Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, September 30 at 2:00 PM EDT

Register Free →

New Wastewater Treatment Plant

Active
State & Local

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

General Info

Agency

California → City of Ridgecrest

NAICS

237990 - Other Heavy and Civil Engineering ConstructionView NAICS

Place of Performance

Ridgecrest, CA

Set-Aside

NONE

Documents

(2)

Ridgecrest WWTP Addendum 08 Environmental Impact Report

PDFaddendum

CEQA Notice of Determination for New Wastewater Treatment Plant Modified Project Addendum

PDFnotice-of-determination

AI Contract Breakdown

Uniform Contract Format

Sign up to view the full breakdown with detailed analysis of each section.

Timeline

Posted

forecast

Ready to pursue this opportunity?

Start your free trial to track this contract, build proposals with AI assistance, and manage your pipeline.

Organization & Contact Information

Show more
AgencyCalifornia → City of Ridgecrest
Contacts1 person available
OfficeN/A
Organization / Agency
California → City of Ridgecrest
Office AddressN/A
Contacts
Ronald StrandCity Manager

Full Description

Show more
The City of Ridgecrest (City), located in the eastern portion of Kern County, desires to upgrade its current WWTP on land owned by the United States Department of the Navy (Navy) and would serve both the City of Ridgecrest and NAWS China Lake. As such, the Navy has served as a collaborator with the City in the production of this document. The Navy is also preparing a separate document in accordance with the National Environmental Policy Act. The Ridgecrest New WWTP Modified Project (Project) would be constructed adjacent to the existing WWTP, utilizing very little of the existing facility. The site is located on NAWS China Lake, approximately 3.5 miles northeast of the City center. The City has held an agreement with the Navy for an approximately 352-acre easement to operate a WWTP and 11 facultative treatment ponds on Navy-owned land since 1974, with the most recent modification of the contract on February 7, 1994. Two of these 11 ponds are out of service. In order to accommodate the expansion of the existing WWTP, the City requested, and was granted in 2020, an extension of the existing easement to include an additional 7.67 acres to the west of the existing WWTP. The Project would result in the construction of an upgraded WWTP to meet future residential and commercial growth through approximately 2050, repair existing treatment pond infrastructure, and improve the quality of the wastewater treated at the facility. Existing Conditions The existing WWTP has a permitted capacity of 3.6 million gallons per day (mgd), with a daily maximum discharge of 3.6 mgd. While the facility is rated for a maximum capacity of 3.6 mgd, the facility is aging and is not expected to be able to accommodate flows that would meet its permitted capacity. In 1993 daily flow reached approximately 3.3 mgd; however, due to a decrease in population and implementation of water conservation in conformance with California and local policy, daily flow levels (as of 2020) have declined to approximately 2.2 mgd. Additionally, in 2019 several earthquakes occurred which affected the area, causing damage to the distribution system of the 11 facultative treatment ponds located at the NAWS site. Under current operations, treated water is percolated into the underlying aquifer through the treatment ponds located at the NAWS site and the former City WWTP site, located approximately 3.25 miles southeast of the Project site. Additionally, recycled water that has undergone primary and secondary treatment is used for irrigation at the China Lake Golf Course, approximately one-quarter mile southeast of the Project site. The Navy disinfects the effluent before it is used for irrigation purposes. Under the City’s contract with the Navy to operate the WWTP, the Navy is allotted 525 acre-feet per year (AFY) of treated water, which is further treated within a sand filter prior to disinfection by the Navy and then used for irrigation purposes on the golf course. Previous Analysis and Approval A previous version of this Project was analyzed in an EIR that was certified by the City Council on July 6, 2016 (SCH No. 2015061095). The previous EIR analyzed two alternatives for the expansion of the City of Ridgecrest wastewater treatment plant (WWTP), from which the current Project differs. Alternative 1 proposed to demolish the existing WWTP and construct a new, upgraded facility on the same site, as described in Section 2.1.6, and also proposed the City to construct several new treatment ponds where the four percolation ponds currently exist in the southeastern portion of the City. Alternative 2 proposed the expansion of the treatment ponds at the NAWS China Lake site, the construction of an expanded gravity main pipeline, and the construction of a new WWTP south of the four existing percolation ponds in the southeastern portion of the City, along with several new treatment ponds at this site. Both of these alternatives proposed treatment ponds to be located within San Bernardino County, across the street from the nonoperational City WWTP. Project Scope Change Following certification of the EIR, the City and Navy continued to discuss the Project and eventually came to an agreement that the scope of the Project should change, deciding to upgrade the WWTP to be constructed adjacent to the existing facility. This would necessitate the removal of most of the existing facility. The upgrade and ultimate expansion of the existing facility would require the development of approximately 7.67 acres of land to the west of the current facility. This land has been added to the existing easement between the Navy and the City for construction of the improved WWTP. The Certified EIR analyzed a 3.6-mgd (average daily flow) wastewater facility, while the fully completed Project would construct a facility that can process up to 5.4 mgd (average daily flow). This was not previously analyzed in the Certified EIR. This Addendum analyzed processing up to 5.4-mgd but did not analyze disposal of this amount. Upon full buildout of the facility, it would only be able to dispose of up to 3.6 mgd (as this is what will be requested in the Report of Waste Discharge for the new plant). This Addendum only analyzes disposal of up to 3.6 mgd. Additionally, the proposed Project includes the future construction of pond 12. This pond is within the existing easement between the Navy and the City but was also not analyzed in the Certified EIR. The improvements would result in the construction of a new facility that would utilize primary clarifiers, extended aeration with activated sludge (oxidation ditches), secondary clarifiers to treat the wastewater, along with anaerobic digesters and cogeneration facilities to utilize the resulting biogas from the anaerobic digesters for power production. Further, the Project includes repairs to the existing infrastructure of the 11 treatment ponds that were damaged by earthquakes in 2019. While three other alternatives were presented in the EIR (not provided or discussed in this document), the current Project has been deemed the most appropriate and includes considerations such as cost, usability, maintenance, and lifespan of the equipment. Removed Project Components The proposed Project no longer includes the following components: • Construction of several new treatment ponds where the four percolation ponds currently exist in the southeastern portion of the City. • Irrigation of approximately 30 acres of alfalfa located 3.25 miles southeast of the Project site, at the former City WWTP. • The construction of an expanded gravity main pipeline. • The construction of a new WWTP south of the four existing percolation ponds in the southeastern portion of the City, along with several new treatment ponds at this site. No construction will take place in San Bernardino County. All construction will now take place on the NAWS site through an easement that the Navy has granted to the City.

Similar Contracts

Same NAICS industry code

NAICS: 237990
New
Haleiwa Small Boat Harbor Maintenance Dredging and Revetted Mole Repair
Solicitation # W9128A26BA002
Solicitation W9128A26BA002 is a firm-fixed-price contract issued by the U.S. Army Corps of Engineers Honolulu District for maintenance dredging and revetted mole repair at the Haleiwa Small Boat Harbor in Oahu, Hawaii. The project scope includes mobilization and demobilization, the dredging and ocean disposal of approximately 4,260 cubic yards of material to an approved offshore site south of Oahu, and the repair of the revetted mole involving stone rework, vegetation removal, and the installation of best management practices. The estimated contract value ranges from 1 million to 5 million dollars, with a performance period of 200 calendar days from the receipt of the notice to proceed. This opportunity is set aside for HUBZone small businesses, who receive a 10 percent price evaluation preference. Key requirements include the provision of performance and payment bonds, adherence to the Davis-Bacon Act, and the appointment of key personnel including a Project Manager, Project Superintendent, Quality Control System Manager, and Site Safety and Health Officer. Acceptance of the dredging work is based on multi-beam hydrographic survey data, while stone revetment is subject to visual inspection for defects. Bids must be submitted as sealed physical offers by September 30, 2026, as electronic submissions are not permitted. Liquidated damages for delays are set at 2,297 dollars per calendar day.
Healy Tibbitts Builders, Inc.

POSTED

about 11 hours ago

DEADLINE

in 8 days
View Details
NAICS: 237990
New
SLED
Mayo Park - Pond Creek Bank Improvements
Solicitation # 26-058
The Mayo Park Pond Creek Bank Improvements project is a construction effort by Santa Rosa County, Florida, designed to remedy severe creek bank erosion and enhance storm resiliency. The scope of work involves the excavation of unsuitable materials and the stabilization of approximately 100 linear feet of streambank using natural materials, including logs, tree limbs, stone, select fill, and native plantings. The project also includes an optional component, Bid Alternate A, which covers the repair of a damaged seawall along the western shore of the creek. All work must adhere to Santa Rosa County and FDOT standards, with technical oversight provided by Mott MacDonald. The contract is structured as a lump sum agreement with a substantial completion deadline of 120 calendar days and final completion within 150 calendar days from the notice to proceed. Financial terms include a 5% retainage on payments and liquidated damages of 1,685 dollars per day for delays. Bidders must provide a bid guarantee of 5% of the total price, and performance and payment bonds are required for contracts exceeding 200,000 dollars. The project is subject to various federal and state regulations, including the Build America, Buy America Act, the Davis-Bacon Act for prevailing wages, and Florida Statutes Chapter 119 regarding public records. A reimbursement agreement with the Florida Fish and Wildlife Conservation Commission provides a maximum compensation limit of 375,000 dollars for the stabilization efforts.
Engineering

POSTED

about 14 hours ago

DEADLINE

in 30 days
View Details
NAICS: 237990
New
Federal
LAKE PONTCHARTRAIN & VICINITY (LPV), FORESHORE RISK REDUCTION REPAIRS, REACH-1, 2, 3, & 4 Jefferson Parish, Louisiana (ED 24-006)
Solicitation # W912P826BA009
The U.S. Army Corps of Engineers, New Orleans District, is soliciting bids for the Lake Pontchartrain and Vicinity (LPV) Foreshore Risk Reduction Repairs project in Jefferson Parish, Louisiana. This unrestricted, firm fixed-price contract, identified by solicitation number W912P826BA009 and NAICS code 237990, has an estimated construction magnitude between $25 million and $100 million. The scope of work involves repairing existing foreshore protection and embankments across Reaches 1, 2, 3, and 4. Key activities include site access construction, demolition, clearing and grubbing, excavation, and the placement of embankment, geotextiles, and stone, as well as turf establishment and maintenance. Bids are due by 10:00 a.m. on October 19, 2026, with a question cutoff of October 2, 2026. Award will be made as a whole to a single bidder based on the provided unit prices, provided the bid is reasonable and balanced. The contractor must adhere to USACE EM 385-1-1 (2024) safety standards and FHWA MUTCD guidelines. Notable contract requirements include the use of approved testing laboratories, compliance with the Davis-Bacon Act, and the provision of performance and payment bonds. Liquidated damages for delays are set at $4,295.00 per calendar day. Performance begins following the approval of an Accident Prevention Plan and Contractor Quality Control Plan, with a preliminary project schedule due within 15 days of the Notice to Proceed.
W07V Endist New Orleans

POSTED

about 15 hours ago

DEADLINE

in 28 days
View Details

Ready to Pursue This Opportunity?

Get AI-powered intelligence on this solicitation and the ones like it

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 750+ contractors already using CLEATUS