Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, September 16 at 2:00 PM EDT

Register Free →

North Tahoe Marina Long-Term Maintenance Suction Dredging

Active
State & Local

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

AI Contract Overview

Show more

The contract pertains to long-term maintenance suction dredging at the North Tahoe Marina in California, aimed at preserving navigable waterways over a ten-year period. The work involves periodic dredging to maintain a depth of 6,219 feet in the marina harbor and entry channel, conducted on an as-needed basis up to once annually. Each year, no more than 1,250 cubic yards of sediment will be removed from a designated 0.48-acre area, with a strict cumulative limit of 12,500 cubic yards over the entire contract term to ensure environmental compliance. The project is managed by the Regional Water Quality Control Board, Region 6, based in South Lake Tahoe, and is intended to balance operational navigation needs with ecological protection. The contract is forecasted and not yet solicited, with the primary point of contact being Elizabeth van Diepen, an Environmental Scientist, who can be reached via email or phone provided in the contract data. Work will take place entirely within California, specifically at the North Tahoe Marina, with no set-aside provisions or NAICS code designated. The environmental agency overseeing the project emphasizes adherence to water quality standards, and the dredging operations are structured to minimize disruption to aquatic ecosystems while maintaining safe passage for vessels. All activities will be constrained by the cumulative volume cap and annual limits to ensure sustainability and regulatory compliance throughout the decade-long effort.

General Info

Long-term suction dredging at North Tahoe Marina, annual limit 1,250 cubic yards, 12,500 cubic yards total over ten years.

Agency

California → Regional Water Quality Control Board, Region 6 - South Lake Tahoe

NAICS

237990 - Other Heavy and Civil Engineering ConstructionView NAICS

Place of Performance

CA

Set-Aside

NONE

Documents

(0)

No documents available

AI Contract Breakdown

Uniform Contract Format

No contract breakdown available.

Cannot generate Contract Breakdown because no documents were found from this contract's source.

Timeline

Posted

forecast

Ready to pursue this opportunity?

Start your free trial to track this contract, build proposals with AI assistance, and manage your pipeline.

Organization & Contact Information

Show more
AgencyCalifornia → Regional Water Quality Control Board, Region 6 - South Lake Tahoe
Contacts1 person available
OfficeN/A
Organization / Agency
California → Regional Water Quality Control Board, Region 6 - South Lake Tahoe
Office AddressN/A
Contacts
Elizabeth van DiepenEnviornmental Scientist

Full Description

Show more
The purpose of the Project is to regularly maintain boating navigation within the North Tahoe Marina over a ten-year period. This will be accomplished via suction dredging to a maintenance depth of 6,219’ in the marina harbor and entry channel on an as-needed basis, up to once per year. Up to 1,250 cubic yards of sediment will be dredged each year over a 0.48-acre area, with no more than a cumulative volume of 12,500 cubic yards dredged over the life of this WQC.

Similar Contracts

Same NAICS industry code

NAICS: 237990
New
Haleiwa Small Boat Harbor Maintenance Dredging and Revetted Mole Repair
Solicitation # W9128A26BA002
The U.S. Army Corps of Engineers Honolulu District is soliciting sealed bids for a firm-fixed-price contract to perform maintenance dredging and revetted mole repair at the Haleiwa Small Boat Harbor in Oahu, Hawaii. The project scope includes mobilization and demobilization, vegetation clearance, the dredging and ocean disposal of approximately 4,260 cubic yards of material to an approved offshore site south of Oahu, and the repair of the revetted mole through clearing, grubbing, and stone rework. The estimated value of the work ranges between 1 million and 5 million dollars, with a performance period of 200 calendar days from the receipt of the Notice to Proceed. This solicitation is set aside for HUBZone Small Businesses, who receive a 10 percent price evaluation preference. Bids must be submitted as sealed envelopes to Fort Shafter, Hawaii, as electronic submissions are not permitted. Award is based on the lowest responsive and responsible bidder. Key requirements include the provision of performance and payment bonds, adherence to the Davis-Bacon Act, and the appointment of key personnel, including a Project Manager, Project Superintendent, Quality Control System Manager, and Site Safety and Health Officer. Acceptance of the dredging work is contingent upon pre- and post-dredge multi-beam surveys meeting USACE accuracy standards. Failure to meet the delivery schedule may result in liquidated damages of 2,297 dollars per calendar day of delay.
Healy Tibbitts Builders, Inc.

POSTED

about 9 hours ago

DEADLINE

in 14 days
View Details
NAICS: 237990
New
SLED
Reclamation District No. 1600 DMP Drainage Pipe Replacement ProjectReclamation District No. 1600 is implementing the Deferred Maintenance Program Drainage Pipe Replacement Project in Yolo County, California. The project consists of the in-kind replacement of a 48-inch gravity drainage pipe and its associated gate structure, which have exceeded their functional lifespan. The pipe passes through a levee to convey water from agricultural lands east of Woodland into the Tule Canal within the Yolo Bypass. The replacement must maintain the existing pipe size, function, and alignment. The project is located southeast of Knights Landing at Levee Mile 0.36, District Station 19+20. The project has undergone environmental review in compliance with the California Environmental Quality Act, resulting in a Mitigated Negative Declaration. This assessment determined that the project would have no significant environmental impacts provided that specific mitigation measures for air quality, biological resources, hydrology, and cultural resources are implemented. Key administrative contacts include District President Michele Clark and Principal Engineer Mike Kynett of MBK Engineers. Special requirements include strict confidentiality regarding archaeological site locations and mandatory protocols for the discovery of human remains, requiring immediate notification of the County Coroner and the Native American Heritage Commission if applicable.
Reclamation District 1600

POSTED

about 18 hours ago

DEADLINE

N/A
View Details

Ready to Pursue This Opportunity?

Get AI-powered intelligence on this solicitation and the ones like it

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 750+ contractors already using CLEATUS