Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, November 11 at 2:00 PM ET

Register Free →

Bayfront Canal Routine Maintenance (Notification of Lake or Streambed Alteration, No. EPIMS-SMO-55177-R3

Forecast
EPIMS-SMO-55177-R3State & Local

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

AI Contract Overview

Show more

The California Department of Fish and Wildlife has issued a Lake and Streambed Alteration Agreement, Notification No. EPIMS-SMO-55177-R3, for the Bayfront Canal Routine Maintenance project in San Mateo County. Executed on September 24, 2025, this regulatory exemption under the California Environmental Quality Act (CEQA) allows the City of Redwood City Public Works Services Department to perform essential maintenance to preserve water transport capacity and prevent flooding. The project scope involves the removal of overgrown cattail vegetation, trash, and debris from a 3,200-linear-foot section of the Bayfront Canal. Maintenance activities include using a crane and clam bucket to scoop vegetation onto an adjacent access road and levee for drying, after which it will be hauled away as green waste. Hand crews will also manually clear areas inaccessible to machinery, and all collected materials will be bagged and disposed of off-site. Strict performance constraints are in place to protect the canal environment, specifically prohibiting any heavy equipment, such as excavators or cranes, from entering the water and forbidding the dredging of sediment with the clam bucket. The project area is located in Redwood City, spanning from the portion of the canal behind Douglas Court to the area behind 3585 Haven Avenue. As this is a regulatory notice of exemption rather than a procurement action, there are no contract values, set-asides, or pricing schedules provided. Key points of contact for the project include Environmental Scientist Shannon Husband for the California Department of Fish and Wildlife and Terence Kyaw for the City of Redwood City.

General Info

Redwood City will perform Bayfront Canal maintenance under California Department of Fish Wildlife agreement.

Agency

California → Fish and Wildlife, Region 3 - Bay Delta, Fairfield

Place of Performance

Redwood City, CA

Set-Aside

NONE

Documents

0

No documents available

Documents will appear here when they are available.

AI Contract Breakdown

Uniform Contract Format

Sign up to view the full breakdown with detailed analysis of each section.

Timeline

PhaseForecast
Posted

forecast

Prepare for this forecast

Research the agency, track this forecast, and prepare your capture plan before the solicitation opens.

Organization & Contact Information

Show more
AgencyCalifornia → Fish and Wildlife, Region 3 - Bay Delta, Fairfield
Contacts2 people available
OfficeN/A
Organization / Agency
California → Fish and Wildlife, Region 3 - Bay Delta, Fairfield
Office AddressN/A
Contacts
Shannon HusbandEnvironmental Scientist
Terence KyawPerson or Public Agency Carrying Out Project

Full Description

Show more
The California Department of Fish and Wildlife has executed Lake and Streambed Alteration Agreement EPIMS Notification No. EPIMS-SMO-55177-R3, pursuant to Section 1602 of the Fish and Game Code to the City of Redwood City, Public Works Services Department as represented by Terence Kyaw. The Project involves “routine maintenance activities,” generally defined as periodic activities necessary to maintain the water transport capacity of Bayfront Canal. Maintenance activities include removal of overgrown cattail vegetation as well as trash and debris removal from 3,200 linear feet of a 6,400 linear-foot section of Bayfront Canal. Vegetation within the canal will be scooped using a crane and clam bucket and will be placed on top of the adjacent access road and levee to the north to dry. Once dried, it is loaded into trucks and hauled away as green waste. No heavy equipment (excavator, crane, etc.) will enter the canal at any time, and no dredging of sediment will be done with the clam bucket. Hand crews will manually remove vegetation and debris from areas the crane is unable to reach. All vegetative material, trash, and other debris will be bagged and hauled off-site for disposal.

Similar Contracts

Same NAICS industry code

NAICS: 237990
New
SLED
Carroll Creek Stream Restoration - CIP# 350007 (MWBE Goals)
Solicitation # IFB-27-11
The City of Frederick is soliciting bids for the Carroll Creek Stream Restoration project (CIP# 350007), located near Old Gas House Pike and Fairview Cemetery in Frederick, Maryland. This comprehensive construction project involves in-stream structure installation, floodplain bench grading, bank stabilization, and extensive planting. Key technical requirements include the installation of reinforced soil lifts, rock sills, and various riparian plantings, with an engineer's estimated project cost of $6,884,784.12. The project is performed on a lump sum and unit price basis and requires strict adherence to Virginia OSHA Standards for excavation and Maryland Department of the Environment guidelines for waterway construction. The bid submission deadline is November 13, 2026, at 3:00 pm, with all responses submitted via the OpenGov Portal. Bidders must meet specific socioeconomic goals, including 31% MBE, 11% WBE, and 2% SDVOSB participation. Required financial securities include a bid bond of 5% of the bid price, followed by 100% performance and materialmen's bonds upon award, and a two-year maintenance bond upon completion. The contract includes a two-year guarantee on all work and stipulates liquidated damages of $500 per calendar day for delays beyond the substantial completion date. Award decisions will be based on the vendor's responsiveness to material requirements and their overall responsibility, including technical capacity and performance record.
Engineering

POSTED

41 minutes ago

DEADLINE

in 7 days
View Details
NAICS: 237990
New
SLED
9801 - Madison LakeWay - SkyLine Improvements
Solicitation # 9801
Contract 9801 for the Madison LakeWay – SkyLine Improvements is a solicitation by the City of Madison for the construction of a half-mile linear parkway along the shoreline of Lake Monona adjacent to John Nolen Drive. The project scope is divided into a Base Bid, covering the installation of north and south pile-supported timber-framed boardwalks, pedestrian-scale lighting, enhanced paths, bicycle amenities, wayfinding signage, and extensive landscaping, and an Alternate Bid Item for the construction of the SkyLine Pier. The project also requires significant traffic control, including the implementation of vehicular and bicycle detours and the installation of curb, gutter, and colored concrete medians. The contract will be awarded to the lowest bidder based on unit prices and a grand total. Bidders must provide a bid bond of at least 5 percent of the bid and comply with strict Small Business Enterprise (SBE) participation goals and reporting requirements. Additionally, contractors must adhere to Best Value Contracting apprenticeship standards and non-discrimination policies. Technical requirements include the use of a Wisconsin-registered Professional Engineer for precast and connection designs, adherence to ADA guidelines for signage, and the provision of site mock-ups for masonry, metal, and wood elements. Construction must commence within seven calendar days of receiving a written notice to proceed.
City of Madison

POSTED

about 2 hours ago

DEADLINE

in about 1 month
View Details
NAICS: 237990
New
Federal
Maintenance Dredging of the Isle au Haut Thoroughfare near Isle au Haut, Maine
Solicitation # W912WJ27BA003
Solicitation W912WJ27BA003 is a 100 percent small business set-aside for the maintenance and advance maintenance dredging of the Isle au Haut Thoroughfare Federal Navigation Project in Maine. The project involves mechanically dredging approximately 3,355 cubic yards of highly compacted coarse sand, gravel, cobbles, and small boulders from a 1,200-foot long channel to a depth of -7 feet Mean Lower Low Water, with an additional one-foot allowable overdepth for a maximum depth of -8 feet. All dredged material will be transported and placed at the Flake Island Disposal Site to enhance juvenile lobster and cod habitats. The estimated price range for this effort is between 1,000,000 and 3,000,000 dollars. Performance is strictly governed by an environmental window from September 15, 2026, to March 15, 2027, with all dredging and disposal activities required to be completed by March 1, 2027. The mandatory performance period is 120 calendar days after the receipt of the Notice to Proceed. Award is based on a sealed bidding process under NAICS 237990, requiring performance and payment bonds. Contractors must utilize the Procurement Integrity Enterprise Environment for submissions and adhere to a three-phase quality control process, including preparatory, initial, and follow-up inspections, with all documentation managed via a Construction Management Platform.
W2SD Endist New England

POSTED

about 6 hours ago

DEADLINE

in 4 days
View Details
NAICS: 237990
New
Federal
Y--Timucuan Ecological and Historic Preserve TIMU-335
Solicitation # 140P2026R0081
Solicitation 140P2026R0081 is a Small Business Set-Aside, Firm-Fixed-Price contract issued by the National Park Service for the stabilization of the Kingsley Plantation shoreline at the Timucuan Ecological and Historic Preserve in Jacksonville, Florida. The project, estimated between $1 million and $5 million, involves repairing and extending a seawall damaged by Hurricane Ian. The scope of work includes selective demolition, the installation of a new weatherable rigid vinyl sheet pile wall with tie rods and deadman walls, the addition of a structural FRP composite sheet pile wall extension to the east, and various civil works such as excavation, limestone riprap installation, and spartina sea grass restoration. The mandatory performance period is 259 calendar days, with work required to begin within 10 days of award. Award selection will be based on the Best Value Continuum Tradeoff Process, where non-price factors—including technical approach, schedule, management approach, safety, project experience, key personnel experience, and past performance—are combined to be significantly more important than price. Due to the sensitive location, the contractor must adhere to strict environmental protection procedures to protect marine mammals, sea turtles, and endangered species, and must comply with the Marine Mammal Protection Act and the Endangered Species Act. Key personnel requirements include a Project Manager, Job Site Superintendent, Quality Control Manager, and Safety Manager. Invoicing is processed electronically through the U.S. Department of the Treasury's Invoice Processing Platform, requiring a signed cover letter from the Contracting Officer's Representative.
Dsc Contracting Services Division

POSTED

about 6 hours ago

DEADLINE

in 7 days
View Details

Earlier notices in this NAICS code

Posted before this notice, open and closed

Prepare for this forecast

Research this forecast and prepare for the solicitation

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 750+ contractors already using CLEATUS