Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, August 5 at 2:00 PM EDT

Register Free →

Downtown Commercial and Parking Structure Project

Active
State & Local

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

AI Contract Overview

Show more

The City of Upland, California, is undertaking a downtown redevelopment project to replace a 107-space surface parking lot with a five-tier parking structure capable of accommodating 407 vehicles, along with approximately 9,900 square feet of ground-floor commercial space. The project is located at the southeast corner of North 1st Avenue and East C Street and is being processed under California’s Environmental Quality Act as a Class 32 in-fill development exemption, confirming its alignment with urban zoning, minimal environmental impact, and consistency with the city’s general plan. The development is designed to enhance urban density and commercial vitality while integrating seamlessly into the existing city fabric. Although the project is publicly announced with a posting date of October 21, 2025, and a primary point of contact is identified as Josh Winter, Senior Planner at the City of Upland, no formal solicitation number, contract value, or procurement details are present. The available documentation consists of administrative filings including a Notice of Exemption, certified exemption findings, and a Department of Fish and Wildlife No Effect Determination, all supporting environmental compliance rather than detailing a competitive bidding or contractual award process. There is no indication of federal acquisition regulation clauses, contract type, delivery schedules, payment offices, inspection criteria, or evaluation factors typically found in federal contracts. Submission requirements for environmental compliance point to physical filings with the City of Upland and the Office of Planning and Research in Sacramento, with no electronic portal or standardized proposal format outlined, and no defined period of performance or award mechanism has been established in the materials provided.

General Info

Upland to build 407-space parking structure with 9,900 sq ft commercial space under environmental exemption.

Agency

California → City of Upland

NAICS

237990 - Other Heavy and Civil Engineering ConstructionView NAICS

Place of Performance

Upland, CA

Set-Aside

NONE

Documents

(1)

Notice of Exemption for Downtown Commercial and Parking Structure Project

PDFnotice-of-exemption

AI Contract Breakdown

Uniform Contract Format

Sign up to view the full breakdown with detailed analysis of each section.

Timeline

Posted

forecast

Ready to pursue this opportunity?

Start your free trial to track this contract, build proposals with AI assistance, and manage your pipeline.

Organization & Contact Information

Show more
AgencyCalifornia → City of Upland
Contacts1 person available
OfficeN/A
Organization / Agency
California → City of Upland
Office AddressN/A
Contacts
Josh WinterSenior Planner

Full Description

Show more
The project would redevelop a 107-space asphalt surface parking lot with an approximately 150,000-square-foot, five-tier parking structure (407 parking spaces) and approximately 9,900 square feet of ground floor commercial uses.

Similar Contracts

Same NAICS industry code

NAICS: 237990
New
SLED
AIRFIELD 2029 ALL PROJECTS (AIP / AUI / CIRCUITS / FOD) CombinedThe contract encompasses a broad range of airfield infrastructure improvements at the Port of Seattle, focusing on modernization and safety enhancements across multiple systems. Key components include replacing airfield lighting circuits with low megger readings with new LED fixtures and signs to improve reliability and energy efficiency, replacing deteriorating pavement and critical utilities to maintain operational integrity, and implementing comprehensive wildlife hazard management measures such as removing turf edge dams, installing anti-perching devices on signs, and regrading areas with new storm drainage to eliminate ponding and reduce bird attractants. Additionally, failing flush fire hydrant access hatches will be replaced to ensure rapid and unobstructed access for emergency response. The project is part of the AIRFIELD 2029 ALL PROJECTS initiative, classified under NAICS code 237990 for other heavy and civil engineering construction, and is managed by the Aviation Project Management Group under the Port of Seattle. Solicitations are open with a posted date of July 31, 2026, and inquiries should be directed to Yanet Maldonado, the primary point of contact. The work is critical to maintaining airfield safety, regulatory compliance, and long-term operational readiness, with all efforts centered on upgrading aging infrastructure to meet current aviation standards.
Aviation Project Management Group

POSTED

about 9 hours ago

DEADLINE

N/A
View Details
NAICS: 237990
New
SLED
AIRFIELD 2030 ALL PROJECTS (AIP / AUI / CIRCUITS / FOD) CombinedThe contract encompasses a broad range of airfield infrastructure upgrades at the Port of Seattle, focusing on enhancing safety, efficiency, and compliance. Key components include replacing aging airfield lighting circuits with low megger readings with modern LED fixtures and signs to improve visibility and reduce maintenance costs. Concurrently, failing pavement sections and critical utilities will be removed and replaced to ensure structural integrity and operational reliability. Wildlife hazard mitigation measures involve removing turf edge dams along runways, taxiways, and access roads, installing anti-perching devices on signs to deter birds, and addressing ponding issues through regrading and new storm drainage infrastructure. Additionally, deteriorating flush fire hydrant access hatches will be replaced to ensure rapid access for emergency response teams. The project is categorized under NAICS code 237990 and falls under the Aviation Project Management Group, with the Port of Seattle as the overseeing agency. The solicitation is posted as a forecast with no set-aside classification, indicating it is open to all eligible contractors. Primary point of contact for inquiries is Yanet Maldonado, reachable via email or phone, and additional details can be accessed through the provided portal link. The project is anticipated to begin after the posted date in July 2026, with all work taking place at the airport facility.
Aviation Project Management Group

POSTED

about 9 hours ago

DEADLINE

N/A
View Details
NAICS: 237990
New
SLED
EXT REC | CMD Micro-Set-Aside - CON27-0005 GGP ADA
Solicitation # CON27-0005
This contract is a Micro Local Business Enterprise (LBE) Set-Aside solicitation for the GGP ADA Parking Project under identification CON27-0005, with a cost estimate of $550,000. Only firms certified as Micro-LBEs by the City and County of San Francisco’s Office of Economic and Workforce Development are eligible to bid, and the winning bidder must self-perform at least twenty-five percent of the total contract value. While subcontracting to other Micro-LBEs is encouraged, it is not required. The project falls under the Neighborhood LBE Pilot Program, which provides additional bid discounts to firms whose principal place of business is within Supervisorial District 1 and the specified zip code of 94121, where the work will be performed in Golden Gate Park. The project is governed by the Administrative Code provision 14B.7(K), requiring certification alignment with contractor licensing standards. The pre-bid meeting will be held on August 6, 2026, at the corner of Martin Luther King Dr. and Hagiwara Tea Garden Drive, and all inquiries must be submitted by August 13, 2026. Bids are due by August 27, 2026, at 2:30 p.m., and must be submitted electronically. The contract is administered by the San Francisco Recreation and Parks Department, with designated points of contact for questions and submissions, and is classified under NAICS code 237990 for Other Heavy and Civil Engineering Construction.
San Francisco Recreation and Parks

POSTED

1 day ago

DEADLINE

in 26 days
View Details