelsea Accessibility Ramp RFP
Solicitation # 75037
The Town of Chelsea is seeking qualified contractors to remove and replace an accessibility ramp at Town Hall with a new structure that fully complies with current ADA standards while maintaining visual harmony with the building’s historic character. The preferred design enables direct access from the main sidewalk and requires detailed proposals specifying material choices such as composite or pressure-treated lumber, along with the style of posts and balusters. Contractors must evaluate the condition of existing foundations and footings, replacing any that are structurally inadequate, and are responsible for all field measurements, demolition, and proper disposal of the old ramp. Site preparation is essential, including modifying the ground as needed to ensure stable installation, and all work must be performed with care to protect adjacent buildings, landscaping, and utilities from damage during construction. Bids must be submitted by August 28, 2026, under solicitation number 75037, with all technical and compliance details clearly outlined in the proposal. The project is administered by the Vermont Department of Economic Development, and inquiries should be directed to Grants@chelseavt.us or 802-625-2023. While the solicitation is open to all eligible contractors, there is no set-aside designation, and the place of performance is in Chelsea, Vermont. Proposals will be evaluated based on adherence to accessibility requirements, design compatibility with the historic structure, thoroughness of the scope, and the quality of material and construction plans presented.
Department of Economic Development

POSTED

about 7 hours ago

DEADLINE

in 21 days
View Details
NAICS: 237990
New
Columbia Canal Embankment Repair Services
Solicitation # columbia-canal-embankment-repair-services
The City of Columbia is seeking contractors for the repair of the Columbia Canal embankment in Richland County, South Carolina, under solicitation number CIPDR 4241. This effort is targeted at restoring and stabilizing critical infrastructure along the canal, with work to be performed at the designated site in Columbia. The solicitation is set aside exclusively for small business concerns, including Small Disadvantaged Businesses, Women-Owned Small Businesses, HUBZone firms, Veteran-Owned Small Businesses, and Service-Disabled Veteran-Owned Small Businesses, ensuring opportunities for historically underrepresented and certified small entities. The North American Industry Classification System code for this project is 237990, indicating it falls under other heavy and civil engineering construction. Interested parties must submit responses by August 26, 2026, with inquiries directed to Chandler Worley of Phillips Heavy, Inc., the designated point of contact. The project has been posted through the U.S. Small Business Administration’s contracting portal and is administered under the agency’s efforts to promote equitable access to federal and municipal construction opportunities. While specific technical requirements are not detailed here, contractors are expected to have proven experience in civil earthwork, erosion control, and embankment stabilization to meet the structural and safety demands of the canal infrastructure. Further details and application instructions are available via the provided public link.
Phillips Heavy, Inc

POSTED

about 7 hours ago

DEADLINE

in 18 days
View Details
NAICS: 237990
New
SLED
STATE LET CONSTRUCTION CONTRACT, PALO PINTO CO, STATE PARK IMPROVEMENTS
Solicitation # 0902-39-050_0926
The Texas Department of Transportation is soliciting bids for State Park Improvements in Palo Pinto County, with an estimated contract value of $453,699.40 and a required completion time of 50 working days. The project is scoped broadly under the NAICS code 237990 and is administered through the Electronic State Business Daily (ESBD) with solicitation number 0902-39-050_0926, posted on August 7, 2026, and with a bid deadline of September 3, 2026. Bid submissions may be made electronically via the ESBD or through physical mail to the TxDOT Austin headquarters, and a bid guaranty of $9,000.00 is required. Performance will take place at Possum Kingdom State Park, and the contract does not include federal FAR clauses, as this is a state-level procurement. The agency has not specified detailed technical specifications, inspection criteria, or packaging requirements within the provided materials, directing bidders to consult the ESBD for full contract documents. No line-item pricing, key personnel requirements, options, or clauses related to socioeconomic set-asides are included, and the procurement is not designated for small business participation with a 0.0% SBE goal. The contracting office is located in Austin, with Jordan Perry listed as the point of contact for procurement inquiries, and the project control number is 0902-39-050 under agency code 601, though no TAS or ACRN is provided for accounting purposes. The contract type is not specified beyond being a state construction solicitation, and no formal evaluation factors, award methodology, or acceptance criteria are detailed in the available information.
Texas Department of Transportation

POSTED

about 7 hours ago

DEADLINE

in 27 days
View Details
NAICS: 237990
New
SLED
AL ROLLINS PARK IMPROVEMENTS RFP
Solicitation # PE-75552-NONST-2026-000000067
The City of Dalton is soliciting proposals for the construction of improvements to Al Rollins Park located at 521 Threadmill Road, including grading of existing baseball fields for artificial turf installation, concrete curbing, storm drainage systems, renovations to the press box and restroom building, soil and erosion control measures, new fencing, and construction of a new PE batting building. The contractor must provide all materials and labor necessary to complete the project in accordance with the Contract Documents and coordinate closely with the City on the scheduling and phasing of work. While the contractor is responsible for site preparation and infrastructure, the artificial turf system—including the turf, infill, stone base, nailers, and field drainage—will be supplied and installed under a separate contract by another party. All interested bidders are required to attend a mandatory Pre-Proposal Meeting on August 25, 2026, at 10:00 A.M. at the project site, with late arrivals not permitted. Proposals must be submitted in sealed envelopes to the City Finance Department at 300 W. Waugh Street by 10:00 A.M. on September 8, 2026. The City reserves the right to request additional information or conduct interviews with proposers and may shortlist firms prior to award. Short-listed contractors will be notified by the close of business on September 9, 2026, and interviews or presentations will take place on September 14 and 15, 2026. Evaluation will consider qualifications, experience, compliance with requirements, and proposed approach to the work. The solicitation number is PE-75552-NONST-2026-000000067, and all information and documentation related to the bid can be accessed via the provided online link. The point of contact for inquiries is Kenneth Harless, reachable at 706-529-5895 or KHARLESS@KRHARCHITECTS.COM.
City of Dalton

POSTED

about 7 hours ago

DEADLINE

in about 1 month
View Details
NAICS: 237990
New
Federal
MRL Carrollton Phase III Storage
Solicitation # W912P8-26-B-A080
The U.S. Army Corps of Engineers New Orleans District is preparing to issue an Invitation for Bids under solicitation number W912P8-26-B-A080 for the construction of a new pre-engineered metal storage building at the Carrollton Phase III facility in New Orleans, Louisiana. This procurement is designated as a Total Small Business Set-Aside under NAICS code 237990 with an estimated value between one and five million dollars. The work encompasses demolition, site clearance, excavation, backfill, utility relocations, construction of a reinforced concrete foundation and pavement, installation of the metal building, chain-link fencing with a gate, and all related incidental tasks necessary to complete a fully functional facility. The contract will be awarded on a Firm-Fixed-Price basis using commercial procedures, and all bids must be submitted in response to the formal solicitation expected to be posted on the System for Award Management website. Interested contractors must maintain an active SAM registration to be eligible for award, as paper copies of the solicitation will not be distributed and all documents, including amendments, will be available exclusively online through SAM. The solicitation is anticipated to be posted on or about the published date, with proposals due by September 21, 2026. Offerors are required to monitor the SAM website regularly for updates and changes. The primary point of contact for questions is Francesca DeBoer of the New Orleans District, with Christopher Nuccio listed as a secondary contact. No technical or contractual inquiries will be accepted or answered prior to the official issuance of the solicitation, and all information contained in this synopsis is subject to change.
W07V Endist New Orleans

POSTED

about 11 hours ago

DEADLINE

in about 1 month
View Details
NAICS: 237990
New
Federal
Design-Bid-Build, Dredging at JEBLC Fuel Pier and Anzio Beach Sandbar, and JEBFS Utah Beach Sandbar, Joint Expeditionary Base Little Creek - Fort Story, Virginia Beach, VA
Solicitation # N4008526B0008
This solicitation, designated N4008526B0008, seeks qualified contractors for a Design-Bid-Build dredging project at Joint Expeditionary Base Little Creek–Fort Story in Virginia Beach, Virginia, encompassing the Fuel Pier, Anzio Beach Sandbar, and Utah Beach Sandbar. The work includes dredging sediment using a standard clamshell bucket, transporting material via scow or barge, and depositing it in a near-shore area, as well as constructing Berm Areas #8, #9, and #10 through hydraulic unloading, dewatering, grading, debris and vegetation removal, offsite disposal, and vegetation planting for stabilization. The project is estimated to range between $10 million and $25 million in value and requires contractors to demonstrate experience completing dredging projects with a production rate of at least 2,500 cubic yards per day and handling approximately 200,000 cubic yards of sediment using conventional equipment. Offerors must submit detailed project data for three to five completed, similar projects within the last five years, with all experience limited to their own direct performance; subcontractor experience is not accepted except under specific exceptions. The procurement follows FAR Part 14 sealed bidding procedures and is unrestricted for full and open competition, though if subsequently set aside for small businesses, the contract will include the limitation on subcontracting clause requiring the small business to perform at least 15 percent of the contract cost using its own employees. All respondents must be registered in SAM, provide their UEI and CAGE code, confirm small business status if applicable, and submit bonding capacity information including surety name and maximum per-project and aggregate bonding limits. Proposals must be submitted electronically as a single PDF under 4MB to Angela Clifton at the designated Navy email address by the deadline of September 1, 2026 at 6:00 p.m. Eastern Time, with only registered contractors receiving notifications of amendments.
Navfacsyscom Mid-Atlantic

POSTED

about 11 hours ago

DEADLINE

in 25 days
View Details
NAICS: 237990
New
SLED
Fay Creek Culvert Debris RemovalIn early 2023, a severe storm caused the failure of a 15-foot-diameter culvert beneath Salmon Creek Road, leading to the collapse of the roadway and the deposition of debris—including the damaged culvert, concrete, asphalt, and woody material—into Fay Creek. This obstruction disrupted surface-water flow and blocked critical fish passage. Sonoma County responded by installing a temporary one-lane Bailey bridge to maintain road access, but the debris remains in the creek, impairing aquatic connectivity. To address this, Sonoma County plans to remove approximately 50 feet of the failed culvert and all associated debris from a 50- by 100-foot section of the creek, potentially including an unstable concrete abutment from a prior bridge structure. The removal effort will occur during the dry season using hand tools and heavy equipment staged on Salmon Creek Road, with a temporary access route constructed adjacent to the Bailey bridge to allow an excavator to reach the work zone without entering the wetted channel. No trees will be removed, and minimal vegetation will be cleared only as absolutely necessary for safe operations. The California Department of Fish and Wildlife will coordinate dewatering and fish relocation to protect aquatic life. After debris removal, the site will be graded to match surrounding topography and stabilized with native seed, biodegradable erosion-control fabric, and fiber rolls. All removed materials will be hauled off-site for recycling or proper disposal, and strict erosion and spill prevention controls will be enforced throughout the work to ensure environmental protection and full restoration of natural stream function and aquatic passage.
Sonoma County

POSTED

about 16 hours ago

DEADLINE

N/A
View Details