Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, November 11 at 2:00 PM ET

Register Free →

New Wastewater Treatment Plant

Forecast
Ridgecrest WWTP Addendum_08State & Local

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

General Info

Agency

California → City of Ridgecrest

Place of Performance

Ridgecrest, CA

Set-Aside

NONE

Documents

0

No documents available

Documents will appear here when they are available.

AI Contract Breakdown

Uniform Contract Format

Sign up to view the full breakdown with detailed analysis of each section.

Timeline

PhaseForecast
Posted

forecast

Prepare for this forecast

Research the agency, track this forecast, and prepare your capture plan before the solicitation opens.

Organization & Contact Information

Show more
AgencyCalifornia → City of Ridgecrest
Contacts1 person available
OfficeN/A
Organization / Agency
California → City of Ridgecrest
Office AddressN/A
Contacts
Ronald StrandCity Manager

Full Description

Show more
The City of Ridgecrest (City), located in the eastern portion of Kern County, desires to upgrade its current WWTP on land owned by the United States Department of the Navy (Navy) and would serve both the City of Ridgecrest and NAWS China Lake. As such, the Navy has served as a collaborator with the City in the production of this document. The Navy is also preparing a separate document in accordance with the National Environmental Policy Act. The Ridgecrest New WWTP Modified Project (Project) would be constructed adjacent to the existing WWTP, utilizing very little of the existing facility. The site is located on NAWS China Lake, approximately 3.5 miles northeast of the City center. The City has held an agreement with the Navy for an approximately 352-acre easement to operate a WWTP and 11 facultative treatment ponds on Navy-owned land since 1974, with the most recent modification of the contract on February 7, 1994. Two of these 11 ponds are out of service. In order to accommodate the expansion of the existing WWTP, the City requested, and was granted in 2020, an extension of the existing easement to include an additional 7.67 acres to the west of the existing WWTP. The Project would result in the construction of an upgraded WWTP to meet future residential and commercial growth through approximately 2050, repair existing treatment pond infrastructure, and improve the quality of the wastewater treated at the facility. Existing Conditions The existing WWTP has a permitted capacity of 3.6 million gallons per day (mgd), with a daily maximum discharge of 3.6 mgd. While the facility is rated for a maximum capacity of 3.6 mgd, the facility is aging and is not expected to be able to accommodate flows that would meet its permitted capacity. In 1993 daily flow reached approximately 3.3 mgd; however, due to a decrease in population and implementation of water conservation in conformance with California and local policy, daily flow levels (as of 2020) have declined to approximately 2.2 mgd. Additionally, in 2019 several earthquakes occurred which affected the area, causing damage to the distribution system of the 11 facultative treatment ponds located at the NAWS site. Under current operations, treated water is percolated into the underlying aquifer through the treatment ponds located at the NAWS site and the former City WWTP site, located approximately 3.25 miles southeast of the Project site. Additionally, recycled water that has undergone primary and secondary treatment is used for irrigation at the China Lake Golf Course, approximately one-quarter mile southeast of the Project site. The Navy disinfects the effluent before it is used for irrigation purposes. Under the City’s contract with the Navy to operate the WWTP, the Navy is allotted 525 acre-feet per year (AFY) of treated water, which is further treated within a sand filter prior to disinfection by the Navy and then used for irrigation purposes on the golf course. Previous Analysis and Approval A previous version of this Project was analyzed in an EIR that was certified by the City Council on July 6, 2016 (SCH No. 2015061095). The previous EIR analyzed two alternatives for the expansion of the City of Ridgecrest wastewater treatment plant (WWTP), from which the current Project differs. Alternative 1 proposed to demolish the existing WWTP and construct a new, upgraded facility on the same site, as described in Section 2.1.6, and also proposed the City to construct several new treatment ponds where the four percolation ponds currently exist in the southeastern portion of the City. Alternative 2 proposed the expansion of the treatment ponds at the NAWS China Lake site, the construction of an expanded gravity main pipeline, and the construction of a new WWTP south of the four existing percolation ponds in the southeastern portion of the City, along with several new treatment ponds at this site. Both of these alternatives proposed treatment ponds to be located within San Bernardino County, across the street from the nonoperational City WWTP. Project Scope Change Following certification of the EIR, the City and Navy continued to discuss the Project and eventually came to an agreement that the scope of the Project should change, deciding to upgrade the WWTP to be constructed adjacent to the existing facility. This would necessitate the removal of most of the existing facility. The upgrade and ultimate expansion of the existing facility would require the development of approximately 7.67 acres of land to the west of the current facility. This land has been added to the existing easement between the Navy and the City for construction of the improved WWTP. The Certified EIR analyzed a 3.6-mgd (average daily flow) wastewater facility, while the fully completed Project would construct a facility that can process up to 5.4 mgd (average daily flow). This was not previously analyzed in the Certified EIR. This Addendum analyzed processing up to 5.4-mgd but did not analyze disposal of this amount. Upon full buildout of the facility, it would only be able to dispose of up to 3.6 mgd (as this is what will be requested in the Report of Waste Discharge for the new plant). This Addendum only analyzes disposal of up to 3.6 mgd. Additionally, the proposed Project includes the future construction of pond 12. This pond is within the existing easement between the Navy and the City but was also not analyzed in the Certified EIR. The improvements would result in the construction of a new facility that would utilize primary clarifiers, extended aeration with activated sludge (oxidation ditches), secondary clarifiers to treat the wastewater, along with anaerobic digesters and cogeneration facilities to utilize the resulting biogas from the anaerobic digesters for power production. Further, the Project includes repairs to the existing infrastructure of the 11 treatment ponds that were damaged by earthquakes in 2019. While three other alternatives were presented in the EIR (not provided or discussed in this document), the current Project has been deemed the most appropriate and includes considerations such as cost, usability, maintenance, and lifespan of the equipment. Removed Project Components The proposed Project no longer includes the following components: • Construction of several new treatment ponds where the four percolation ponds currently exist in the southeastern portion of the City. • Irrigation of approximately 30 acres of alfalfa located 3.25 miles southeast of the Project site, at the former City WWTP. • The construction of an expanded gravity main pipeline. • The construction of a new WWTP south of the four existing percolation ponds in the southeastern portion of the City, along with several new treatment ponds at this site. No construction will take place in San Bernardino County. All construction will now take place on the NAWS site through an easement that the Navy has granted to the City.

Similar Contracts

Same NAICS industry code

NAICS: 237990
New
SLED
Carroll Creek Stream Restoration - CIP# 350007 (MWBE Goals)
Solicitation # IFB-27-11
The City of Frederick is soliciting bids for the Carroll Creek Stream Restoration project (CIP# 350007), located near Old Gas House Pike and Fairview Cemetery in Frederick, Maryland. This comprehensive construction project involves in-stream structure installation, floodplain bench grading, bank stabilization, and extensive planting. Key technical requirements include the installation of reinforced soil lifts, rock sills, and various riparian plantings, with an engineer's estimated project cost of $6,884,784.12. The project is performed on a lump sum and unit price basis and requires strict adherence to Virginia OSHA Standards for excavation and Maryland Department of the Environment guidelines for waterway construction. The bid submission deadline is November 13, 2026, at 3:00 pm, with all responses submitted via the OpenGov Portal. Bidders must meet specific socioeconomic goals, including 31% MBE, 11% WBE, and 2% SDVOSB participation. Required financial securities include a bid bond of 5% of the bid price, followed by 100% performance and materialmen's bonds upon award, and a two-year maintenance bond upon completion. The contract includes a two-year guarantee on all work and stipulates liquidated damages of $500 per calendar day for delays beyond the substantial completion date. Award decisions will be based on the vendor's responsiveness to material requirements and their overall responsibility, including technical capacity and performance record.
Engineering

POSTED

about 2 hours ago

DEADLINE

in 7 days
View Details
NAICS: 237990
New
SLED
9801 - Madison LakeWay - SkyLine Improvements
Solicitation # 9801
Contract 9801 for the Madison LakeWay – SkyLine Improvements is a solicitation by the City of Madison for the construction of a half-mile linear parkway along the shoreline of Lake Monona adjacent to John Nolen Drive. The project scope is divided into a Base Bid, covering the installation of north and south pile-supported timber-framed boardwalks, pedestrian-scale lighting, enhanced paths, bicycle amenities, wayfinding signage, and extensive landscaping, and an Alternate Bid Item for the construction of the SkyLine Pier. The project also requires significant traffic control, including the implementation of vehicular and bicycle detours and the installation of curb, gutter, and colored concrete medians. The contract will be awarded to the lowest bidder based on unit prices and a grand total. Bidders must provide a bid bond of at least 5 percent of the bid and comply with strict Small Business Enterprise (SBE) participation goals and reporting requirements. Additionally, contractors must adhere to Best Value Contracting apprenticeship standards and non-discrimination policies. Technical requirements include the use of a Wisconsin-registered Professional Engineer for precast and connection designs, adherence to ADA guidelines for signage, and the provision of site mock-ups for masonry, metal, and wood elements. Construction must commence within seven calendar days of receiving a written notice to proceed.
City of Madison

POSTED

about 3 hours ago

DEADLINE

in about 1 month
View Details
NAICS: 237990
New
SLED
22275 RB - Hague NE Bulkhead Rehabilitation
Solicitation # 22275 RB
The City of Norfolk, Virginia, is soliciting bids for the Hague NE Bulkhead Rehabilitation project (Solicitation 22275 RB), which involves the replacement of the concrete bulkhead at the eastern portion of the Hague. The scope of work includes bypass pumping, maintenance of flow in storm drainage systems, survey and vibration monitoring, wetland planting, and the disposal of contaminated soils, estimated at 695 tons for the North side and 315 tons for the South side. The project is structured as a Base Bid with three additives, with several items converted to lump sum costs. Performance must adhere to modified AIA A201-2017 General Conditions and technical specifications prepared by Moffatt & Nichol. The contract requires a performance bond and a labor and material payment bond, each for 100% of the contract price, and a bid security of 5% of the total bid. Work must commence within ten days of the Notice to Proceed and be completed within 700 calendar days. Bidders must be registered Virginia contractors and hold a City of Norfolk business license. All bids must be submitted electronically via the OpenGov portal by December 7, 2026, with all Requests for Information (RFIs) due by November 16, 2026. Quality control is managed through a CQC Plan and VDOT Form C-25, with final site inspection and acceptance conducted by the Contracting Engineer.
Public Works (D&C)

POSTED

about 6 hours ago

DEADLINE

in about 1 month
View Details
NAICS: 237990
New
Federal
Maintenance Dredging of the Isle au Haut Thoroughfare near Isle au Haut, Maine
Solicitation # W912WJ27BA003
Solicitation W912WJ27BA003 is a 100 percent small business set-aside for the maintenance and advance maintenance dredging of the Isle au Haut Thoroughfare Federal Navigation Project in Maine. The project involves mechanically dredging approximately 3,355 cubic yards of highly compacted coarse sand, gravel, cobbles, and small boulders from a 1,200-foot long channel to a depth of -7 feet Mean Lower Low Water, with an additional one-foot allowable overdepth for a maximum depth of -8 feet. All dredged material will be transported and placed at the Flake Island Disposal Site to enhance juvenile lobster and cod habitats. The estimated price range for this effort is between 1,000,000 and 3,000,000 dollars. Performance is strictly governed by an environmental window from September 15, 2026, to March 15, 2027, with all dredging and disposal activities required to be completed by March 1, 2027. The mandatory performance period is 120 calendar days after the receipt of the Notice to Proceed. Award is based on a sealed bidding process under NAICS 237990, requiring performance and payment bonds. Contractors must utilize the Procurement Integrity Enterprise Environment for submissions and adhere to a three-phase quality control process, including preparatory, initial, and follow-up inspections, with all documentation managed via a Construction Management Platform.
W2SD Endist New England

POSTED

about 7 hours ago

DEADLINE

in 4 days
View Details
NAICS: 237990
New
Federal
Borough of Millvale, Pennsylvania, Local Protection Project (LPP) PL84-99 Rehabilitation
Solicitation # W911WN27QA004
The Borough of Millvale Local Protection Project (LPP) rehabilitation is a USACE project located along Girty's Run in Millvale Borough, Pennsylvania. The scope of work involves repairing significant flood damage from April 2024, specifically addressing bank erosion, shoaling, ruptured gabion baskets, and washed-out concrete buttresses that currently impede streamflow. The contractor will be responsible for site preparation, including erosion and sediment controls and temporary water diversions, as well as the excavation and removal of debris, replacement of damaged concrete paving and gabions, and the placement of stone-filled gabions between Station 68+00 and Station 73+80. This is a 100% Small Business Set-Aside under NAICS 237990, with an anticipated construction cost between $300,000.00 and $350,000.00. The award will be a single Firm-Fixed-Price purchase order based on best value, evaluating price and past performance. The project must be completed within 365 calendar days of the written Notice to Proceed, with work commencing within 10 days of that notice. Key requirements include the provision of performance and payment bonds at 100% of the contract price, adherence to the Davis-Bacon Act, and the appointment of a Superintendent who cannot also serve as the Site Safety and Health Officer.
W072 Endist Pittsburgh

POSTED

about 7 hours ago

DEADLINE

in about 1 month
View Details

Earlier notices in this NAICS code

Posted before this notice, open and closed

Prepare for this forecast

Research this forecast and prepare for the solicitation

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 750+ contractors already using CLEATUS