Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, November 11 at 2:00 PM ET

Register Free →

Oceanside Sand Nourishment and Retention Project

Forecast
2025100834State & Local

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

General Info

Agency

California → City of Oceanside

Place of Performance

First Street and the Strand, Oceanside, CA, 92054

Set-Aside

NONE

Documents

0

No documents available

Documents will appear here when they are available.

AI Contract Breakdown

Uniform Contract Format

Sign up to view the full breakdown with detailed analysis of each section.

Timeline

PhaseForecast
Posted

forecast

Prepare for this forecast

Research the agency, track this forecast, and prepare your capture plan before the solicitation opens.

Organization & Contact Information

Show more
AgencyCalifornia → City of Oceanside
Contacts2 people available
OfficeN/A
Organization / Agency
California → City of Oceanside
Office AddressN/A
Contacts
Jayme TimberlakeCoastal Zone Administrator
Nick LarkinEnvironmental Program Manager

Interested Companies (1)

RECON EnvironmentalSan Diego, California

Full Description

Show more
The Oceanside Sand Nourishment and Retention Project (project) is being implemented in response to chronic beach erosion, disruption and reduction of coastal sediment supply, increased shoreline vulnerability associated with climate change, and the need for more effective coastal management in the City of Oceanside (City). Since construction of the Camp Pendleton Boat Basin and the City’s Small Craft Harbor, over 21 million cubic yards of sand have been artificially placed on City beaches from either dredging activity to build the two harbors; the removal of sediment from the San Luis Rey River; the U.S. Army Corps of Engineers annual navigation dredging program; or one-off, local or regional beach nourishment events. Despite these efforts, coastal areas south of Harbor Beach (i.e., south of South Jetty) have been largely unable to sustain a dry sand beach for recreational, ecological, and coastal storm-damage protection purposes. The overarching purpose of the project is to enhance coastal resilience along the City’s shoreline by developing, testing, and refining scalable adaptation strategies that are technically feasible, financially sustainable, and environmentally and socially responsible. The project is designed to address chronic beach erosion, protect coastal infrastructure, and improve public access and recreational opportunities. Project-specific details are presented below. RE:BEACH Pilot Project The site-specific RE:BEACH Pilot Project would consist of the following four primary components: • Two Headlands • One Offshore Reef • Onshore Beach Nourishment • Nearshore Nourishment The headlands would be constructed at the seaward terminus of Tyson Street and Wisconsin Avenue, respectively. The headlands would be designed to stabilize sand along the backshore and reduce, but not eliminate, the longshore transport of sediment in the project location. The offshore reef would be located approximately 900 feet offshore, between the headlands, and would function to dissipate wave energy and promote salient formation (i.e., sand deposition). Onshore nourishment would place sand sourced from an offshore borrow site (see Figure 2) along the beach from First Street (just south of the Oceanside Pier) to Oceanside Boulevard, while nearshore nourishment would supplement sediment in the surf zone. Permitting and design are anticipated to occur between 2025 and 2027, followed by reef and headland installation coupled with nourishment activities in approximately 2028, depending on permitting and fundraising. Design of the offshore reef is intended to dissipate wave energy through wave shoaling and breaking, which would stabilize the sand bars and beach in its lee (i.e., shoreward side of the reef). Waves breaking on the reef would contribute to slowing the rate of longshore sediment transport along the beach and creating a salient sand bar that mimics natural offshore reef structures along the California coast. The reef may provide improved surfing in the lee (i.e., landward) of the reef due to refraction around the structure and sandbar creation (i.e., landward and north/south); however, it is difficult to predict this outcome. The two headlands would be positioned on the shore, both north and south of the reef, at Tyson Street and Wisconsin Avenue, respectively. The headlands would provide recreational amenities, coastal viewing, beach access, and marine safety improvements, as well as assist with beach stabilization. The headlands are designed to complement the salient in the lee of the reef and increase beach stabilization in this area. The RE:BEACH Pilot Project would include a robust monitoring and adaptive management framework with the intent to generate site-specific data, evaluate performance under dynamic coastal conditions, and inform future shoreline management decisions. The monitoring and adaptive management framework would also serve as a platform to engage the community, integrate regional sediment management efforts, and support long-term coastal management and adaptation to sea level rise planning. Ultimately, the RE:BEACH Pilot Project is intended to serve as a replicable model that balances environmental stewardship, public safety, and recreational use across the broader City coastline. RE:BEACH Program The RE:BEACH Program would provide for phased implementation of additional coastal resilience strategies throughout the southern shoreline of the City to increase climate resilience, beach retention, coastal access and recreation, sandy beach habitat, and support longer term policy planning. The RE:BEACH Pilot Project described above includes a robust monitoring and adaptive management framework to evaluate performance under dynamic coastal conditions and inform future shoreline management decisions. The results of the monitoring and adaptive management framework would inform general siting criteria, facility types, design considerations, construction methods, and operations to support implementation of additional phases under the RE:BEACH Program. A majority of the gathered data from the monitoring program would also inform baseline conditions throughout southern segments of the coastline. The additional phases would similarly address the coastal resilience and management goals of the City and would be discussed thoroughly in an Adaptive Monitoring and Management Plan. Future phases under the RE:BEACH Program may include the following: • Additional nourishment actions onshore and/or in the nearshore • Additional headland features along the City’s shoreline • Additional reef features installed offshore the City’s shoreline • Related upgrades to coastal accessways (e.g., stairs), public spaces, and marine safety infrastructure (e.g., lifeguard access and assets) • Long-term monitoring instruments Future phases of the RE:BEACH Program would be implemented after monitoring the performance of the RE:BEACH Pilot Project, which would inform the necessary scale and location of future facilities. The RE:BEACH Program evaluated in the Program Environmental Impact Report assumes up to two additional phases within two individual segments along the City’s coastline that would both consist of a reef, up to two headlands, and onshore and nearshore beach nourishment. Again, at this time those future phases are conceptual and would be informed through monitoring the performance of the RE:BEACH Pilot Project. They would be included and evaluated through this Program Environmental Impact Report to provide the City additional opportunities to plan for comprehensive resilience approaches for the broader City shoreline.

Similar Contracts

Same NAICS industry code

NAICS: 237990
New
SLED
Carroll Creek Stream Restoration - CIP# 350007 (MWBE Goals)
Solicitation # IFB-27-11
The City of Frederick is soliciting bids for the Carroll Creek Stream Restoration project (CIP# 350007), located near Old Gas House Pike and Fairview Cemetery in Frederick, Maryland. This comprehensive construction project involves in-stream structure installation, floodplain bench grading, bank stabilization, and extensive planting. Key technical requirements include the installation of reinforced soil lifts, rock sills, and various riparian plantings, with an engineer's estimated project cost of $6,884,784.12. The project is performed on a lump sum and unit price basis and requires strict adherence to Virginia OSHA Standards for excavation and Maryland Department of the Environment guidelines for waterway construction. The bid submission deadline is November 13, 2026, at 3:00 pm, with all responses submitted via the OpenGov Portal. Bidders must meet specific socioeconomic goals, including 31% MBE, 11% WBE, and 2% SDVOSB participation. Required financial securities include a bid bond of 5% of the bid price, followed by 100% performance and materialmen's bonds upon award, and a two-year maintenance bond upon completion. The contract includes a two-year guarantee on all work and stipulates liquidated damages of $500 per calendar day for delays beyond the substantial completion date. Award decisions will be based on the vendor's responsiveness to material requirements and their overall responsibility, including technical capacity and performance record.
Engineering

POSTED

about 2 hours ago

DEADLINE

in 7 days
View Details
NAICS: 237990
New
SLED
9801 - Madison LakeWay - SkyLine Improvements
Solicitation # 9801
Contract 9801 for the Madison LakeWay – SkyLine Improvements is a solicitation by the City of Madison for the construction of a half-mile linear parkway along the shoreline of Lake Monona adjacent to John Nolen Drive. The project scope is divided into a Base Bid, covering the installation of north and south pile-supported timber-framed boardwalks, pedestrian-scale lighting, enhanced paths, bicycle amenities, wayfinding signage, and extensive landscaping, and an Alternate Bid Item for the construction of the SkyLine Pier. The project also requires significant traffic control, including the implementation of vehicular and bicycle detours and the installation of curb, gutter, and colored concrete medians. The contract will be awarded to the lowest bidder based on unit prices and a grand total. Bidders must provide a bid bond of at least 5 percent of the bid and comply with strict Small Business Enterprise (SBE) participation goals and reporting requirements. Additionally, contractors must adhere to Best Value Contracting apprenticeship standards and non-discrimination policies. Technical requirements include the use of a Wisconsin-registered Professional Engineer for precast and connection designs, adherence to ADA guidelines for signage, and the provision of site mock-ups for masonry, metal, and wood elements. Construction must commence within seven calendar days of receiving a written notice to proceed.
City of Madison

POSTED

about 3 hours ago

DEADLINE

in about 1 month
View Details
NAICS: 237990
New
SLED
22275 RB - Hague NE Bulkhead Rehabilitation
Solicitation # 22275 RB
The City of Norfolk, Virginia, is soliciting bids for the Hague NE Bulkhead Rehabilitation project (Solicitation 22275 RB), which involves the replacement of the concrete bulkhead at the eastern portion of the Hague. The scope of work includes bypass pumping, maintenance of flow in storm drainage systems, survey and vibration monitoring, wetland planting, and the disposal of contaminated soils, estimated at 695 tons for the North side and 315 tons for the South side. The project is structured as a Base Bid with three additives, with several items converted to lump sum costs. Performance must adhere to modified AIA A201-2017 General Conditions and technical specifications prepared by Moffatt & Nichol. The contract requires a performance bond and a labor and material payment bond, each for 100% of the contract price, and a bid security of 5% of the total bid. Work must commence within ten days of the Notice to Proceed and be completed within 700 calendar days. Bidders must be registered Virginia contractors and hold a City of Norfolk business license. All bids must be submitted electronically via the OpenGov portal by December 7, 2026, with all Requests for Information (RFIs) due by November 16, 2026. Quality control is managed through a CQC Plan and VDOT Form C-25, with final site inspection and acceptance conducted by the Contracting Engineer.
Public Works (D&C)

POSTED

about 7 hours ago

DEADLINE

in about 1 month
View Details
NAICS: 237990
New
Federal
Maintenance Dredging of the Isle au Haut Thoroughfare near Isle au Haut, Maine
Solicitation # W912WJ27BA003
Solicitation W912WJ27BA003 is a 100 percent small business set-aside for the maintenance and advance maintenance dredging of the Isle au Haut Thoroughfare Federal Navigation Project in Maine. The project involves mechanically dredging approximately 3,355 cubic yards of highly compacted coarse sand, gravel, cobbles, and small boulders from a 1,200-foot long channel to a depth of -7 feet Mean Lower Low Water, with an additional one-foot allowable overdepth for a maximum depth of -8 feet. All dredged material will be transported and placed at the Flake Island Disposal Site to enhance juvenile lobster and cod habitats. The estimated price range for this effort is between 1,000,000 and 3,000,000 dollars. Performance is strictly governed by an environmental window from September 15, 2026, to March 15, 2027, with all dredging and disposal activities required to be completed by March 1, 2027. The mandatory performance period is 120 calendar days after the receipt of the Notice to Proceed. Award is based on a sealed bidding process under NAICS 237990, requiring performance and payment bonds. Contractors must utilize the Procurement Integrity Enterprise Environment for submissions and adhere to a three-phase quality control process, including preparatory, initial, and follow-up inspections, with all documentation managed via a Construction Management Platform.
W2SD Endist New England

POSTED

about 8 hours ago

DEADLINE

in 4 days
View Details
NAICS: 237990
New
Federal
Borough of Millvale, Pennsylvania, Local Protection Project (LPP) PL84-99 Rehabilitation
Solicitation # W911WN27QA004
The Borough of Millvale Local Protection Project (LPP) rehabilitation is a USACE project located along Girty's Run in Millvale Borough, Pennsylvania. The scope of work involves repairing significant flood damage from April 2024, specifically addressing bank erosion, shoaling, ruptured gabion baskets, and washed-out concrete buttresses that currently impede streamflow. The contractor will be responsible for site preparation, including erosion and sediment controls and temporary water diversions, as well as the excavation and removal of debris, replacement of damaged concrete paving and gabions, and the placement of stone-filled gabions between Station 68+00 and Station 73+80. This is a 100% Small Business Set-Aside under NAICS 237990, with an anticipated construction cost between $300,000.00 and $350,000.00. The award will be a single Firm-Fixed-Price purchase order based on best value, evaluating price and past performance. The project must be completed within 365 calendar days of the written Notice to Proceed, with work commencing within 10 days of that notice. Key requirements include the provision of performance and payment bonds at 100% of the contract price, adherence to the Davis-Bacon Act, and the appointment of a Superintendent who cannot also serve as the Site Safety and Health Officer.
W072 Endist Pittsburgh

POSTED

about 8 hours ago

DEADLINE

in about 1 month
View Details

Earlier notices in this NAICS code

Posted before this notice, open and closed

Prepare for this forecast

Research this forecast and prepare for the solicitation

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 750+ contractors already using CLEATUS